Lahore Waste Management Company City District Government Lahore Progress for Outsourcing of Solid Waste Management Functions in Six Cities of Punjab.

Slides:



Advertisements
Similar presentations
PRE-QUALIFICATION/ SHORT LISTING OF CONSULTANTS PRE-QUALIFICATION/ SHORT LISTING OF CONSULTANTS.
Advertisements

ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
STANDARD BIDDING DOCUMENT PROCUREMENT OF GOODS (FOR VALUE UP TO NU.0.25 MILLION) Presentation by: Tshewang Gyeltshen.
Inter-American Development Bank Procurement of Goods, Works and Consulting Services in projects financed by IDB Washington, DC – February 2004.
Procurement in PPPs February 27, When do you start thinking about procurement? Preliminary Scoping & teaming Viability assessment Choice between.
Tendering Procedures in Lagos State under the Public Procurement Law 2011 Presented By Engr. Akin Onimole | February 13, 2013 GM/CEO, Public Procurement.
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
Multi-Stage Bidding.
Prequalification Process / Subcontract Lisa Conomy Construction Counsel, OSU Lane Beougher State Architect.
Inter-American Development Bank Procurement of Goods, Works and Consulting Services in projects financed by IDB Washington, DC – July 2004.
1 Use and content of the RFP  Request for Proposals (RFP) is similar to bidding documents and include all information of the assignment, selection of.
Guaranteed Energy Savings Contracts Contracting Requirements for Local Governments Norma Houston NCGFOA Annual Conference July 18, 2011.
Nazaneen I. Ali Sr. Procurement Specialist. Main characteristics of QCBS Both quality & cost aspects taken into account Allows to determine the right.
Consolidated Equipment Financing Program (CEFP) Department of Financial Services Bureau of Accounting.
PROCEDURES FOR SELECTING THE CONTRACTOR
1 Bid evaluation - Works  Clarification of bids ( if necessary)  Determination of responsiveness “Substantial” responsiveness No material deviations.
REPLACEMENT AND MAINTENANCE OF LIFTS GIVING ACCESS TO LHC UNDERGROUND AREAS TENDERING PROCEDURE IT-4056/EN 105 December 2014 Floris Bonthond.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
1 Training on Procurement Procedure 23 rd Review Meeting of State FCs- Bhopal ( ) Annexure ‘W’
LAHORE WASTE MANAGEMENT COMPANY. Key Milestones Services and Assets Management Agreement (SAAMA) Status – Not signed in any district Identification of.
LAHORE WASTE MANAGEMENT COMPANY 1. Sequence A.Contract Details 1.Procurement procedure 2.Design 3.Financial Model 4.Bid Opening B.Performance Monitoring.
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
LAHORE WASTE MANAGEMENT COMPANY. Decisions of meeting on S&GAD may place the services of competent officers at the disposal of Board of Directors.
TENDERING PROCEDURE IT- 3927/EN
United Nations Procurement Division
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4103/EN/LHCb Design, Supply, Installation and Commissioning of an HVAC system, a Smoke.
Public Procurement Reforms
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
CONSTRUCTION CONTRACTS DOCUEMENTS
Mr. Thilak de Silva. BSc. Eng., MSc, CEng, FIE(SL), FIET(UK), CITP(UK), MBCS(UK), MIEEE (USA) M.Sc. in IT - Year 1 Semester II
Construction Contracts
LAHORE WASTE MANAGEMENT COMPANY. Decisions of meeting on S&GAD may place the services of competent officers at the disposal of Board of Directors.
LAHORE WASTE MANAGEMENT COMPANY. Prequalification of firms RFP( International) advertised on 22 nd July 2013 Submission Date was 22 August, Pre-qualification.
Elevating the Quality of Life in the District Contracting and Procurement Division Information Session 2 Request for Proposal November 5, 2015.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4134/EN/LHC Supply and Commissioning of HVAC Systems for Five LHC Surface Buildings B.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4082/EN Design, Supply, Installation and Commissioning of the ventilation of the BAF3.
In September of 2012 the RA Government made amendments in the Resolution No 168 on ‘Regulation of Procurement Procedures". 1. It is the responsibility.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
Introduction to Procurement for Public Housing Authorities Sealed Bids Unit 5.
The Private Sector and the Caribbean: Working Together for Development June 23, 2010 Procurement Policies and Procedures for Goods, Works and Consulting.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4154/EN Supply Centrifugal Water Pumps B. Jenssen
PRE-BID MEETING CONSTRUCTION OF THE MEDUPI-BORUTHO TRANSMISSION LINE PRE-BID MEETING WORLD BANK GUIDELINES Presented by: Brendah Shange.
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
BOS 1 Procurement of Goods and Works Asian Development Bank Business Opportunities.
Ministry of Finance Financial management and control of the Operational Programmes, co- financed under the Structural funds and the Cohesion fund of EU.
ICTAD Formula Method for EMERGENCY NORTHERN RECOVERY PROJECT
The Public Tendering and Bidding (招投标) Law of the People's Republic of China Effective since January 1, 2000.
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT – 4142/EN Supply, Installation, Testing and Commissioning of the HVAC System for the.
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
FIDIC Tendering Procedures
Preparing EOI and RFP.
BOT LAW (R.A. No. 6957, as amended by R.A. No. 7718)
TECHNICAL ASSISTANCE FUND IIB– Slovak Republic
Particular Conditions of Contract & Appendix to Tender
Administration of a FIDIC Contract - Financial Management
Administration of a FIDIC Contract - Award to Commencement -
TENDERING PROCEDURE IT-3981/EN
Particular Conditions of Contract & Appendix to Tender
Makerere University Investors Conference
BIDDING DOCUMENTS AND MAIN FEATURES
Procurement Planning Mani Ram Gelal
INTERNATIONAL COMPETITIVE BIDDING (ICB)
PROCEDURES FOR GRANTING OF A PETROLEUM EXPLORATION LICENCE
Slovak Republic - International Investment Bank Technical Assistance Fund
IT-4464/EN Bidders conference
ICTAD Formula Method for Price Fluctuation Price Fluctuation.
Presentation transcript:

