Power System Engineering Want to own your Customer’s Power System?

Slides:



Advertisements
Similar presentations
Subcontractor Electrical Safety & NFPA 70E
Advertisements

Murray State University
Fuses vs Circuit Breakers for Low Voltage Applications
Arc Flash & Data Centers
Arc Flash: Electrical Safety in the Workplace CCIA Safety Committee SAFETY ROUNDTABLE April 10, 2012 sm 1.
California HVAC Program Strategy IOU Program Overview CPUC HVAC Workshop June 24, 2009.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
How to Document A Business Management System
San Bernard Electric Cooperative, Inc. Arc Flash Assessment.
ARC FLASH ANALYSIS.
Mark W. Earley, P.E. Chief Electrical Engineer.  Also known as the NEC ® or ANSI/NFPA 70  There are two electrical codes that govern electrical installation.
Slide 1 UNCLASSIFIED Breaker Operation Arc Flash Breakout Group EFCOG Electrical Safety Workshop – July 18, 2014.
COORDINATING CREDIT AND FINANCING FOR FARMERS Steve Kluemper, Vice President - Credit.
ELECTRICAL SAFETY SUB GROUP COMPENSATORY ARC FLASH CONTROLS Greg Christensen July 16, 2014.
Viewpoint Consulting – Committed to your success.
Electrical Safety Training
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
System Analysis and Design
“Standard for Electrical Safety in the Workplace”
Building a Solid Safety Program Building a Solid Safety Program Lauro A. Garza Sr. Sr. Director, Enterprise Occupational Safety and Health August 15, 2013.
OHT 2.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Software Quality assurance (SQA) SWE 333 Dr Khalid Alnafjan
An Introduction to Mersen Electrical Services Putting electrical safety to work.
Building a Mutually Rewarding Partnership [Your Company Name]’s Commitment to Delivering Unequaled Value to [Client Name] (Replace with client logo)
One Place for all profitable web solutions Getontheweb.in Himansshu H Singh P E -
BIS310: Structured Analysis and Design Introduction and Systems Planning Week 1.
Incident Energy Study Christian Brothers University MAESC CONFERENCE Jermichael Beaver, Bruce Luong, David Temple, and John Ventura.
Workforce Training and Education Coordinating Board 9/11/2015 WEDA Spring/Summer Conference Tools for the Recovery Workforce Development.
Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
© Evaluating Electrical Risk Factors Module 3.
NECA & Salisbury Assessment Solutions Partnership.
GBA IT Project Management Final Project – “ FoodMart Corp - Making use of Business Intelligence” July 12, 2004 N.Khuda.
Sommerville Power Engineering Ltd. Introduction & Overview Company Number , registered in England & Wales. SPE August 2015.
© 2011 Underwriters Laboratories Inc. All rights reserved. This document may not be reproduced or distributed without authorization. ASSET Safety Management.
Copyright © 2011 Rockwell Automation, Inc. All rights reserved. CENTERLINE 2100 Motor Control Center - SecureConnect™ September 1, 2011.
WELCOME TO HA255 SEMINAR #6 ORGANIZATIONAL STRATEGY & STRATEGIC HUMAN RESOURCE MANAGEMENT KU Instructor: John E. Long, MS, CMM.
Advanced Controls and Sensors David G. Hansen. Advanced Controls and Sensors Planning Process.
Slide 1 ANSI Annual Conference 2002 Breaking Down Border: Business, Standards and Trade CA 101: Everything You Need to Know But Didn’t Know to Ask: The.
MNM Fatal Electrical Electrical October 12, 2006 (Minnesota) October 12, 2006 (Minnesota) Taconite Operation Taconite Operation Maintenance Coordinator.
5. Planning Phase System Analysis And Design Program: BSCS II (Advent Semester – 2014) Lecturer: Rebecca Asiimwe
First Draft Language (B) Service Equipment. In addition to the requirements in (A), service equipment shall contain the following information: (1)
Websense SLP (Software Licensing Program) Sherri Conover Websense Business Unit Manager March 17, 2010.
Introduction & Overview Company Number , registered in England & Wales. December 2015.
Software Quality Assurance. Software Quality Software quality is defined as the quality that ensures customer satisfaction by offering all the customer.
Slide 1 Software Construction Software Construction Lecture 3.
BUSINESS STRATEGY AND PLAN 2010 Emerging Energy Solutions 1.
Training of Airport Visual Aids Maintenance Personnel “Airport Operator” - Are you Meeting the Requirements? IESALC Denver 2015 Presented by Seward Ford.
S TANDARDS, CERTIFICATION AND ASSESSMENT C HAPTER 23 Dr. Ahmad F. Shubita.
EnergySTEP1 Data Center Assessment: After the Sale How to Present the Customer Report How to Follow up on Sales Opportunities.
Electrical Distribution Analysis & Testing Everything You Need To Know About Power Distribution By Current Solutions PC.
ELECTRICAL SAFETY TASK GROUP
What is Arc Flash? Electrical arc flash and arc blasts release dangerous levels of heat energy, fire , molten materials, vaporized solids that can be inhaled,
LCLS-II CRYOPLANT CONTROLS HARDWARE FINAL DESIGN REVIEW
SAMPLE Develop a Comprehensive Competency Framework
OSHA’s Final Rule: Electric Power Generation, Transmission, and Distribution Electrical Protective Equipment Presented to: RESAP Area Administrators Presented.
Karen Bartleson, President, IEEE Standards Association
Reduced Safety/Reliability: Arc Flash Hazard Example
Presented to: IEEE-IAS (Atlanta) Presented by: Michael D. Seal, P.E.
Murray State University
EUSERC Training May 2017 Connecting Single phase 3 wire invertor to 3phase 4 wire utility service. Lessons learned - Customer Owned Interconnected Generation.
MAZARS’ CONSULTING PRACTICE Helping your Business Venture Further
MAZARS’ CONSULTING PRACTICE Helping your Business Venture Further
MAZARS’ CONSULTING PRACTICE Helping your Business Venture Further
MAZARS’ CONSULTING PRACTICE Helping your Business Venture Further
MAZARS’ CONSULTING PRACTICE Helping your Business Venture Further
MAZARS’ CONSULTING PRACTICE Helping your Business Venture Further
Fuses vs Circuit Breakers for Low Voltage Applications
Presentation transcript:

Power System Engineering Want to own your Customer’s Power System?

Schneider Electric 2 - Engineering Services – January 2009 PSE Helps You Own the Power System – Then What? ●LEVERAGE ●EVERY $1 in PSE that you sell equates to $8 in Pull-Through Products/Services ●Customers come to you without BIDDING! ●75% of the PSE pull-through comes without hitting the street ●Your Solutions Provider reputation increases! ●PSE takes the system view, with customer economic benefit as primary driver

Schneider Electric 3 - Engineering Services – January 2009 What sets PSE above the competition? ●Credentials ●Engineers recognized as Industry Experts ●Local and National IEEE Leadership & Knowledge ●Registered Professional Engineers, Licensed Engineering Firm ●Experience and Expertise ●Square D has been doing studies since 1966 ●History since 1998: studies, 750+ assessments/turnkey projects ●Innovative analysis tools & methodologies, applied consistently across US ●Regional Locations ●Regional PSE Engineers deployed strategically across US – all time zones ●Knowledge of local markets, codes, and AHJs

Schneider Electric 4 - Engineering Services – January 2009  Power System Assessments  Short Circuit Studies  Overcurrent Coordination Studies  Arc Flash Studies  Load Flow, Circuit Capacity Studies  Grounding and Ground Fault Analysis  Power Quality Troubleshooting  Power Factor and Harmonics Analysis  Onsite Testing & Data Collection  Motor Starting Studies  Consulting, Analysis and Design Power System Engineering Offers Power System Studies & Analysis Power System Onsite Assessments & Troubleshooting Power System Improvement Projects

