1 ILE Project Integrated Logistics Environment Kickoff Meeting Location:Mystic Marriott Hotel Groton, CT Date:Thursday, June 17, 2010 Overview Presented.

Slides:



Advertisements
Similar presentations
FCMAT Response & Preparation: Process Outline October 25, 2006.
Advertisements

Spare Equipment Database Task Force
Dean Fortin – Massachusetts WIC 23 July System Testing Objectives  Verify hardware  Verify software  Verify hardware/software interaction  Verify.
1 Project Planning with MS Project Kishore October 2002 Notes available in the presentation: To view notes download the presentation and select View->
Who does what and when? Mary Rowlatt MDR Partners.
November Northrop Grumman Ship Systems 14th annual International Integrated Program Management Conference Washington D.C.
ISSUES TO CONSIDER IN YOUR PROJECT This is a short presentation from issues discussed in a meeting of MCS3 on Tues 2 nd March 2004.
Ship Common Information Model (SCIM)
Lee Rogers, Instructional Designer Presentation Date: July 30, 2012 Client Organization: ABC English School Project Management Plan For ABC English School.
Web Advisory Committee Overview CMS Project Status Update Project objective Project deliverables Project timelines CMS pilot demos (upcoming)
Interim SCIM and STEP Implementation 2008 NSRP System Technology Panel Project Ted Briggs, Intergraph Corp. Mike Olson, Northrop Grumman Information Systems.
GTRInewFormat.ppt-1 Electronic Systems Laboratory TMC Operator Requirements and Position Descriptions, Phase 2, Kickoff Meeting Presented by Dennis J.
Market Coordination Team Update to RMS.  MCT Kick-off Meeting Update… –1 st MCT Meeting was held on 3/2 (Austin) Twenty five people were in attendance.
IT 499 Bachelor Capstone Week 8. Adgenda Administrative Review UNIT Seven UNIT Eight Project UNIT Nine Preview Project Status Summary.
Integrated Logistics Environment (ILE) NSRP Joint Panel Meeting 7 – 9 December 2010 New Orleans, LA 1 Presented by: Michael Olson Northrop Grumman Technical.
1 ILE Project Integrated Logistics Environment Kickoff Meeting Subtask 1.2 Sharing Structural Design Data with Manufacturing Systems Presented by: Michael.
27 Apr ‘06 1 Integrated Shipbuilding Environment (ISE) Overview April 27, 2006.
® © 2009 Open Geospatial Consortium, Inc. Starting an Interoperability Experiment David Arctur, OGC Director, Interoperability Programs December 8, 2009.
Boston University Project Management Association Website Development Group 3 Team3 CS632 Dr. Vijay Kanabar Team Members Mario Soto Emily Ziegler Kevin.
2010 W EST V IRGINIA GIS C ONFERENCE Wednesday, June 9, 2010.
1 Integrated Logistics Environment (ILE) Project Presented by : Dr. Burton Gischner Date:May 3, 2011 NSRP Joint Panel Meeting San Diego, CA.
30 April Enabling Shipbuilding Interoperability ISE-6 Project Exchange of Product Models for Life Cycle Support ISE-6 Final Demonstration Overview.
FP OntoGrid: Paving the way for Knowledgeable Grid Services and Systems Communication in the consortium Review meeting Delft,
Chapter Training Kickoff 1 Jan. 1, 2011 Chapter Training Coordinators Kickoff.
OSD CAIG 1 Walt Cooper OSD Cost Analysis Improvement Group (CAIG) August 13, 2008 Weapon System Sustainment: Collection of Contractor Costs.
1 Engineering Design - A general approach. 2 Outline Form a group Proposal (Presentation and 1 st Mandatory Meeting) Milestone A (Demo A and 2 nd Mandatory.
TDTWG NAESB EDM v1.6 Project Update to RMS Thursday October 16, 2003.
PDS Geosciences Node Page 1 Archiving Mars Mission Data Sets with the Planetary Data System Report to MEPAG Edward A. Guinness Dept. of Earth and Planetary.
1 ILE Project Integrated Logistics Environment Kickoff Meeting Task 2 Completion of the Ship Common Information Model Presented by: Dr. Burton Gischner.
GK-12 Fall Workshop 8a.m. Depart from Southern Miss 9:30/45a.m. Arrive Institute for Marine Mammal Sciences 12:00p.m. Lunch/GK-12 meeting at IMMS 12:45p.m.
Publish ISO Technical Corrigenda for ISO , and NSRP Systems Technology Panel Project Pete Lazo Product Data Services Corporation.
Interim SCIM and STEP Implementation 2008 System Technology Panel Project Ted Briggs, Intergraph Mike Olson, Northrop Grumman Ron Wood, Northrop Grumman.
ISE4 Alternate Demo Scenario Incorporates suggestions B. Kassel, S. Gordon, & B. Gischner with input from: T. Briggs and S. Moore May 23, 2005.
Sacramento Area Council of Governments ITS Partnership Meeting February 2, 2005.
Lesson 1: Examining Professional Project Management Topic 1A: Identify Project Management Processes.
Q u a l i t y 1 Austin Energy Electric Service Delivery Quality Management System.
Working Group 8 – E9-1-1 Best Practices September 23, 2011 Robin Howard Chair WG 8 – E911 Best Practices.
ISE6 Demo Scenario From 8/30/2007 Telecon. 8/30/2007 ISE6 Demo Scenario 2 Demonstration Core idea: –Use of PLCS enables: Maintaining the right configuration.
National Shipbuilding Research Program Integrated Logistics Environment Project Kickoff Meeting Mystic, CT June 2010 MISSION Manage and focus National.
VA Indian Health Service BCMA Effort Chris L. Tucker Director, Bar Code Resource Office VHA OIA, Health Informatics.
Welcome and Introductions 1 Ron Wood ILE Kick-off Meeting on June 17, 2010 Technology Investment Agreement (TIA): Integrated Logistics Environment.
Independent Expert Program Review (IEPR) February 2006.
ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART) February 12, 2009.
November 4, An Integrated Logistics Environment for an Effective Shipbuilding & Supporting Enterprise Prepared by: Dr. Burton GischnerElectric Boat.
1 ILE Project Integrated Logistics Environment Kickoff Meeting NPDI Project & SCIM Summary & Status Presented by: Rick Lobsitz (NGTS)
Publish ISO Technical Corrigenda for ISO , and NSRP Systems Technology Panel Project Pete Lazo Product Data Services Corporation.
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
1 S HIP T ECH 2011 A S HIPBUILDING T ECHNOLOGIES I NFORMATION E XCHANGE Total Ownership Cost/Quality/Energy Efficiency Completion and Validation of the.
Middle Fork Project Relicensing Process Plan April 25, 2006.
For Presentation at 28 th APEC Transportation Working Group Meeting Vancouver, Canada Walter Kulyk Director, Office of Mobility Innovation Federal Transit.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PHMSA HMEP Grant Program ~ Administrative Requirements NASTTPOAnnualConference.
Operating Procedures 1 Mimi Reis NSRP ILE Kick-off Meeting on June 17, 2010 Integrated Logistics Environment Technology Investment Agreement (TIA)
ENGINEERING SERVICE CENTER EMSWeb FES-West 2009 ENVIRONMENTAL MANAGEMENT SYSTEM WEB SITE (EMSWeb) Eugene Wang NFESC -- Code 423 (805)
Steve Peedell Joint Research Centre
IDN Variant TLDs Program Update
Health Resources and Services Administration (HRSA)
2nd Roadway Safety Data Capabilities Assessment
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
EMIS 7300 SYSTEMS ANALYSIS METHODS FALL 2005
Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16
GOMACTech-04 Technical Program Committee Timeline
Mentor-Protégé Program (MPP) Program Management Review (PMR)
GANTT CHART can be used for scheduling generic resources as well as project management. They can also be used for scheduling production processes and.
Electrical Technologies Panel Chair’s Report
Ctclink executive leadership committee May 31, 2018
Work Cell Development Ingalls Shipbuilding March 13, 2019
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Shipboard Cable Trays 07/24/19 Atlanta, GA
Presentation transcript:

