Linac Status May 19, 2015 Time Meeting D. Raparia.

Slides:



Advertisements
Similar presentations
Overview of the GlueX Tagger and Photon Beamline..
Advertisements

Maintenance and Accelerator Support RHIC Run 12. RHIC species change completed: Major works in RHIC: Major works in RHIC: Power supply reconfigure (DO.
The applications of FA-M3 PLC used in SSRF ZHOU Dayong
Proton Plan PMG 7/26/07 E Prebys 1 Proton Plan Status June Eric Prebys.
Summary of the discussion for the commissioning session 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 6/ 1/ 2006 T.Okugi (KEK)
G2P Target installation and Beyond. Schedule Pivot before.
FNAL Linac Downtime Overview Proton Source Workshop Fernanda G. Garcia Accelerator Division Proton Source Department December 7-8, 2010
MICE Target Review Chris Booth Sheffield 12 th June 2006.
SNS Integrated Control System SNS Machine Protection System EPICS Workshop April 27, 2005 Coles Sibley.
UCN Phase 2 Design Status September 10, Design Components Bulk Shielding Target Crypt Cryogenic Insert Target Insert UCN Port Beam Window Cooling.
1.4b Charging System 1. Charging System Function of the charging system 2 Convert mechanical energy into electrical energy Recharge battery Provide higher.
7/11/01Steven Hays E/E Support Page 1 NuMI Beam line Power Supplies  The supplies in the line is detailed  Main Ring Style…………………..…1  PEI/Transrex.
September 12, 2013 PSTP 2013 G. Atoian a *, V. Klenov b, J. Ritter a, D. Steski a, A. Zelenski a, V. Zubets b a Brookhaven National Laboratory, Upton,
Maintenance and Accelerator Support RHIC Run 12. Accelerator Status: Complex is running for Physics. Complex is running for Physics. Checkout for NSRL.
05/30/08J. Dunne -- SANE Collaboration Meeting 1 Beamline Status Upstream beamline –Chicane –SEM –Rasters –Girder Downstream beamline –Helium bag –Extension.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
Maintenance and Accelerator Support RHIC Start Up 12.
Booster Bias Supply Upgrade November 30 th, 2011.
Commissioning Status of Shintake Monitor (IP-BSM) T. Yamanaka, M. Oroku, Y. Yamaguchi, Y. Kamiya, S. Komamiya (Univ. of Tokyo), T. Okugi, N. Terunuma,
Maintenance and Accelerator Support RHIC Start Up 12.
RHIC Run 12 7 th Time Meeting 21 February 2012 WELCOME Safety SP's slide Experiments and Machine, status 1 02/21/2012 Time Meeting, Run 12.
May 06, 2013 Photo by Greg Vogel. Thursday, April 18, some tunnel work had to be suspended and many planned jobs had to be postponed due to the flooding.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
LCWS13, November 2013 At the University of Tokyo W.–D. Möller Status of the TTF3 RF Power Coupler.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
1 G9a -FROST. 2 Experiments FROST New generation of CLAS photoproduction experiments with FROzen Spin Polarized Target (FROST) E02-112: γp→KY (K + Λ,
Linac Status June 16, 2015 Time Meeting D. Raparia.
OPPIS performances in Run-6. First 4 weeks. RSC meeting, February 10, 2006.
MIT-Bates Laser Driven Target Introduction Achieved and expected results Installation plan and timeline B. Clasie, C. Crawford, D. Dutta, H. Gao, J. Seely,
All Exp Mtg July 7, 2008 NuMI-MINOS Status Report – Laura Loiacono FAR DETECTOR: FD live time was 95.7% for cosmics last week (ROP7 problems reported at.
A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator.
26 May 2015 Run 15, Time Meeting Agenda: Take 5 for safety E. Lessard Schedule P. Pile Linac Status D. Raparia AGS Status V. Schoefer Cryo Status R. Than.
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
Bill White Commissioning October 9, 2006 Drive-Laser Commissioning Status and Plans Requirements Where do we stand today?
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
BLIP Operations – 162 days of operation o Safety o Forklift needs a new tire o Production o Sr-82 targets out of beam as of 14 Jun o New Sr-82 targets.
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
Gen Magnet Design JLAB MENG Contributors: Supervisor: Butch Dillon-Townes Magnet Engineer: Robin Wines Mechanical Designer: Ron Lassiter Mechanical Engineer:
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
1. A loop or wire with a radius of 0.78 m is in the plane of this page, and is rotated so that the loop forms a 23.0 o angle with the page. If there is.
Proton Driver – Target Station Interfaces Keith Gollwitzer Fermilab Wednesday May 28, 2014 MAP 2014 Spring Meeting.
Machine Status  Proton Source Commissioning and Studies 8/13-8/14: Linac & Booster Maintenance Period  Main Injector MI30 vacuum ○ Work continues to.
RHIC Run14 Time Meeting. Run14 Status – May 27 Operations running well, 11 full stores over the past 7 days. Getting high intensity again from injectors,
RHIC Run14 Time Meeting. Run14 Status – June 24 Run14 He3-Au physics declared on 6/20 with Fill #18460; stochastic cooling is ON for Au beam, longitudinal.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
Run Coordnator Report 2012/04/ /04/10 Jixie Zhang
03/30/2009F.G. Garcia Linac Group Meeting – March 30, 2009 Agenda: 1) Linac week’s performance 2) Ongoing projects – Status report 3) AOB.
All Experimenters’ Meeting September 23, Accelerator Operation Summary Calendar Week # 38 NuMI Weekly Integrated Intensity 4.57 E18 protons BNB.
Injector Status & Commissioning QWeak Collaboration Meeting May 24, 2010 P. Adderley, J. Clark, S. Covert, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
March 4, 2013 Photo by Martin Murphy. Shutdown 2012 Machine Status: Linac running with NTF Treatments, RFQ and Linac commissioning Booster beam commissioning.
All Experimenters’ Meeting November 25, 2013 Photo by Martin Murphy.
All Experimenters’ Meeting November 4, Accelerator Operation Summary Calendar Week # 44 NuMI Weekly Integrated Intensity 5.97 E18 protons BNB.
July 29, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Trying to.
Accelerator Support and Maintenance Startup for Run 13.
Brian Drendel May 21, Stacking Pbars stacked: E10 Time stacking: Hr Average stacking rate: E10/Hr Uptime Number of pulses.
+ Electric Circuits Series Circuits. + A Battery and a Bulb A flashlight consists of a reflector cap, a light bulb, batteries, and a barrel-shaped housing.
September 12-13, 2013 BNL Laser Profile, Energy and Space Charge Potential Monitor Deepak Raparia September 26, 2013.
Linac Weekly Operational Report May 9 th – May 16 th 2008.
Preinjectors Status D. Raparia January 26, 2016 Time Meeting.
Preinjectors Status D. Raparia March 22, 2016 Time Meeting.
Preinjectors Status D. Raparia April 26, 2016 Time Meeting.
SANE Magnet Review ● Repaired polarized target magnet was successfully energized and put in persistent mode on 12/18/08 after the review, following the.
The Survey of the Power Supply Reliability at SSRF
Facility upgrade Housekeeping, rad waste segregation, chemicals, safety issues, new configurations. Please see me or Keith.
Electro-Magnetic Induction
500 nm WRITE VOLTAGE 0 V.
Cu67 Isotope Radiator & Target
Presentation transcript:

