Intro : Project Management. 1.Project : series of related jobs usually directed toward some major output and requiring a significant period of time to.

Slides:



Advertisements
Similar presentations
1 EO EMBA-2, BUP M. ASAD Operations Management for Competitive Advantages.
Advertisements

OPSM 301 Operations Management Class 8: Project Management: Introduction and CPM Koç University Zeynep Aksin
Project Management CHAPTER SIXTEEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
CHAPTER 17 Project Management.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
Project Management Project  A series of related jobs usually directed toward some major output and requiring a significant time to perform Project management.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
1 Project Planning BA Project Planning and Control Definition of Project Management Work Breakdown Structure Critical Path Scheduling Ideal Completion.
PROJECT MANAGEMENT. Outline What is a “project”? Project Management Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time.
Chapter 3 Project Management. Chapter 3 Project Management.
1 Chapter 3 part 1 Project Management. 2 Why is Project Management Important?  Why do I need to know this stuff? –Relevant across functional areas 
Project Management Operations -- Prof. Juran. 2 Outline Definition of Project Management –Work Breakdown Structure –Project Control Charts –Structuring.
18-1Project Management Chapter 18 Project Management.
Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Project Management Operations.
Chapter 16 – Project Management
Managing Projects.
Project Management. Maintenance and Reliability 14 Aug 2001.
Project Management.
J0444 OPERATION MANAGEMENT Project Management Pert 5 Universitas Bina Nusantara.
Chapter 16 – Project Management
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
4–14–1. 4–24–2 Chapter Four Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
© The McGraw-Hill Companies, Inc., Chapter 3 Project Management.
Irwin/McGraw-Hill Project Management  Project series of related jobs usually directed toward some major output and requiring a significant period of time.
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
Operations Management Project Management
Chapter 3 Project Management.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Projects CHAPTER 10. Learning Objectives 1. Explain what project management is and why it is important. 2. Identify the different ways projects can be.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Project Management Project 01 – OFF CLASS. 3 Project Management Project – series of related jobs usually directed toward some major output and requiring.
1-1 1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved.
Operations Management For Competitive Advantage 1 Project Management Operations Management For Competitive Advantage Chapter 3.
PROJECT MANAGEMENT Chapter Four Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
1 Project Management Chapter Lecture outline Project planning Project scheduling Project control CPM/PERT Project crashing and time-cost trade-off.
1 Slides used in class may be different from slides in student pack Chapter 3 Project Management  Definition of Project Management  Structuring Projects.
1 Chapter 3 Project Management  Definition of Project Management  Work Breakdown Structure  Project Control Charts  Structuring Projects  Critical.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 17 Project Management.
Project Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Chapter 10. Activity-on-Node Network Fundamentals X Y Z Y and Z are preceded by X Y and Z can begin at the same time, if you wish (B) ABC A is preceded.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
MBA 8452 Systems and Operations Management
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
© The McGraw-Hill Companies, Inc., Project Management CPM and PERT.
Tata McGraw CHAPTER 3 Project Management. Chapter 3 Project Management.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
1 8.0 Definition of Project Management Project  Series of related jobs or tasks focused on the completion of an overall objective. Project Management.
Operations Fall 2015 Bruce Duggan Providence University College.
Chapter 3 Project Management.
© The McGraw-Hill Companies, Inc., Chapter 3 Project Management.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 10 Projects.
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
Project Management – Part 1. Overview What is a project? Project management techniques Activity lists Network diagrams Critical path analysis Gant charts.
1 Slides used in class may be different from slides in student pack Chapter 3 Project Management  Definition of Project Management  Work Breakdown Structure.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
2010© Wiley Chapter 16 – Project Management Operations Management by R. Dan Reid & Nada R. Sanders 4 th Edition © Wiley PowerPoint Presentation by R.B.
Project Management.
Chapter 3 Project Management. Chapter 3 Project Management.
Project Management Operations -- Prof. Juran.
Project Management: PERT/CPM
Chapter 4: Project Management
Project Planning & Scheduling
Project Planning & Scheduling
Critical Path Method (CPM). Background & History Developed in the 1950s by the US Navy & Du Pont. Originally, the critical path method considered only.
Chapter 3 Project Management.
Project Management Operations -- Prof. Juran.
Presentation transcript:

Intro : Project Management

1.Project : series of related jobs usually directed toward some major output and requiring a significant period of time to perform 2.PM : management activities of planning, directing, and controlling resources (people, equipment, material) to meet the technical, cost, and time constraints of a project Project Management

Gantt Chart Activity 1 Activity 2 Activity 3 Activity 4 Activity 5 Activity 6 Time

Pure Project Advantages Pure Project A pure project is where a self-contained team works full- time on the project 1. The project manager has full authority over the project 2. Team members report to one boss 3. Shortened communication lines 4. Team pride, motivation, and commitment are high

Pure Project Disadvantages 1. Duplication of resources 2. Organizational goals and policies are ignored 3. Lack of technology transfer 4. Team members have no functional area "home"

Functional Project President Research and Development EngineeringManufacturing Project A Project B Project C Project D Project E Project F Project G Project H Project I Example, Project “B” is in the functional area of Research and Development.