Lahore Waste Management Company City District Government Lahore Progress for Outsourcing of Solid Waste Management Functions in Six Cities of Punjab

TIME LINES FOR BIDDING PROCESS

Sr. No ActivityTime LineActivity Days Remarks 1Preparation of Prequalification Documents & Submission to the Companies for Approval of BODs Jul 20, Publication of Pre-qualification Advertisement in Local & International Newspapers and PPRA Web Jul 22, Approval of prequalified documents by the Respective BODsJuly 26, Issuance of Prequalification Documents to Potential Applicants/Bidders Jul 27, Submission of Technical Proposals by Potential Bidders and Opening of Technical Proposals Aug 22, Technical Evaluation by LWMC(Consultant)Aug 30, Submission to the Respective Companies for BODs ApprovalSep 03, Preparation of Bid Documents & Submission to Companies for BODs Approval Sep 06, Invitation to Bid to Prequalified BiddersSep 10,201304Issued for FSD, SKT TIME LINES FOR BIDDING PROCESS

Sr. No ActivityTime LineActivity Days Remarks 10Issuance of Bid Documents to Prequalified Bidders Sep 12, Being issued as per approvals received from respective BODs 11Pre-Bid MeetingSep 15, Expected on Sep 25, Submission of Financial Proposals & Opening Sep 21, Expected Sep 30, Financial Evaluation by LWMCSep 24, Will be done till Oct 05, Appraisal by Finance DepartmentSep26, Oct 07, Final Negotiation by the Committee Sep28, Oct 08, Approval of Financial Bid by Respective BODs Oct 03, Oct 12, Award and Signing of Contract7th Oct, 2013-Oct 14, 2013 Cont’d...

