Beamline Controls with EPICS at NSLS Zhijian Yin NSLS, BNL EPICS Collaboration Meeting, SSRF, March 2008.

Slides:



Advertisements
Similar presentations
Layered EPICS User Gap Control Interface for NSLS Mini-gap Undulators William Nolan and John Skinner, Biology Department Susila Ramamoorthy and Lonny Berman,
Advertisements

EPICS Noboru Yaamamoto Jan 27, 2009 for EPICS seminar at RRCAT, Indore Installing EPICS.
17th Oct 08 Matthew Pearson - Motion Control at DLS 1 Motion Control Developments at Diamond Light Source Matthew Pearson DLS Controls Group.
Wayne Lewis Australian Synchrotron Beamline Controls Design and Implementation.
EPICS at APS Beamlines Tim Mooney Advanced Photon Source Argonne National Laboratory.
Data Acquisition System for 2D X-Ray Detector Beijing Synchrotron Radiation Facility (BSRF) located at Institute of High Energy Physics is the first synchrotron.
Elder Matias CLS Control System Recent Upgrades. Major Changes Synchrotron Upgrade New Isotope Production Linac EPICS Software –Python EDM –Aquaman –ScienceStudio.
Linux-MVME Targets Using Motorola Board Support
EPICS Meeting, APS, June 14 th 2006 MCS-8 The 8 axes motion control system Rok Šabjan
Agenda Adaptation of existing open-source control systems from compact accelerators to large scale facilities.
Data Acquisition at the NSLS II Leo Dalesio, (NSLS II control group) Oct 22, 2014 (not 2010)
Elder Matias Canadian Light Source University of Saskatchewan CLS – Control System Overview.
Single Board Computers and Industrial PC Hardware at the CLS
SSRF Beamline Control System
EPICS Insertion Device Control System Pete Owens EPICS Collaboration Meeting June 2003 Control System for a Helical Undulator Pete Owens Daresbury Laboratory.
Control System and Software Engineering Process Elder Matias
Laboratoire Interdisciplinaire sur l’Organisation Nanométrique et Supramoléculaire DIRECTION DES SCIENCES DE LA MATIERE IRAMIS TANGO at LIONS Olivier Taché.
SPEAR Insertion Device Controls Upgrade Status Arturo Alarcon January, 2014.
Main Bullet #1 Main Bullet #2 Main Bullet #3 EPICS and CLS September 18, 2009.
CBASS for Beamline Control Software Development: John Skinner Matt Cowan Rick Buono Chris Dropp Leon Flaks Scientific Support: Annie Heroux Howard Robinson.
CLS: Control System E. Matias, R. Berg, G. Wright, T. Wilson, T. Johnson, R. Tanner and H. Zhang Canadian Light Source University of Saskatchewan Invited.
Operated by Los Alamos National Security, LLC for NNSA U N C L A S S I F I E D LDAQ – the New Lujan Center Data Acquisition Application Frans Trouw, Gary.
EPICS for Experiments. Programme 09:30: Introduction to EPICS (Nick Rees) 09:45: Asyn (Jon Thompson) –C++, extending AsynPortDriver base class –Parameters,
Conversion to EPICS R3.14 Mark Rivers. New capabilities Progress in converting synApps/GSECARS Outstanding issues Work to be done Outline.
Dec 8-10, 2004EPICS Collaboration Meeting – Tokai, Japan MicroIOC: A Simple Robust Platform for Integrating Devices Mark Pleško
Status of BEPCII Timing System Presented by Ge Lei IMAC 2006.
Remote Operation of Light Source Beamlines with (Free)NX Zhijian Yin, Peter Siddons, NSLS, BNL Controls at NSLS Facility Beamlines What Is NX, FreeNX Cybersecurity.
Materials Science and Protein Crystallography Using the MX Beamline Control Toolkit William M. Lavender
Dirk Zimoch, EPICS Collaboration Meeting October 2008 PSI Large Research Facilities Status SLS, Proton Facility, PROSCAN, PSI-XFEL.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
CLS Control System Progress Report Elder Matias Canadian Light Source University of Saskatchewan Saskatoon Saskatchewan.
Instrumentation at CLS (Presentation to Saskatchewan Instrumentation Society Executive) Elder Matias Canadian Light Source University of Saskatchewan
EPICS-based motion control and data acquisition system on hard x-ray microfocus beamline station Yan Fen Hard X-ray Microfocus beamline, Shanghai Synchrotron.
Automated Testing Presentation to EPICS Collaboration Meeting DESY Paul Gibbons PhD Diamond Light Source Ltd.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-to-NSLS-II beamline transition plan Outline Reasons, Scope, Criteria, Further input, Timeline Transition plan, Beamline.
Developing the control system for the 40m OAN radiotelescope with ACS Observatorio Astronómico Nacional P. de VicenteOctober 2005.
Control Hardware Design Control Hardware Wiring IOC Software (Low Level) OPI Software (High Level) Final Test Front-End (Connection to SR1 Ring) Done Insertion.
EPICS at APS Beamlines Tim Mooney Advanced Photon Source Argonne National Laboratory.
Petra III Status Teresa Núñez Hasylab-DESY Tango Meeting DESY,
Australian Synchrotron Mature GUI’s for protein crystallography beamlines Julian Adams.
BROOKHAVEN SCIENCE ASSOCIATES U.S. Department of Energy Office of Basic Energy Sciences Funded under contract: DE-AC02-98CH10886 EPICS/RTEMS at NSLS S.
Plans for the DAC Program at X-17 Short term (existing $90K) Purchase symmetric DACs and diamonds Install Laue-Laue mono in 17B3 (NSLS provides) Improve.
Computing at SSRL: Experimental User Support Timothy M. McPhillips Stanford Synchrotron Radiation Laboratory.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
Diagnostics and Optimization Procedures for Beamline Control at BESSY A. Balzer, P. Bischoff, R. Follath, D. Herrendörfer, G. Reichardt, P. Stange.
EPICS Noboru Yaamamoto July 11, 2006 for EPICS seminar at VECC,Kolkata Installing EPICS.
E. Matias Canadian Light Source CLS Beamline Controls.
Elke Zimoch, EPICS Workshop 2004 Japan EPICS at the Protein Crystallography Beamlines of the SLS.
Control System Overview J. Frederick Bartlett Fermilab June 1,1999.
The BaBar Online Detector Control System Upgrade Matthias Wittgen, SLAC.
Motion Control at the Advanced Photon Source Argonne National Laboratory Mark Rivers University of Chicago 7 GeV synchrotron x-ray light source, the largest.
ORNL is managed by UT-Battelle for the US Department of Energy EPICS on SNS Instruments Matt Pearson SNS ORNL 18 th - 22 nd May 2015.
Office of Science U.S. Department of Energy “Traditional” Tools for Beamline Applications Mark Rivers University of Chicago October 16, 2008.
Seungyu Rah (Pohang Accelerator Laboratory, POSTECH, Korea) Nov
Using COTS Hardware with EPICS Through LabVIEW – A Status Report EPICS Collaboration Meeting Fall 2011.
EPIC S Noboru Yaamamoto July 11, 2006 for EPICS seminar at VECC,Kolkata Installing EPICS.
Motion Controllers in SLS and SwissFEL
HADES collaboration meeting XXIII GSI, Darmstadt
SNS Status Report Karen S. White 10/15/08.
Mark Rivers University of Chicago
LabVIEW EPICS Client I/O Server
Control and Data Acquisition System for ESRF Beamlines
Linux-MVME Targets Using Motorola Board Support
synApps status and plans
Getting Started with EPICS A lecture Series
The EPICS running envirionments in the five accelerator projects
synApps status and plans
EPICS: Experimental Physics and Industrial Control System
EPICS at Diamond Mark Heron Head of Controls Group
GeoSoilEnviroCARS The University of Chicago
Presentation transcript:

Beamline Controls with EPICS at NSLS Zhijian Yin NSLS, BNL EPICS Collaboration Meeting, SSRF, March 2008

The Facility  2 nd Generation LS, ~2300 user/year, X-Ray and UV rings, Sources: IR-UV-X-Ray  Total ~65 active beamlines  PRT beamlines  Facility beamlines  Currently, ~20 facility beamlines

Beamlines Controls: What do we do  Dictated by science and experimental techniques  Motion Controls Beamline Optics: mirrors, monochromator, slits End Stations: Sample/detector manipulation  DAQ: “high level” applications scans, data collection, detectors  Other users devices (e.g., temperature control)

NSLS Beamline Controls: Pre EPICS  Legacy systems: mostly CAMAC based  Non-Uniform: PRTs are typically responsible for their own control systems  NSLS has provided “ACE” program free to beamlines  SPEC software (commercial) was quite popular  Labview programs in Windows; DOS programs  Limited manpower/budget Standardize software (SPEC)

Beamline Controls: EPICS  What drove us to EPICS was a looming hardware crisis in the late 90s CAMAC E500 motor controllers, as extensively used at NSLS beamlines, discontinued. No replacement.  Follow APS beamline controls VME based, OMS motor boards  Implemented a beamline control upgrade program for Facility Beamlines, at ~2-3 beamlines/year (~Y2K)  SPEC added EPICS support (EPICS client)  Currently ~20 beamlines in EPICS  PXRR beamlines controls in EPICS

Beamline Controls: EPICS (Cont)  SynApps: Motion Control, Scalers, sscan, etc  Serial motors (asyn)  MCA devices (asyn)  Detector control (CCD module)  DXP multielement detectors  NSLS detectors (Siddons) - Embedded EPICS IOC  Most EPICS beamlines have SPEC/EPICS/RTEMS  PX beamlines: Python based DAQ program  TO DO: Labview camp (NI EPICS client)

Beamline Controls: EPICS on RTEMS (K. Feng-Berman, P. Siddons)  VxWorks expensive  RTEMS as good, even for real time  EPICS 3.14, made RTEMS support possible  Almost all beamline controls in EPICS now runs in RTEMS (mvme230x, mvme5500)

Beamline Controls: EPICS for Qexafs (I.So, Siddons)  Normal EXAFS slow Scan mono angle, (E) A few minutes per spectrum  Qexafs Continuous scan Read detector data and encoder Spectrum in seconds Measurements of structure change  Need Real time performance  EPICS on real time Linux (RTAI)

“Organization”: Request-Tracker  Database/ /web  Tracking user request  Project documentation  Help Desk support  Project Management

Remote Diagnostics and Operations  NX or freenx server +SSH tunneling  Clients: free download (nomachine.com)  Good for beamline staff diagnostics and even user remote ops  General purpose, not tied to EPICS

Conculding Remarks  We benefited from EPICS, SynApps tremendously  Open Source technologies really work well  Beamline controls works best with collaborations with beamline scientists and engineers  Controls upgrade could make possible new techniques  Important but challenging: training of beamline scientists and engineers to embrace EPICS  Many beamlines are ready for NSLS-II in terms of beamline controls