The National Geodetic Survey 10 Year Plan Mission, Vision and Strategy 2008-2018.

Slides:



Advertisements
Similar presentations
Best Practices for Real-Time GNSS Network Administration Webinar July 31, pm ET RTK/RTN Precision vs. Accuracy & Occupation Time Mark L. Armstrong,
Advertisements

New Geometric Datum: plans Modernizing the U.S. National Spatial Reference System FGCS San Diego, California Monday 11 July 2011.
US Army Corps of Engineers BUILDING STRONG ® 5/7/2015 Adopting National Standards for Tidal and Geodetic Datums Jim Garster US Army Corps of Engineers.
New Datums Are Coming in 2022!  Both a new geometric and a new geopotential (vertical) datum will be released in  The realization of the new datums.
National Height Modernization Program (NHMP) Update Great Lakes Region Height Modernization Consortium Meeting Columbus, OH October 13, 2011.
GRAV-D Gravity for the Re-definition of the American Vertical Datum
Federal Geodetic Control Subcommittee Update Federal Geographic Data Committee Coordination Group Meeting Tuesday, November 3, 2009 Juliana Blackwell Director,
NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Updating the International Great Lakes Datum Plan Overview Center for Operational Oceanographic.
Better Positions and Improved Access to the National Spatial Reference System  Multi-Year CORS Solution  National Adjustment of 2011  New NGS Datasheet.
Federal Geodetic Control Subcommittee Update to Coordination Group Ronnie Taylor alternate Subcommittee Chair Deputy Director, National Geodetic Survey.
Marc Véronneau Canadian Geodetic Survey, Surveyor General Branch
Juliana Blackwell, Director National Geodetic Survey, NOAA
International Great Lakes Datum Overview Presented at a Height Modernization Program meeting January 9, 2014 by David Conner Geodetic Advisor to the State.
GEODETIC INFRASTRUCTURE Walter Volkmann Manager of Technical Operations L. D. Bradley Land Surveyors Gainesville, Florida.
NGS HSRP Update Ronnie Taylor, Acting Director National Geodetic Survey, NOAA October 13, 2010.
The Future of the National Geodetic Survey Dr. Dru A. Smith Chief Geodesist, NGS/NOAA CSRC, Coordinating Council Spring Meeting La Jolla, CA April 28,
National Geodetic Survey Update Providence, RI May 6, 2010 Juliana Blackwell Director, National Geodetic Survey.
Advances and Best Practices in Airborne Gravimetry from the U.S. GRAV-D Project Theresa M. Damiani 1, Vicki Childers 1, Sandra Preaux 2, Simon Holmes 3,
≥107 RTN USA ≥35 DOT ACADEMIC/SCIENTIFIC SPATIAL REFERENCE CENTERS VARIOUS DOTS + MACHINE GUIDANCE COUNTY CITY GEODETICSURVEYS(NC,SC) MANUFACTURERS VENDOR.
LINK TO SLIDES: ftp://ftp.ngs.noaa.gov/dist/whenning/FWS2011/
A New & Improved National Spatial Reference System Refinements of the North American Datum of 1983 through the Multi-Year CORS Solution and the National.
NGS Orientation Who are our stakeholders? Why are they important? What is the future of NGS? October 29, 2008 David Zilkoski, Director NOAA’s National.
Transition of the ORGN from NAD 83(CORS96) epoch to NAD 83(2011) epoch Ken Bays, PLS Lead Geodetic Surveyor Oregon DOT March 2013 ODOT.
New Vertical Datum Implementation Plan FGDC Silver Spring, MD. July 30, 2013 Mark C. Eckl Chief of the Observation and Analysis Division, National Geodetic.
The NGS Ten-Year Strategic Plan Dru Smith NOAA’s National Geodetic Survey 1Federal Geodetic Control SubcommitteeJuly 30, 2013.
National Geodetic Survey 101 geodesy.noaa.gov. What is geodesy? Geodesy is the science of measuring and monitoring the size and shape of the Earth. The.
Who Needs New Datums? NGS Says… ftp://ftp.ngs.noaa.gov/pub/marti Marti Ikehara California Geodetic Advisor, Sacramento.
GPS and Geodetic News You Can Use David Conner Geodetic Advisor to the State of Ohio National Geodetic Survey, NOAA 2008 Ohio GIS Conference September.
Geoid Modeling at NOAA Dru A. Smith, Ph.D. National Geodetic Survey National Ocean Service, NOAA November 13, 2000.
Federal Geodetic Control Subcommittee Update Federal Geographic Data Committee Coordination Group Meeting Tuesday, November 3, 2009 Juliana Blackwell Director,
National Geodetic Survey Programs & Geodetic Tools William Stone Southwest Region Geodetic Advisor NOAA’s National Geodetic Survey
Height Modernization Making the Most of the Indiana HARN and the INDOT CORS March 14, 2007 By William A. Schmidt, PE, LS Manager of Aerial Engineering,
Coastal Zone 2011 Conference “Cool Geodetic Resources For Your Project” A National Ocean Service, NOAA, Presentation 1)TOOLS TO OBTAIN GEODETIC CONTROL.
