Booster Bias Supply Upgrade March 13, 2013. Three New Ferrite Bias Supplies Two are working and installed. One in MI station #5, one in Booster station.

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

J.P. Langston Brake Retrofit
IST IT Services Intern Program Quiz Lessons Summary Links Home How to Make Network Cables In this lesson you will: –Determine what length cable is needed.
Cylinder Blocks.
UNIT -6 Rapid Tooling.
ModICE Modular Integrated Connector Enclosure
LCW Upgrades - Final Booster RF Cavity LCW Isolation Valve Replacement. – 8 valves and unions previously replaced – An additional 10 valves and unions.
Booster Bias Supply Upgrade April 2, First prototype was started in December The back half of the supply was totally gutted Transformer Interphase.
Introduction to B-tek “Digital” load cell Shows complete assembly as in the “Centurion” Truck Scale. Shows complete assembly as in the “Centurion” Truck.
Sheeter Retrofits Featuring E.C.H. Will and Jagenberg Tension Control Upgrades.
Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
Global Lift Corp ADA Laws & Commercial Series Lifts.
Unit 204: Common plumbing processes
1 Peter Monaghan“Hall C January 2011 Users Meeting”15 th January 2011 SHMS Wire Chamber Update RECAP from August Review: Vendor price quote 5x larger than.
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
Tom Kubicki.  Booster HLRF System to be upgraded using 1kW Solid State Driver (SSD) Amplifiers.  Used to drive the 200kW Power Amplifier  Eliminates.
Installation. Indoor Unit Installation Typical Installation.
The art of Engineering
NBI March 2002 The MiniBooNE Horn Ioanis Kourbanis For The MiniBooNE Collaboration.
AdvantagesDisadvantages One former can last a life time and be used over and over again without damage to it. Can take a long time to manufacture a former.
Diodes Analog Electronics UNIT III. Diodes UNIT I Objective The student will use diodes, capacitors, regulators and LEDs through a rectifying system in.
Fermilab Cavity Refurbishment Status J. Reid M. Slabaugh November 19, 2014 J. Reid 1.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
7/11/01Steven Hays E/E Support Page 1 NuMI Beam line Power Supplies  The supplies in the line is detailed  Main Ring Style…………………..…1  PEI/Transrex.
Batteries The purpose of the battery is to act as a reservoir for storing electricity.
MTA Cryogenics: Where We Are The Work of Fermilab AD/Cryo Barry Norris, Christine Darve and a host of wonderfully talented Cryogenic Personnel John Thompson,
March 19, ” Leg Valve Changeout. Required Tools and Materials 3” Wrench 9/16” Wrench 11/16 Wrench Seal Pick Clean hydraulic fluid.
Booster 15Hz Operation John Reid March 4, Fermilab March 4, 2014J. Reid 2 Scope Brief History of Booster RF systems RF system description Modifications.
EMISSION PROBE PARTS TUBE: 3/8” OD x wall Stainless Steel Length determined by pipe diameter and placement of connecting end to allow easy connection.
All Experimenters Meeting PIP Report William Pellico on behalf of PIP team 4/7/2013.
Инвестиционный паспорт Муниципального образования «Целинский район»
Booster Bias Supply Upgrade November 30 th, 2011.
2015 Shutdown Joe Compton 3/11/2015. RIL PIP Work  Install operational laser notcher  5 days  Dave Johnson & Todd Johnson.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
(x – 8) (x + 8) = 0 x – 8 = 0 x + 8 = x = 8 x = (x + 5) (x + 2) = 0 x + 5 = 0 x + 2 = x = - 5 x = - 2.
TE/MPE/EE J. Mourao T/MPE/EE 23 December 2012 LHC Machine Redundant Power supply (DQLPUR) & interface Module (DQLIM) assembling during LS1.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
Developing Standard and Metric Measuring Skills
Refurbished Booster RF John Reid October 24, 2012.
Refurbished Booster RF John Reid December 12, 2012.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