Schneider Electric 5 - Engineering Services – January 2009 Power System Engineers 40 Power System Engineering Team Credentials ●Registered Professional Engineers, Licensed Engineering Firm ●Performed thousands of power system studies ●Backgrounds include EE, ME; many advanced degrees ●Industry recognized professionals who have authored many technical articles ●Present and past leaders of various IEEE, IEC, ANSI, NEMA & UL committees and working groups

Schneider Electric 6 - Engineering Services – January 2009 “We Want to Comply with NFPA 70E” Arc Flash DeliverableCustomer Benefit  Single-Line Electrical Drawings Lockout/Tagout, Troubleshooting  System & Equipment Assessment Identification of Reliability, Code Concerns  Short-Circuit Analysis Identification of Under-rated Equipment  Time-Current Coordination Optimal Settings for Overcurrent Devices  Arc Flash Analysis Reduced Arc Flash Exposure, PPE, Labels  Corrective Action Recommendations Prioritized System Improvement Projects

Schneider Electric 7 - Engineering Services – January 2009 New NFPA 70E-2009 Released ●NFPA Standards Council issued 70E-2009 in July 2008, not widely available until late 2008 ●Maintains ‘mandatory’ language of a consensus standard ●Represents results of over 500 proposals, 800 comments on previous 70E-2004 version ●Many wording changes throughout document; described as ‘same intent’, but changed for clarity ●PSE processes, methodologies, reports, labels, fully compliant with new version 2009 – Now’s the Time!

Schneider Electric 8 - Engineering Services – January 2009 Key Changes to NFPA 70E-2009 ●Category 0/1 threshold– now 1.2 cal/cm2 vs former 2.0 cal/cm2 ●Ear plugs at all categories, not just >Category 2 ●Analysis cut-off point changed - was <240V and <10kA; now 240V or less served by single transformer <125 kVA ●Labeling now requires PPE category or incident energy level ●Analysis to be updated at time of renovation and reviewed periodically not to exceed every 5 years ●Emphasis on maintenance and testing ●Emphasis on equipment integrity – ‘exposure to electrical hazard’ vs ‘working on or near exposed parts’

Schneider Electric 9 - Engineering Services – January 2009 Construction Studies – Value! ●Verify equipment ratings ●Short-circuit analysis results ●Value engineer project ●Head off project problems due to unusual or less optimal designs ●Identify protective coordination issues ●Ensure selectivity ●NEC Article 700/701 support (e.g. – Healthcare Projects) ●Get the right BOM to satisfy special coordination requirements ●Arc flash analysis ●Calculate exposure levels, identify arc flash mitigation opportunities Use Our Updated Specs! Sales & Marketing home page, then Services, Power System Engineering

Schneider Electric 10 - Engineering Services – January Key Offers ●Arc flash compliance – 2009, Now’s the Time! ●PSE methodologies already updated to 70E-2009 standards ●Customers should update old studies ●To 2009 standards ●If renovations have been made, or if study >5 yrs old ●Arc-flash reduction techniques can reduce exposure ●Construction studies – Value-based and customer focused ●Have you tried Square D – lately? ●Healthcare Risk Assessments ●ID power system deficiencies, prioritize improvements ●Power System Improvement Projects ●Help customer optimize scarce refurbishment dollars ●Power Quality Testing and Troubleshooting ●Don’t let power problems fester, call the experts

Schneider Electric 11 - Engineering Services – January 2009 Whom to Contact? ●PSE / Regional Engineer ●Principal Engineer ●Eddie Jones / Janet Powell

Schneider Electric 12 - Engineering Services – January 2009 PSE Information ●Now have Intranet area ●White Papers, Specifications, How to Sell, Regional Line Card

Schneider Electric 13 - Engineering Services – January 2009 PSE Information ●External webpages