PREQUALIFICATION CRITERIA AND QUALIFYING MARKS RFP( International) advertised on 22 nd July 2013 Submission Date was 22 August, Pre-qualification Criteria Business experience and certification (25 marks) Personnel capabilities (20 marks) Equipment & machinery (30 marks) Financial capability (25 marks) Total Qualifying Marks = 60% Criteria encourage local contractors for bidding, the marks were allocated proportionate to capabilities

Prequalification Results Name of Firms/ Cities/ Marks Obtained FSDGJWMULRWPSKTBHWLResult M/s. Albayrak100 Qualified M/s. Ozpak100 Qualified M/s. Cevre Qualified M/s. GHSN/A51.5N/A 62 Qualified in SKT, BHWL) M/s. Waste Buster30 39 Disqualified 1.For small cities ( Sialkot, Bahawalpur)For small cities ( Sialkot, Bahawalpur) 2.For large cities ( Faisalabad, Gujranwala, Rawalpindi, Multan)For large cities ( Faisalabad, Gujranwala, Rawalpindi, Multan) The criteria was relaxed to encourage the local firms.

1.BID SECURITY The amount of Bid Security for Large city LocalRs 100 Million InternationalUSD 1 Million (Count….) BIDDING DATA

The amount of Bid Security for Small city (Bahawalpur & Sialkot) LocalRs 50 Million InternationalUSD 0.5 Million 4. PERFORMANCE SECURITY 10 % of Contract Price in form of Bank Guarantee for 7 Years. 5. SUB CONTRACTING Contractor may execute subcontract for services up to 30% of total services. 6. PENALTIES (right click to see the detail)(right click to see the detail) The amount of penalty to be imposed during one month shall not, in any case, exceed 15 % of the monthly progress payment.

7Price Escalation The amounts payable to the Contractor, pursuant shall be adjusted in respect of the rise or fall in the cost of labor and fuel by applying to such amount the formula prescribed in this. i)Pn = A + b Ln + c Fn Lo Fo where,  “Pn” is the Price Adjustment factor.  “n” (excluding Fixed Cost, Reimbursable Cost and Provisional Sums).  “A” is a constant or the Non-Adjustable Portion of the Price Adjustment Factor to be specified, representing the Non-Adjustable Portion of the Contract Price.  “b, c, are Coefficients or weightages of the order of 0.xx  “Lo, Fo, are the Base Date Indices for the Labor and Fuel are adjustable elements.

ii) Coefficients: A = 0.70 b = 0.10Labor c = 0.20 Fuel iii) Base and Current Dates Prices and Source of Prices The prices of elements subject to Price Adjustment shall be to the extent possible as given in the Statistical Bulletins published by the Federal Bureau of Statistics (FBS), Statistical Division Government of Pakistan. Statutory notifications and official price from public sector organizations, where available, may be used at the option of the Employer. The source for prices of High Speed Diesel (HSD) shall be either be Statistical Bulletins or Pakistan State Oil (PSO). However, for a particular adjustable element, the same source shall be used throughout the currency of contract as also stipulated in the tender documents before issuing the tender documents. Cont….

8.MOBILIZATION ADVANCE (Option 1) An amount up to 10% of the contractor value shall be granted as an advance in two equal installments, upon request of the applicant, before starting the work and after signing the Contract. This advance payment shall be deducted, from monthly performance payments of the Applicant in 24 installments, within 36 months period from commencement of work subject to Bank guarantee letter from schedule Bank of Pakistan. (Option 2) Mobilization advance shall be payable for meeting local duties & taxes and will be payable on phase wise arrival of imported machinery in Pakistan. Mobilization advance shall not exceed 15% of initial investment amount (pertaining only to imported vehicles and other imported equipment) as per the signed contract. This advance payment shall be deducted, from monthly performance payments of the Applicant in 24 installments, within 36 months period from commencement of work subject to Bank guarantee letter from schedule Bank of Pakistan.