NCSX VACUUM VESSEL HEATING/COOLING PL Goranson Preliminary Results February 17, 2006 MDL Testing of Coolant Tracing NCSX.
PIP Budget Codes Budget FY12 Updates October 19, 2011 PIP Meeting.
Booster Bias Supply and Cavity Upgrade November 16 th, 2011.
IET 330 Industrial Design Group 4 Improving Efficiency and Productivity at SealMaster Elizabeth McClain Richard Cantrell.
Lithium Hydride Absorber Program C. M. Lei March 17, 2008.
PIP Update April 3 rd Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Trevor.
Solid State Driver Upgrade Update 1kW Solid State Amplifiers – 32 have been tested and calibrated. – 50 have been built so far. Small heat sinks for the.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
03/30/2009F.G. Garcia Linac Group Meeting – March 30, 2009 Agenda: 1) Linac week’s performance 2) Ongoing projects – Status report 3) AOB.
August 2007 Booster RF Upgrades J.Reid Booster RF Upgrades West Gallery LCW modifications: – Headers in select locations to be upgraded by.
Update: Puck and Gun Magnet March 1, Magnetized Gun 2 K 2 CsSb Preparation Chamber HV Chamber.
PIP Update March 6 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
Intensity Dependent Quad Ramps We know that in order to get the most intensity, the quad ramps must be tuned for a particular intensity. The way this is.
Unico Tips and Tricks. First Steps Layout and material list to be done by the salesman Wear Hospital Style Booties, if working in a non-drop cloth area.
照片档案整理 一、照片档案的含义 二、照片档案的归档范围 三、 卷内照片的分类、组卷、排序与编号 四、填写照片档案说明 五、照片档案编目及封面、备考填写 六、数码照片整理方法 七、照片档案的保管与保护.
공무원연금관리공단 광주지부 공무원대부등 공적연금 연계제도 공무원연금관리공단 광주지부. 공적연금 연계제도 국민연금과 직역연금 ( 공무원 / 사학 / 군인 / 별정우체국 ) 간의 연계가 이루어지지 않고 있 어 공적연금의 사각지대가 발생해 노후생활안정 달성 미흡 연계제도 시행전.
Жюль Верн ( ). Я мальчиком мечтал, читая Жюля Верна, Что тени вымысла плоть обретут для нас; Что поплывет судно громадней «Грейт Истерна»; Что.
Booster High Power RF at PIP-II Era John Reid February 18, 2014.
Update on the PSB Cooling and Ventilation Systems
HAMANASI Truss Installation Graphics February 2014
ModICE Modular Integrated Connector Enclosure
Complementary ISTC Projects #3888, 3889p
Far Detector Activities Late 2017 – Early 2018
EN-CV interventions during EYETS for PS and PSB
Date of download: 3/7/2018 Copyright © ASME. All rights reserved.
ISF3.8 oil filter shell change
AUTOTRANSFORMERS.
LARP Phase II Secondary Collimator RC-0 and RC-1
I find that the Corson spin-on filter adapter to have several flaws in it. Fortunately they are easily corrected by proper re-machining. It is work that.
Presentation transcript:

Booster Bias Supply Upgrade March 13, 2013

Three New Ferrite Bias Supplies Two are working and installed. One in MI station #5, one in Booster station #10. Last one is being checked in the test station at MI-60. Ferrite bias Supply Upgrade First six transformers received. All SCR’s have been received. All heat sink parts received. First supply to be retrofitted now at MI-60.

First six transformers received. First three not sealed completely. Have the epoxy to finish the job. Second set of three were sealed correctly. Modifications from previous order implemented. Only way to fully test one of them will be to install in existing supply. Plan is to start this when the last new bias supply is fully functional. Heat sink assembly. Need to braise 216 assemblies (3x6x12). Send them out for tin plating. Assemble flexible copper straps. Assemble SCR Package: heat sink, SCR, SCR clamp.

First retrofit of old style Mark I  Determine how much of a tear down is necessary  Mark I: ◦ Much smaller Transformer. ◦ Transformer is flipped 180 degrees from Mark III. ◦ Front and back half is separated by a wall. ◦ Different style (larger) active filter.  Determine what new parts need to be machined.