Network Interop March 8 th 2011 Herbst. Ft Lauderdale Review of Herbst/Sturek document submitted to IETF –

Slides:



Advertisements
Similar presentations
NAESB Smart Grid Task Force PAP 03 Update Robert B. Burke – NAESB Task Force Co-Chair Jim Northey.
Advertisements

HUAWEI TECHNOLOGIES CO., LTD. Page 1 Femtocell Synchronization Analysis HUAWEI TECHNOLOGIES CO., LTD. Rock Xie.
World Class Standards 1 SCP(11)0001 SCP Plenary #47 January 12-14, 2011 Title*: Update on TC M2M activities (and Smart Metering Mandate) Submitted by:
UCAIug HAN SRS v2.0 Summary August 12, Scope of HAN SRS in the NIST conceptual model.
May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 03/07/11.
Smart Energy Profile Distributed Energy Resources Tom Herbst.
Use Cases Utilizing an EMS
TANDBERG Video Communication Server March TANDBERG Video Communication Server Background  SIP is the future protocol of video communication and.
OpenHAN Boot Camp July 19, OpenHAN TF Overview Chair Erich W. Gunther, EnerNex – Co-chair Mary Zientara, Reliant Energy -
Draft February 2010 OpenHAN TFSlide 1 Submission Title: OpenSG San Francisco Opening Report Date Submitted: February xx, 2010 Source: OpenHAN Task.
Xanthus Consulting International Smart Grid Cyber Security: Support from Power System SCADA and EMS Frances Cleveland
Slide 1 UCAIug OpenSG OpenADE Automated Data Exchange Requirements NAESB ESPI Energy Services Provider Interface Standard Specification Overview.
Business Technology Solutions B usiness T echnology S olutions Smart Grid Program Consumers Energy’s focus on Using and Enhancing Industry Standards.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Gale Lightfoot, Senior Staff Program Manager, Office of the CTO, SPB Cisco ATIS and the Smart Grid.
Advanced Metering Infrastructure
UtilityAMI HAN Task Force May 10, Agenda SCE Contribution on HAN Vision Technology Discussion Identify TF Deliverables.
1 Connectivity Week 2010 How Can Standards Be Regulated? Thursday May 27 10:30AM-Noon Zahra Makoui.
Network Interop OpenSG 11/2/10 Tom Herbst. Agenda Opening Intro to Interop IETF Draft for Smart Energy Ongoing Work.
Smart Grid Interoperability Standards George W. Arnold, Eng.Sc.D. National Coordinator for Smart Grid Interoperability National Institute of Standards.
1 SmartMeter™ Delivering Customer Benefits Jana Corey Director, Policy Planning Integrated Demand-side Management Pacific Gas and Electric Company.
B usiness T echnology S olutions AMI – Advanced Metering Infrastructure Consumers Energy Mark Ortiz March 9, 2011.
PAP 10 UCAIug OpenSG Customer Domain Involvement.
Experience you can trust. Knowledge2006 – Technology Roundtable Dan Ruiz
1 OpenADR Taskforce Chair – Albert Chiu Co-chair – Ed Koch Technical Editors – Bruce Bartell, Gerald Gray.
Lead Management Tool Partner User Guide March 15, 2013
In-Premise Devices and Grid Interoperability Michel Kohanim Universal Devices, Inc.
CONFIDENTIAL 1. 2 Designing the Intelligent Energy Gateway 2009 CONFIDENTIAL.
Meter, Facility Interfaces
Maureen Trumble Jack Hobbick AMI – Providing the Smart Grid Foundation.
CS3900 Richard Emerson1 Radio Frequency ID Tags Smart labels that send/receive data via radio waves Usually works like a barcode – contains a product code.
# 1 AMI Environmentalism Wayne Longcore, Director of Enterprise Architecture and Standards, Consumers Energy.
1 Stable Connectivity IETF 91 11/2014 Honolulu draft-eckert-anima-stable-connectivity-00 T.Eckert M. Behringer.
XCON WG IETF-73 Meeting Instant Messaging Sessions with a Centralized Conferencing (XCON) System draft-boulton-xcon-session-chat-02 Authors: Chris Boulton.
IntelliSense.io Beyond the hype - Real World Applications / Solutions of Internet of Things.
EAI WG meeting IETF-65, March 20, Agenda 17:40 Welcome, blue sheet, scribe, agenda bashing 17:50 Review of WG charter (approved) 17:55 Problem/framing:
1 Presentation_ID © 1999, Cisco Systems, Inc. Cisco All-IP Mobile Wireless Network Reference Model Presentation_ID.
CS 3610: Software Engineering – Fall 2009 Dr. Hisham Haddad – CSIS Dept. Class Project OO Design Document Here is what you need to do for your class project.
UtilityAMI HAN Task Force July 2, Agenda Introductions / Background Overview of HAN Framework - 20 minutes California IOU Presentation/Discussion.
1 SGIP PAP 11 PEV V2G DEWG Dec 2-3, 2010 Grid InterOp 2010 Eric Simmon, NIST Jerry Melcher, EnerNex SGIP PAP 11 PEV V2G DEWG Grid InterOp 2010 Meeting.
Dec UtilityAMI OpenHAN TF Requirements Working Group Specification Briefing January 2008.
Tier 2 Power Supply Planning Workshop Advanced AMI Benefits Overview.
Doc.: IEEE /0716r0 Submission July 2009 Kapil SoodSlide 1 Smart Grid and Date: Authors:
Knoxville, TN October 20, 2009 SG-Systems Systems Requirements Specification Team Status and Breakout Session.
IEC TC57 Smart Grid Activities Scott Neumann USNC TA IEC TC57 November 6, 2009.
OpenHAN TF Meeting Where do we go next? Erich W. Gunther.
Open AMI Network 10/22/08.
SG-Systems Working Group Status: Active, meet once at each face-to-face meeting Charter: The SG-Systems Working Group defines requirements, policies, and.
OpenHAN SRS v1.95 Overview June 8, OpenHAN SRS v Introduction  OpenHAN area of focus within the NIST conceptual model.
June California Investor Owned Utilities (IOU) HAN vision statement development 15 June 2007.
CJK 7 th Plenary: NGN-WG (IPv6 based NGN) IPv6 based NGN (NGNv6)
March 2011 Slide 1 Submission Title: OpenSG San Francisco OpenADE Boot Camp Source: OpenADE Task Force Abstract: SG Systems OpenADE Task Force Boot Camp.
1 3gpp_trans/ / IPv6 Transition Solutions for 3GPP Networks draft-wiljakka-3gpp-ipv6-transition-00.txt Juha Wiljakka,
OpenHAN Attachment And Service Model Thoughts David Ress May 5, 2010 V0.2.
ATIS Home Networking (HNET) Program DOCUMENT #:GSC13-GTSC6-13 FOR:Presentation SOURCE:Alliance for Telecommunications Industry Solutions AGENDA ITEM:GTSC6;
OpenADR Taskforce. OpenADR and NIST Smart Grid Roadmap Conceptual Model.
Managed NAT Gateways Introduction and Demo
May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 11/1/2010.
Thoughts on DER Aggregations ERCOT Staff DREAM TF Sept. 28, DER Aggregations.
Theme Guidance - Network Traffic Proposed NMLRG IETF 95, April 2016 Sheng Jiang (Speaker, Co-chair) Page 1/6.
Advanced Metering Infrastructure (AMI) Australia, Victoria State (DOI) Michael Wu Semitech Innovations Pty Ltd (Australia)
Lead from the front Texas Nodal 1 Texas Nodal EDS4 - Approach 11/28/2007.
Jeju, 13 – 16 May 2013Standards for Shared ICT Dr. Farrokh Khatibi Director of Engineering Qualcomm ATIS and the Smart Grid Document No: GSC17-PLEN-63.
Santa Clara 2008 Smart Meters and Home Automation Ember Corporation Bob Gohn VP Marketing
V4 traversal for IPv6 mobility protocols - Scenarios Mip6trans Design Team MIP6 and NEMO WGs, IETF 63.
February 2010 OpenHAN TFSlide 1 Submission Title: OpenSG San Francisco Opening Report Date Submitted: February xx, 2010 Source: OpenHAN Task Force Re:
Direct Participation Enrollment Process for 2017 DRAM
Smart Grid Interoperability Standards
IEC TC57 Smart Grid Activities
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Response to PAR and 5C Comments.
Reference Design for Residential Energy Gateway
Presentation transcript:

Network Interop March 8 th 2011 Herbst

Ft Lauderdale Review of Herbst/Sturek document submitted to IETF – Suggestions for moving forward – AMI Interfaces

Since Fort Lauderdale Started Weekly Calls 9am-10am PST Fridays

Work items identified IPv4/IPv6 transition – Interworking – Potentially DA focused Transition to NIST approved HAN technology AMI-HAN requirements

IPv4/IPv6 Dual stack routing – No Interworking, “Ships in the night” NAT 64 Higher level application gateway Perhaps Distribution Automation

Legacy HAN -> NIST HAN Transition SEP1.x -> SEP2.0 gateway NIST efforts

HAN impact on AMI Network Messaging Bandwidth/latency Security Documents – Started with OpenHAN SRS v2 – Next steps SAE Documents Zigbee

Example of OpenHAN items Page 13 AMI Definition Page 14 Control & Pricing Signals Page 16 Registration & Enrollment – perhaps commissioning Page 21 High level Security requirements Page27 – High level coms requirement Page 28 item 5 – AMI must be able to tag public vs private message Page 29 item 6 – ami provides backhaul for gas & water, etc DER, PEV Page 30 top paragraph, DER generation data for GridOps Page 30 midpage “innovative applications” Page 32 line 23 – high level ESI requirements Page 33 question on AMI inventory of the HAN device Page 35 high level security – HAN device threat vector Page 35 multiple connections to the home Unique events via multiple paths Might be from different service providers Different Service provider vs network provider identification Page 38 & page 39 – examples of enrolled devices getting load control messages Page 43 - high level control signals Page 43 – Processing Section – various price, control signal and other data needed to process Page 44 – more detail on commissioning, registration, enrollment Page 44 – dynamic ACL’s Page 45 line 45 Over the air upgrade Page 46 – more price and load control Page 46 – Billing information Page 47 – high level security requirements Page 48 – two way load shed (message/confirm) + Cancel events

Logistics of Moving Forward Non-workable approach – Reading/writing long documents in conference calls or meetings Calls should be group reviews – What is appropriate frequency of calls? Co-Chair Independent or small group (2-3 people) submissions