B ≥ 4 H & V, KNOWN & TRUSTED POINTS? B LOCALIZATION RESIDUALS-OUTLIERS? B DO ANY PASSIVE MARKS NEED TO BE HELD? RT BASE WITHIN CALIBRATION (QUALITY TIE.
AEC Summit NOAA’s National Geodetic Survey Update Brian Shaw Geodesist.
Who Needs New Datums? NGS Says… ftp://ftp.ngs.noaa.gov/pub/marti Marti Ikehara California Geodetic Advisor, Sacramento.
Feedback on the New Datums Reference Frames 2015 Geospatial Summit April 14, 2015 Amar Nayegandhi Dewberry Consultants LLC.
National Geodetic Survey – Continuously Operating Reference Stations & Online Positioning User Service (CORS & OPUS) William Stone Southwest Region (UT,
The GRAV-D Project and The Future of NAD 83 and NAVD 88 A briefing for FEMA leadership Dru Smith, Chief Geodesist NOAA’s National Geodetic Survey.
National Geodetic Survey 101 Brett Howe Geodetic Services Division Chief 28 June, 2013 geodesy.noaa.gov.
National Spatial Reference System: Present and Future Marti Ikehara, Geodetic Advisor NOAA’s NGS, Sacramento
The National Geodetic Survey Gravity Program Benefits and Opportunities Juliana Blackwell, Director National Geodetic Survey (NGS)
≥107 RTN USA ≥35 DOT ACADEMIC/SCIENTIFIC SPATIAL REFERENCE CENTERS VARIOUS DOTS + MACHINE GUIDANCE COUNTY CITY GEODETICSURVEYS(NC,SC) MANUFACTURERS VENDOR.
New Vertical Datum: plans, status, GRAV-D update FGCS San Diego, CA. July 11, 2011 Mark C. Eckl NGS Chief of Observation and Analysis Division, New Vertical.
GRAV-D Part II : Examining airborne gravity processing assumptions with an aim towards producing a better gravimetric geoid Theresa Diehl*, Sandra Preaux,
NATIONAL READJUSTMENT WHAT WHY HOW WHEN NAD83(NSRS)
MISSISSIPPI HEIGHT MODERNIZATION PROJECT JUNE 11, 2009 By Ronnie L. Taylor Chief, Geodetic Advisor Branch NOAA, National Geodetic Survey.
Height Modernization Western States Regional Webinar Tuesday, November 19, :00am PT - 2:00pm PT (1:00 – 5:00 pm ET) OPUS-DB Publishing with OPUS.
National Ocean Service NGS, NOS, NOAA Real-Time GPS Positioning of Ships To Integrate Navigation Services Real-Time GPS Positioning of Ships To Integrate.
The Height Modernization Program in the United States and the Future of the National Vertical Reference Frame 1 Renee Shields National Geodetic Survey,
VRSWG Update Renee Shields Height Modernization Manager National Geodetic Survey January 10, 2012.
Height Modernization in the U.S.: Implementing a Vertical Datum Referenced to a Gravimetric Geoid Model Renee Shields National Geodetic Survey, U.S.A.
Modernizing the NSRS: The NGS 10 year plan Dru Smith, Chief Geodesist NOAA’s National Geodetic Survey Federal Geospatial Summit12010 May 11.
Progress toward the Geopotential Reference Frame Dru Smith Dan Roman Vicki Childers 45 minutes April 13, Geospatial Summit1.
Mark Howard October, 2008 NGS ORIENTATION NOAA/NGS Aeronautical Survey Program.
GRAV-D G ravity for the R e-definition of the A merican V ertical D atum Ronnie L. Taylor Chief, State Advisor Branch 1315 East West Highway, RM 9557 Silver.
Who Needs New Datums? NGS Says…
National Geodetic Survey Update Hydrographic Services Review Panel Honolulu, HI May 4, 2011 Juliana Blackwell Director National Geodetic Survey.
National Height Modernization Program Strategic Plan Renee Shields, Height Modernization Program Manager.
Geodetic Applications of GNSS within the United States Dr. Gerald L. Mader National Geodetic Survey NOS/NOAA Silver Spring, Maryland USA Munich Satellite.
Upcoming replacements for NAD83, NAVD88 and IGLD85 Dru Smith, NGS Richard Snay, NGS Thomas Landon, NGS.
Debriefing the Geospatial Summit NGS Monthly Webinar Series September 10, 2015.
Federal Geodetic Control Subcommittee Update Federal Geographic Data Committee Coordination Group Meeting 11 January 2011 Ronnie Taylor Acting Director,
Vertical Geodetic Control in Southern Louisiana: Providing the National Spatial Reference System in Dynamic Regions June 20, 2011 Renee Shields Height.
Overview of Datums Commonly Used in Michigan and the National Spatial Reference System Michigan Society of Professional Surveyors 70 th Annual Meeting.
Update on National Geodetic Survey Activities Joe Evjen, NGS 02 May 2006.
The Future of the National Geodetic Survey Dr. Dru A. Smith Chief Geodesist, NGS/NOAA NGS Convocation Silver Spring, MD October 24, 2005.
National Height Modernization Partner Meeting Neil D. Weston National Geodetic Survey, NOS, NOAA Frankfort, Kentucky April 30 – May 1, 2013.
Update on NGS Activities ftp://ftp.ngs.noaa.gov/pub/marti Marti Ikehara California Geodetic Advisor, Sacramento.
NSRS Modernization Update
Presentation transcript:

