IMPROVING THE MRF BASELINE Prague, June 5 th 2014.

Slides:



Advertisements
Similar presentations
IEEE INFOCOM 2004 MultiNet: Connecting to Multiple IEEE Networks Using a Single Wireless Card.
Advertisements

User Oriented APIs for Timing System Jim Chen Hytec Electronics Ltd Timing Workshop – 5 th June 2014, Prague.
Stephanie Allison LCLS Event System 14 June LCLS Event System Outline HW Block Diagram Timing Requirements Time Lines EVG.
FPGAs for HIL and Engine Simulation
ESS Timing System Plans and Requirements Timo Korhonen Chief Engineer, Integrated Control System Division May 19, 2014.
Wir schaffen Wissen – heute für morgen Babak Kalantari, PSI MRF workshop, Prague, Eli Beamlines Paul Scherrer Institut SwissFEL Timing System.
Dayle Kotturi and Stephanie Allison Facility Advisory Committee Meeting April 20-21,
Introduction to ISA 2004 Dana Epp Microsoft Security MVP.
Notes to the presenter. I would like to thank Jim Waldo, Jon Bostrom, and Dennis Govoni. They helped me put this presentation together for the field.
CHAPTER 1 Introduction to Game Development © 2008 Cengage Learning EMEA.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
Internetworking Fundamentals (Lecture #2) Andres Rengifo Copyright 2008.
Agenda Adaptation of existing open-source control systems from compact accelerators to large scale facilities.
CS101 Introduction to Computing Lecture SW Development Methodology.
CASTNESS‘11 Computer Architectures and Software Tools for Numerical Embedded Scalable Systems Workshop & School: Roma January 17-18th 2011 Frédéric ROUSSEAU.
INTRODUCE OF SINAP TIMING SYSTEM
T Project Review Magnificent Seven Project planning iteration
Wir schaffen Wissen – heute für morgen Babak Kalantari, PSI EPICS Meeting, Saclay Paul Scherrer Institut SwissFEL Timing System Babak Kalantari.
LCLS Timing Software and Plan 1 Controls Timing Workshop EPICS Collaboration Meeting SLAC LCLS Timing Software and Plan April Kukhee Kim.
Status of BEPCII Timing System Presented by Ge Lei IMAC 2006.
John Dusatko 2012 EPICS Timing Workshop The SLAC Timing System April 24, The Accelerator Timing System at SLAC: Experiences, Ideas & Future Plans.
WP CO Column Status and Progress October 7th, 2010 Johannes Gutleber PR a-JGU, October 7th, 2010 J. Gutleber 1 R. Gutleber.
REDNET Prototype overview Rok Stefanic the best people make cosylab.
ProShell Procedure Framework Status MedAustron Control System Week 3 December 8 th, 2010 Roland Moser PR a-RMO, December 8 th, 2010 Roland Moser.
Integrated Management Solutions for Network Access Control and IPAM RT Com USA 10 Millpond Dr., Unit #2 Lafayette, NJ Phone: Fax:
EPICS Collaboration Meeting Fall PAL October 22 ~ 26, 2012 LCLS-I/LCLS-II Timing System Low Level Kukhee Kim for LCLS Timing Team ICD Software,
MRF & Cosylab on timing system: integration support Joze Dedic the best people make cosylab … Head of Hardware.
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
Processes Introduction to Operating Systems: Module 3.
EPICS Collaboration Meeting Fall PAL October 22 ~ 26, 2012 LCLS Timing System (pattern design, evGUI, and high level) Mike Zelazny for LCLS Timing.
L. A. S. E. R Local Authority Security Enterprise Reporting System Architecture.
PR a-JGU, October 9th, 2011 J. Gutleber 1 MedAustron PXI Systems at CERN Johannes Gutleber Roland Moser.
1 Timo Korhonen & Babak Kalantari PSI, Villigen, Switzerland 1. drvTS revisited 2. Wishlist 3. Current status 4. Proposal Updating IOC Time Capabilities.
Motivations for Innovations in Operational Excellence Bruce Rodin VP – Wireless Technology Bell Canada.
REDNet - Status overview Rok Stefanic Ziga Kroflic
FECOS the best people make cosylab Matej Miha Rok
Review of Non-Commercial Frameworks for Distributed Control Systems B. Lopez European Gravitational Observatory ACS Workshop 2007.
Integrating Active Directory with eDirectory ™ Using Novell Account Manager Reid Oakes Technical Team Manager Novell, Inc.
ProShell Procedure Framework Status MedAustron Control System Week 2 October 7 th, 2010 Roland Moser PR a-RMO, October 7 th, 2010 Roland Moser 1.
ESS Timing System Prototype 2012 Miha Reščič, ICS
Manual Testing Lesson 3 Test Driving your application.
Wir schaffen Wissen – heute für morgen Babak Kalantari, PSI MRF workshop, Prague, Eli Beamlines Paul Scherrer Institut Synchronous DAQ using.
575 Features Overview. Existing Features ► System Modes ► Independent Channel Modes ► System Gating ► Channel Gating ► External Trigger ► Channel Multiplexing.
Control System Considerations for ADS EuCARD-2/MAX Accelerators for Accelerator Driven Systems Workshop, CERN, March 20-21, 2014 Klemen Žagar Robert Modic.
Vertical column Joze Dedic … on behalf of CSL MA team the best people make cosylab.
ProShell Procedure Framework Status MedAustron Control System Week 3 October 3 rd, 2011 Roland Moser PR a-RMO, October 3rd, 2011 Roland Moser 1.
Page Beam Instrumentation mini- workshop Conclusions from the Hardware, Timing and MPS mini-workshop Lund, Miha Reščič Deputy Head of
ESS (vacuum) control system Daniel Piso Controls Division February 20, 2013.
0 Agile Controller Key Message KM 1: Service Experience-centered Network Redefinition KM 2: Network-wide United Security KM 3: Product Openness and Collaboration.
1 © 2012 Strangeloop NetworksStrangeloop. Faster Websites. Automatically. 1 Cross Platform Mobile Development using C# Kent Alstad.
IFTTT RECIPES WITH NETWORK CONSIDERATION PROJECT PRESENTATION CS 237 DISTRIBUTED SYSTEMS MIDDLEWARE.
Integrating Advantech PCI I/O cards into EPICS. Outline ANTARES computer control and data acquisition systems architecture STAR computer control and data.
Matthew Locke November 2007 A Linux Power Management Architecture.
ESS Timing System Plans Timo Korhonen Chief Engineer, Integrated Control System Division Nov.27, 2014.
Main Timing System Overview
SLAC I&C Division / EE Department
Dynamo: A Runtime Codesign Environment
SuperComputing 2003 “The Great Academia / Industry Grid Debate” ?
Beam-Synchronous Data Acquisition (BS-DAQ)
Smart Ethernet I/O P2P and GCL Introduction
HUAWEI eSight Secure Center Feature Introduction
Fault-Tolerant NoC-based Manycore system: Reconfiguration & Scheduling
Big Data Analytics: HW#3
MES Migration HGP Asia Knowledge Day 2017
Supporting Continuous Integration in Embedded Software
ECE 554 HW Tutorial Spring Good afternoon everyone.
Epic Roadmap July-Dec 2019 Non Linux Platform Support July-Dec 2018
Design Principles of the CMS Level-1 Trigger Control and Hardware Monitoring System Ildefons Magrans de Abril Institute for High Energy Physics, Vienna.
Plan for controls with the digital platform
ICS update 7th Experiment Control Workshop
Presentation transcript:

IMPROVING THE MRF BASELINE Prague, June 5 th 2014

 Motivation for the presence  Cosylab timing projects  Cosylab wishes for MRF future Introduction

 we are now 85 and part of big projects ITER, ESS, MedAustron, Solaris, FAIR…. we like to do things efficiently and standardize solutions which we believe is the most efficient for community  my personal interest is timing-system standardization  and besides above there are many emerging; RISP, MYRRHA, BNCT where timing system shall be crucial part  we believe MRF is a very solid platform for timing system solutions About Cosylab 3

 ESS after analyzing ESS needs we believe MRF FW upgrades are needed we started with MRF “branch”, now we discussed with Timo to address this  MedAustron highly customized, medical-suited FW upgrade of MRF extended MRF to provide virtual accelerator service 4PY put into real-time application layer for medical ramping-synchrotron accelerator together with Jukka made PXIe EVR  RISP/RAON compare MRF “off the shelf” and WR we really appreciate MRF platform we can buy from Jukka  FAIR it is WR, we are following this community and we understand situation  Solaris MRF off the shelf + Tango  MYRRHA MRF off the shelf + mrfioc2 Timing projects 4

MedAustron REDNET 1x MRF EVG n-x MRF EVR  REDNET = real-time event and data network  requirement analysis,  architecture design  development (LV + FPGA), testing…  effort: ~4 MY MRF network

ESS timing system  implementation using standardized EPICS Nominal Device Support  additions to MRF FW with fallback sequences, data emission coupled with sequences, “MPS” PoC  effort: ~1.5 MY

RISP / RAON 7 Compare MRF & WR Requirements Architecture

 data buffer emission done in RT (HW) and synchronized with sequencer(s)  sequencer gating in different modes (direct termination, graceful termination) low level RT coupling with MPS  automatic propagation delay compensation  user trigger events with additional conditions for emission trigger timing event, delay, number of repetitions, decimation  easier/standardized setup of the system - everyone needs to know the TS very well before "Hello World" can be made Abstraction layer – integrator should deal with his needs not direct HW configuration  more complete SW support (additions to mrfioc2) Cosylab wishes for MRF future 8