DORII review Remote instrumentation communities and application support NA3 Roberto Pugliese Sincrotrone Trieste SCpA.

Slides:



Advertisements
Similar presentations
NA3 DORII: Deployment of Remote Instrumentation Infrastructure David Gutiérrez – Emilio Díaz University of Cantabria NA3 – Application.
Advertisements

CGW 08, Kraków, October 13-15th,  Integration of instrumentation and selected applications with e-Infrastructure and maintenance on production.
1 Project overview Presented at the Euforia KoM January, 2008 Marcin Płóciennik, PSNC, Poland.
EGEE 08, Istanbul, September 25th, Support for experimental science communities Istanbul, September 25th, 2008 Norbert Meyer, Marcin Płóciennik.
DORII: Training for Pilot Application Evaluation Paolo Gamba Matteo Lanati.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
OGS OCOM-MOON application status and demo DORII AHM Stefano Salon and Giorgio Bolzon OGS June 29 th 2010, EUCENTRE, Pavia.
Sixth Hour Lecture 10:30 – 11:20 am, September 9 Framework for a Software Management Process – Artifacts of the Process (Part II, Chapter 6 of Royce’ book)
1 Software & Grid Middleware for Tier 2 Centers Rob Gardner Indiana University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven National.
Cracow Grid Workshop, November 5-6, 2001 Towards the CrossGrid Architecture Marian Bubak, Marek Garbacz, Maciej Malawski, and Katarzyna Zając.
EURIDICE project Evaluation of image database use in online learning environment 11/
The CrossGrid project Juha Alatalo Timo Koivusalo.
Virtual Workbenches Richard Anthony The University of Greenwich
Design and Evaluation of Iterative Systems n For most interactive systems, the ‘design it right first’ approach is not useful. n The 3 basic steps in the.
IT Learning Programme The Evaluations Tool Pilot Project 19 th July 2010.
Process, Communication, and Certification Padma Venkata
LHC Experiment Dashboard Main areas covered by the Experiment Dashboard: Data processing monitoring (job monitoring) Data transfer monitoring Site/service.
All Hands Meeting DORII Deployment of Remote Instrumentation Infrastructure Norbert Meyer PSNC October 20, 2009, Garching.
DORII Deployment of Remote Instrumentation Infrastructure Norbert Meyer Poznań Supercomputing and Netwoking Center DORII Workshop,
The Glider Instrument Manager Features and Demo DORII AHM Giorgio Bolzon OGS October 22 th 2009, LRZ, Munich.
08/11/908 WP2 e-NMR Grid deployment and operations Technical Review in Brussels, 8 th of December 2008 Marco Verlato.
Using the WDK for Windows Logo and Signature Testing Craig Rowland Program Manager Windows Driver Kits Microsoft Corporation.
DORII Joint Research Activities DORII Joint Research Activities Status and Progress 4 th All-Hands-Meeting (AHM) Alexey Cheptsov on.
1 e-Infrastructures and Virtualisation, Remote Instrumentation “The views expressed in this presentation are those of the author and do not necessarily.
Investigating System Requirements
EMI SA2: Quality Assurance (EMI-SA2 Work Package) Alberto Aimar (CERN) WP Leader.
DORII review Deployment and management of production infrastructure SA2 Ioannis Liabotis Greek Research and Technology Network - GRNET.
Long Term Ecological Research Network Information System LTER Grid Pilot Study LTER Information Manager’s Meeting Montreal, Canada 4-7 August 2005 Mark.
NA3 DORII: Deployment of Remote Instrumentation Infrastructure Matteo Lanati EUCENTRE (European Centre for Training and Research in.
Workshop on Scientific Instruments and Sensors on the Grid Introduction and motivations Director: Roberto Pugliese (ELETTRA) Co-Director: Claudio Vuerli.
EMI INFSO-RI SA2 - Quality Assurance Alberto Aimar (CERN) SA2 Leader EMI First EC Review 22 June 2011, Brussels.
OGS OCOM-MOON application status and activity plan DORII AHM Giorgio Bolzon and the OCOM-MOONers OGS March 11 th 2010, HLRS, Stuttgart.
JRA1/Job Submission and Monitoring Moreno Marzolla on behalf of JRA1/Job Submission Task INFN Sezione di Padova,