Functional Project: Advantages 1. A team member can work on several projects 2. Technical expertise is maintained within the functio- nal area 3. The functional area is a “home” after the project is completed 4. Critical mass of specialized knowledge

Functional Project: Disadvantages 1. Aspects of the project that are not directly related to the functional area get short-changed 2. Motivation of team often weak 3. Responded to slowly

Matrix Project Organization Structure President R & DEngineering Manufacturing Marketing Manager Project A Manager Project B Manager Project C

Projects Matrix: Advantages 1. Enhanced communications between functional areas 2. Pinpointed responsibility 3. Duplication of resources is minimized 4. Functional “home” for team members 5. Policies of the parent organization are followed

Projects Matrix: Disadvantages 1. Too many bosses 2. Depends on project manager’s negotiating skills 3. Potential for sub-optimization

Work Breakdown Structure Program Project 1Project 2 Task 1.1 Subtask Work Package Level Task 1.2 Subtask Work Package

Network-Planning Models 1. A project is made up of a sequence of activities that form a network representing a project 2. The path taking longest time through this network of activities is called the “critical path” 3. The critical path provides a wide range of scheduling information useful in managing a project 4. Critical Path Method (CPM) helps to identify the critical path(s) in the project networks

Prerequisites for Critical Path Methodology A project must have: 1. well-defined jobs or tasks whose completion marks the end of the project; 2. independent jobs or tasks; 3. and tasks that follow a given sequence.

Types of Critical Path Methods 1. CPM with a Single Time Estimate a. Used when activity times are known with certainty b. Used to determine timing estimates for the project, each activity in the project, and slack time for activities 2. CPM with Three Activity Time Estimates a. Used when activity times are uncertain b. Used to obtain the same information as the Single Time Estimate model and probability information 3. Time-Cost Models a. Used when cost trade-off information is a major consideration in planning b. Used to determine the least cost in reducing total project time

Steps in the CPM with Single Time Estimate 1. Activity Identification 2. Activity Sequencing and Network Construction 3. Determine the critical path From the critical path all of the project and activity timing information can be obtained

CPM with Single Time Estimate Consider the following consulting project: ActivityDesignationImmed. Pred.Time (Weeks) Assess customer's needsANone2 Write and submit proposalBA1 Obtain approvalCB1 Develop service vision and goalsDC2 Train employeesEC5 Quality improvement pilot groupsFD, E 5 Write assessment reportGF1 Develop a critical path diagram and determine the duration of the critical path and slack times for all activities.

First draw the network A(2)B(1) C(1) D(2) E(5) F(5) G(1) ANone2 BA1BA1 CB1CB1 DC2DC2 EC5EC5 FD,E5 GF1GF1 Act.Imed. Pred. Time

Early starts and early finish times ES=9 EF=14 ES=14 EF=15 ES=0 EF=2 ES=2 EF=3 ES=3 EF=4 ES=4 EF=9 ES=4 EF=6 A(2)B(1)C(1) D(2) E(5) F(5) G(1)

Determine late starts and late finish times ES=9 EF=14 ES=14 EF=15 ES=0 EF=2 ES=2 EF=3 ES=3 EF=4 ES=4 EF=9 ES=4 EF=6 A(2)B(1) C(1) D(2) E(5) F(5) G(1) LS=14 LF=15 LS=9 LF=14 LS=4 LF=9 LS=7 LF=9 LS=3 LF=4 LS=2 LF=3 LS=0 LF=2 Hint: Start with LF=15 or the total time of the project and go backward in the network from G to A.

Critical Path & Slack ES=9 EF=14 ES=14 EF=15 ES=0 EF=2 ES=2 EF=3 ES=3 EF=4 ES=4 EF=9 ES=4 EF=6 A(2)B(1) C(1) D(2) E(5) F(5) G(1) LS=14 LF=15 LS=9 LF=14 LS=4 LF=9 LS=7 LF=9 LS=3 LF=4 LS=2 LF=3 LS=0 LF=2 Duration=15 weeks Slack=(7-4)=(9-6)= 3 Wks

Example A(7) B (5.333) C(14) D(5) E(11) F(7) H(4) G(11) I(18) Duration = 54 Days

Question Answer: a. SOW (or Statement of Work) A project starts with a written description of the objectives to be achieved, with a brief statement of the work to be done and a proposed schedule all contained in which of the following? a. SOW b. WBS c. Early Start Schedule d. Late Start Schedule e. None of the above

Question Some activities in a project there may be some leeway from when an activity can start and when it must finish. What is this period of time called when using the Critical Path Method? a. Early start time b. Late start time c. Slack time d. All of the above e. None of the above Answer: c. Slack time

Question How much “slack time” is permitted in the “critical path” activity times? a. Only one unit of time / activity b. No slack time is permitted c. As much as the maximum activity time in the network d. As much as is necessary to add up to the total time of the project e. None of the above Answer: b. No slack time is permitted (All critical path activities must have zero slack time, otherwise they would not be critical to the project completion time.)

Question When looking at the Time-Cost Trade Offs in the Minimum-Cost Scheduling time-cost model, we seek to reduce the total time of a project by doing what to the least-cost activity choices? a. Crashing them b. Adding slack time c. Subtracting slack time d. Adding project time e. None of the above Answer: a. Crashing them (We “crash” the least-cost activity times to seek a reduced total time for the entire project and we do it step-wise as inexpensively as possible.)