The National Geodetic Survey 10 Year Plan Mission, Vision and Strategy

The NGS 10 year plan History Overview Five Technical Improvements Summary

History Fall 2006 (NGS Leadership Summit) –Ten year plan conceptualized Feb 2007 –First draft released for public comment Jan 2008 –Final version approved by NGS for public release

The National Geodetic Survey 10 year plan -- Mission, Vision and Strategy Official NGS policy as of Jan 9, 2008 –Mission Focused –Modernized Agency –Attention to accuracy –Attention to time-changes –Improved products and services –Integration with other fed missions – Targets: –NAD 83 and NAVD 88 re-defined –Cm-accuracy access to all coordinates –Customer-focused agency –Global scientific leadership

Overview Official Title: The National Geodetic Survey 10 year plan -- Mission, Vision and Strategy Newly stated Mission Vision of the future –To accomplish the mission Five Technical Improvements – To achieve the vision

Overview: Mission

The National Spatial Reference System (NSRS) The official system of the federal government which allows a user to determine (inside the USA): –Geodetic latitude, longitude and height –Orthometric height, geopotential –Acceleration of gravity and deflection of the vertical All in the latest official datums, as defined by NGS –The location of the National Shoreline And importantly: –All necessary information to describe how all of these quantities change over time

Components of the NSRS include… Models, Tools and Infrastructure –Orientation and scale relative to Int’l Ref Systems –Precise orbits of GNSS sat’s used to define NSRS –CORS –Some passive monumentation –Accurate and time-tracked gravity field (including the geoid, orthometric heights, dynamic heights) –Programs for coordinate conversion –Standards, Specifications and Guidelines –IT, Outreach

Mission – Geospatial Activities are… …those functions which seek to access the NSRS at one or more points at any accuracy, including (but not limited to) geodesy, surveying, remote sensing, mapping and charting.

Vision – Accuracy and Leadership Key visions, related to the Mission: “Define the NSRS…” –“The NSRS must be more accurate than all activities which build upon it, while still being practicably achievable.” “Maintain the NSRS…” –NGS must track all of the temporal changes to the defining points of the NSRS in such a way as to always maintain the accuracy in the NSRS definition.

Passive monumentation: Today Passive marks define (NAVD 88) and provide access to (NAVD 88 and NAD 83) the NSRS NAD 83 realizations: –CORS96 (active) –NSRS2007 (passive) »Should’ve been the same… –Projects are submitted to NGS for Checking Processing Loading into the database Coordinate assignment Dissemination of coordinates to the public

Passive Monumentation: Future Pasive marks will not define the datums of the NSRS –They will provide secondary access to them Eventually, OPUS (DB) replaces “bluebooking” –Instant results, shared with the public Data files stored for future re-adjustments with other projects –2011(?): Bluebooking for GPS in NAD 83 goes away –2015(?): Bluebooking for leveling in NAVD 88 goes away Sending data to NGS for loading into the database will no longer be equivalent to “my project is part of the NSRS” –“Tied to the NSRS” replaces “Part of the NSRS” Nomenclature implies that NGS has not performed a hands- on check of your work

Passive Monumentation: Future –As CORS and GNSS tools improve, need for passive marks may decrease But never approach “zero” –“NSRS perimeter” will shrink and will not encompass most passive mark surveys submitted to NGS. –Some exceptions Absolute Gravity Tide gauge and other GGOS sites Airport control Re-adjustments of OPUS submissions episodically –Surveyors wishing to share their NSRS coordinates on a passive mark may do so, but NGS does not consider this a “defining point” of the NSRS Only survey marks. –No storage of mailbox coordinates on NGS computers.