T Project Review TeXlipse [I2] Iteration
DORII Joint Research Activities DORII Joint Research Activities Status and Progress 6 th All-Hands-Meeting (AHM) Alexey Cheptsov on.
Chapter 7: A Summary of Tools Focus: This chapter outlines all the customer-driven project management tools and techniques and provides recommendations.
OOI CI LCA REVIEW August 2010 Ocean Observatories Initiative OOI Cyberinfrastructure Architecture Overview Michael Meisinger Life Cycle Architecture Review.
A portal interface to my Grid workflow technology Stefan Rennick Egglestone University of Nottingham
SmartNets Results Overview SmartNets SmartNets Methods.
9 Systems Analysis and Design in a Changing World, Fourth Edition.
NA-MIC National Alliance for Medical Image Computing UCSD: Engineering Core 2 Portal and Grid Infrastructure.
BalticGrid-II Project BalticGrid-II Kick-off Meeting, , Vilnius1 Joint Research Activity Enhanced Application Services on Sustainable e-Infrastructure.
EGEE conference, Instanbul, Sept. 25th, Scientific e-Infrastructure : DORII approach Instanbul, September 24th, 2008 Norbert Meyer, Poznań Supercomputing.
T Iteration demo T Iteration Demo Team Balboa I1 - Iteration
BalticGrid-II Project The Second BalticGrid-II All-Hands Meeting, Riga, May, Joint Research Activity Enhanced Application Services on Sustainable.
Mantychore FP7 WP4 (SA1) - Software Refinement. Objectives Main duties – Analysis of User Requirements – Implementation – Support and bug fixing This.
ESFRI & e-Infrastructure Collaborations, EGEE’09 Krzysztof Wrona September 21 st, 2009 European XFEL.
Architecture View Models A model is a complete, simplified description of a system from a particular perspective or viewpoint. There is no single view.
26/05/2005 Research Infrastructures - 'eInfrastructure: Grid initiatives‘ FP INFRASTRUCTURES-71 DIMMI Project a DI gital M ulti M edia I nfrastructure.
TCS-ICS interactions Kuvvet Atakan 1 and the WP6 and WP7 Teams 1 University of Bergen / Department of Earth Science.
Overview of RUP Lunch and Learn. Overview of RUP © 2008 Cardinal Solutions Group 2 Welcome  Introductions  What is your experience with RUP  What is.
Rational Unified Process Fundamentals Module 4: Core Workflows II - Concepts Rational Unified Process Fundamentals Module 4: Core Workflows II - Concepts.
Internet2 Applications Group: Renater Group Presentation T. Charles Yun Internet2 Program Manager, Applications Group 30 October 2001.
EC Review – 01/03/2002 – WP9 – Earth Observation Applications – n° 1 WP9 Earth Observation Applications 1st Annual Review Report to the EU ESA, KNMI, IPSL,
State of Georgia Release Management Training
ESSRT In-Process Review September 10, Agenda 1.Work Completed Till Date 2.Scope of future activities and deliverables 2.
Università di Perugia Enabling Grids for E-sciencE Status of and requirements for Computational Chemistry NA4 – SA1 Meeting – 6 th April.
INFSO-RI Enabling Grids for E-sciencE Quality Assurance Gabriel Zaquine - JRA2 Activity Manager - CS SI EGEE Final EU Review
INFSO-RI SA2 ETICS2 first Review Valerio Venturi INFN Bruxelles, 3 April 2009 Infrastructure Support.
INFSO-RI JRA2 Test Management Tools Eva Takacs (4D SOFT) ETICS 2 Final Review Brussels - 11 May 2010.
INDIGO – DataCloud WP5 introduction INFN-Bari CYFRONET RIA
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Application Porting Support Gergely Sipos,
Configuration Control (Aliases: change control, change management )
The EPIKH Project (Exchange Programme to advance e-Infrastructure Know-How) gLite Grid Introduction Salma Saber Electronic.
© 2006 Open Grid Forum Remote Instrumentation (not only) for fun LEGO Mindstorm Exploration Demo Authors: Andrea Del Linz, Roberto Pugliese (Sincrotrone.
Specification of the User Interface Server/Client
EO Applications Parallel Session
Remote Operations and Online Processing
Software engineering -1
Technology Maintenance
Presentation transcript:

DORII review Remote instrumentation communities and application support NA3 Roberto Pugliese Sincrotrone Trieste SCpA July 3, 2009, Brussels

 Workpackage introduction  Workpackage objectives  Workpackage deliverables  Workpackage overall schedule  Workpackage achievements  Workpackage future plans  Workpackage Summary Outline

 Remote instrumentation communities and application support  Give support for researchers for adaptation and integration of their applications in the extended e- Infrastructure NA3 Objectives

Connection with other WPs

Tasks and subtasks

Deliverables

Schedule

NA3.1NA3.2NA3.3NA3.4NA PMS110 PMs26 PMs12 PMs16 PMs Effort distribution

 Earthquake community  Network-centric seismic simulations  Environment community  Oceanographic and coastal observation and modelling Mediterranean Ocean Observing Network  Oceanographic and coastal observation and modelling using imaging  Experimental science community  On-line data analysis in experimental science Communities and pilot apps

 Earthquake community  Earthquake early warning system design and simulation  Environment community  Monitoring inland waters and reservoirs  Experimental science community  On-line data analysis in experimental science (other use cases) Communities and not pilots

 Described to the communities the existing e- Infrastructure  Requirement analysis for pilot and not pilot applications and evaluation metrics definition  Match the applications in the Instrument Infrastructure Architecture (VCR, CE, SE, IE, … )  For each application (focus on pilots)  defined a todo list (wbs, … )  defined a plan  constantly monitor application status and progress Achievements

Architecture

 DORII applications description  Requirements  General, instrumentation,  Data, storage, computing,  Visualisation, interactivity,  Networking, collective  Metrics definition  production, usability  Perceived gain (performance, reach, … )  Requirements template  Specific requirements Requirements

 Status of the VCR  Status of the VCR personalisation  Status of the IE  Status of IE personalisation (IM implementation)  Status of CE (porting of the application code)  Status of the SE (connection with the IE)  Status of the collective behaviour (workflow and connection of components) Application status

 We meet regularly every week via EVO  Meetings are focused on application short term and long term needs  Meetings try to give answers to specific application problems  Meetings have an agenda  Meetings have minutes with specific action items  We have installed an online survey tool to collect feedback and perform evaluations Teamwork achievements

Online survey

 Involves instruments computing, storage not yet collectively used, it is using he application manager and mpi  Next developments glider integration, separated VCR for personalisation and better performance, visualisation of NetCDF files OGS Pilot Application

 Involves instruments, computing, storage, not yet collectively used, application manager, example of system level science similar to the NEESGrid  Next developments other instruments integration, separated VCR for personalisation and better performance EUCENTRE Pilot Application

 Involves instruments, computing, storage not yet collectively used, it is using the application manager  Next developments more imaging algorithms, separated VCR for personalisation and better performance UC Pilot Application

(interactive sci.app: fit2D) (BL instrument) (VCR) (user in ELETTRA) Online/GRID: CE,SE,etc ELETTRA SAXS Application

 Earthquake early warning system design and simulation  Instrument integration in progress  Monitoring inland waters and reservoirs  Instrument integration in progress and modelling almost done  Experimental science community  Syrmep application under development; impressive tomography reconstruction  XRD yet to start, requirement for taverna integration Status of not pilot apps

 It has been developed to demonstrate and DORII (ICT2008, INGRID2009) and for training purposes actually involves only instruments, if we include the remote camera than we can demonstrate also instrument, storage integration  Next developments computing integration and permanent setup Robot Demo Application

 Experimental procedure  Focus on end users  Access to the DORII infrastructure via VCR  For each pilot application we have defined  list of key users (not involved in DORII)  a set of scenarios  a task list for each scenario  Each key user will first receive a basic training on DORII and the use of the VCR  After the training each key user will execute the scenario  After executing the scenario each user will fill an online questionnaire Early deployment evaluation

 Laboratory studies  Subjective assessment  General assessment  Specific feature assessment  Specific task assessment  Regults  Overall rating good  Security perceived too complex  VCR perceived as slow  Improvement required for reliability, application manager, visualisation capabilities, automatisation, metadata support, help and training  Evaluation process ok Evaluation results

 Need for a new VCR  Need for a better application manager  Need for a Common Library  Need for a workflow management system  Need to have a customized VCR at least for each community  Need to simplify security (robot certificates)  Need for better training material  Need for a summer school Feedback to JRA and SAs

 When the first release of the middleware will be available we will adapt pilot applications and port the other applications to production and operational use  We will provide further feedback and finalize the e-Infrastructure Future plans

 Papers, presentations and demonstrations have been included in the dissemination workpackage  VCR for all SRF users (SaaS)  MADBAG meteo and air quality data acquisition, nowcasting and forecasting using modelling, geographical visualisation of results  … Other archievements

 NA3 workpackage is about supporting instrumentation communities and helping them porting their applications to the e-Infrastructure  The involved effort is huge and has to deal not only with technical aspects  You have to build trust which is not easy  During this first half of the project we manage to establish a common language, establish a way to work together, collect requirements, deploy pilots, setup an evaluation procedure, provide feedback to the JRA and Sas, complete deliverables  Moreover we prepared good quality demo and involve new communities  We will now focus on pilot application improvements, not pilot application deployment, evaluation and feedback to JRA and SAs to obtain a production quality middleware and infrastructure. Summary

 All the pilot applications are available for demonstration on request  We will demonstrate the DORII e-Infrastructure staus with the SAXS application which is complete, shows integration of instrument, storage, computing resources,applications which can be interactive, online (new to the Grid world) and offline (traditional Grid use), and moreover is in production status and presents a collective use of the resources via application manager and workflow management system Introducing the demo