Linac Status May 19, 2015 Time Meeting D. Raparia

2 Status l Linac running in good condition for polarized proton program and BLIP l After last week OPPIS maintenance is low polarization but improving by time, will be determined today if maintenance is needed tomorrow behind APEX l Mod-3 driver keeps tripping since last Thursday

Average Current and Beam on HRS for BLIP D. Raparia 3 Research Target, Mod 3 driver cart and SCR fan NM065 chipmunk fail

Mod-3 Driver trips - Replaced SCR fan - Paced 100 uF cap across air flow switch, - Replace driver cart - Replace filament bias power supply - Replaced air flow switch - Bypass “4616 bias fault”, to get fault below - Jennings fault, rewire Jennings switch - Adjusted Filament bias voltage D. Raparia 4

FWHM (mm) at Harp 1 and 2 D. Raparia 5

Beam Center (mm) at Harp1 and 2 D. Raparia 6

Beamline Location 7 1.plunging harp ” collimator 3.bellows (3x) 4.raster magnet 5.steering magnets (existing, 2x) ” collimator 7.plunging harp (opposite side) 8.laser profile monitor 9.beam current transformers (2x) 10.beam position monitor 11.beryllium window (existing) 12.aluminum bellows (existing) 21’ 14’

HARP1 D. Raparia 8

HARP2 D. Raparia 9