Vision – Accuracy and Leadership (2) “Provide Access to the NSRS…” –Update Guidelines For various accuracies –Coordinates and velocities Including orthometric heights, shoreline, gravity, geoid, deflection of the vertical, etc. –This isn’t just about , and h

Achieving the Vision – Five Technical Improvements In order to achieve the vision, these areas of emphasis must drive all future NGS activities: –Modernize the Geometric Datum –Modernize the Geopotential Datum –Migrate the Coastal Mapping Program toward IOCM –Evolve Core Capabilities –Increase Agency Visibility

1)Modernize the Geometric Datum (Step 1: Build Tools and Capacity) Define the required CORS needed to accomplish the NGS mission (in a “minimally acceptable way”) –Spacing, Monumentation, Signals, Constellations Call this: “Foundation” CORS –NGS to own or operate all foundation CORS sites –Monitored coordinates and velocities –Co-located with other geodetic observing systems (VLBI, SLR, LLR, Tide and Water gages) Contributing to GGOS, as part of GEOSS Strict responsibility for all other CORS sites will be on the site operators –Provide contact information for site operator –Minimal NGS resources by developing: Automated data collection and QC Automated “suspension” from CORS for data or metadata problems OPUS-GNSS –All constellations, all signals, any number of receivers, any length of field data collection, any computed accuracy Automated results sharing via (what’s been called) “OPUS-DB” (but with as little connection to the IDB, bluebook and datasheets as possible)

By 2018, a replacement for NAD 83 –Not “horizontal” but “geometric” –New name (call your state legislators now) –Geocentric!!! –Defined and monitored exclusively at CORS sites Connection to “stable” North American plate being resolved. Will go hand in hand with a new “geopotential” datum 1)Modernize the Geometric Datum (Step 2: Re-define the datum)

2) Modernize the Geopotential Datum (Step 1: Build Tools and Capacity) Develop better theory –Proof that perfect data can actually yield a <1 cm accurate gravimetric geoid Collect and clean data –Consistent, up-to-date, and gapless gravity data set Only possible through GRAV-D –This will be the largest project to hit NGS since NAVD 88 –Epoch-tags and velocities Absolute Gravity sites re-visited episodically to directly observe velocity of gravity Spot Gravity velocities modeled from absolute and satellite gravity missions Clear Direction –Defining the North American vertical datum through GNSS and a gravimetric geoid by 2018

Official NGS policy as of Nov 14, 2007 –Airborne gravity survey (10 years) –Gravity monitoring into the future –Coastal areas surveyed first –All USA states and territories – Targets: –Orthometric heights good to 2 cm anywhere, anytime from GNSS technology –Height changes easily monitored using new vertical datum GRAV-D Gravity for the Redefinition of the American Vertical Datum

3) Migrate Coastal Mapping toward IOCM Improve Efficiency –Adoption of new tools LIDAR, Thermal Imagers, Digital Cameras –Reduction of human subjectivity Improves automation Complete VDatum –Integral for consistent tide-coordinated shoreline Migrate toward IOCM –Fully integrate NGS shoreline activities with other NOAA coastal mapping

4) Evolve Core Capabilities Retrain and retool NGS workforce –Training –Succession Planning –Visiting Scientists / Sabbaticals Product oversight –Strong Products and Services Committee Always asking: “Is this part of the NGS mission?” Modernize tools –Transition to automated, web based tools –Improve or retire aging products and services Where is a simple, clean, up to date, all-purpose, all-datum transformation tool?

4) Evolve Core Capabilities (cont.) Outreach – Get Critical messages out now –New Datums by 2018 –Height Modernization means CORS, gravimetric geoid or local vertical studies. Installation of new passive marks only as part of the whole, not as the perpetual solution to a deteriorating vertical datum

5) Increase Agency Visibility Focus on what we do best: –Datums, Tools, Surveys, Guidelines, Coastline –Do a few things best rather than a lot of things “so so” –Increased outreach –More interagency cooperation –Broader publication record

10 year plan - Summary Strong Mission statement acting as a beacon Vision of the future based on improved leadership and deliverable accuracy Five technical improvements to move us forward

Status of Plan’s Milestones 2008 was a “transition year” –Foundation CORS being defined –GRAV-D begun ; funding / partners sought –IOCM pilot projects –Products and Services being examined: Keep / Upgrade / Deactivate OPUS-DB is live!

Questions/Comments? Dr. Dru Smith Chief Geodesist, National Geodetic Survey x 144