1 ILE Project Integrated Logistics Environment Kickoff Meeting Location:Mystic Marriott Hotel Groton, CT Date:Thursday, June 17, 2010 Overview Presented by: Dr. Burton Gischner

2 ILE Project Overview l Goals l Objectives l Project Administration l Technology Transfer Activities l Program Management, Technology Transfer, and Software Development Plans l Deliverables and Milestones l Schedule for Upcoming Meetings

3 Goals l Tools and Methods for Supporting Next Generation Shipbuilding IPDE (SCIM Evaluation) – –This task will demonstrate the capabilities of the NPDI SCIM as the means for supporting the next generation IPDE l l Completion of the Ship Common Information Model (SCIM Development) – –This task proposes to complete the remaining chapters of the Ship Common Information Model

4 Objectives l Tools and Methods for Supporting Next Generation Shipbuilding IPDE (SCIM Evaluation) – –This task will apply the tools and methods developed by the ISE team to two current shipbuilding requirements: VIRGINIA Class IPDE data migration and sharing of DDG 1000 structural design data with manufacturing systems across shipyards – –Moreover, this task will use the NPDI Ship Common Information Model (SCIM) as the basis for these two pilots – –As a result, this task will not only benefit current Navy programs but will also demonstrate the capabilities of the NPDI SCIM as the means for supporting interoperability of the next generation IPDE

5 Objectives cont’d. l l Completion of the Ship Common Information Model (SCIM Development) – –The Ship Common Information Model (SCIM) was defined as requiring fifteen chapters to specify the requirements for exchange of product model data among shipyards and the Navy. The development of eight of these chapters has been funded through NSRP under the Navy Product Data Initiative (NPDI). – –This effort will complete the SCIM and thereby will facilitate the data exchanges to be developed within the Integrated Logistics Environment

6 Project Administration l Project is administered and led by Electric Boat (EB) l Subcontractors: –Northrop Grumman Shipbuilding (NGSB) –Northrop Grumman Technical Services (NGTS) –Product Data Services (PDS) l Administration will be guided by a Program Management Plan to be developed in the next few weeks

7 Project Exploder l The Exploder established for the ISE-4, ISE-5, and ISE-6 Projects will continue to be used for ILE l It is entitled: l l In addition, a Bulletin Board remains available under the ISETools.org website – –Permits threaded discussions – –Automated Registration – –Ability to only retrieve messages when desired

8 ISETools.org Bulletin Board l Accessible from the ISE Tools website – »Click on Bulletin Board l Communicate with other registered members –Automated registration –Create new discussion topics –Reply to existing discussion topics –Include attachments with your message –Receive notifications of new replies, as desired

9 Technology Transfer Activities l Updates and Presentations during 1 st Year –Project Updates will be given at each System Technology Panel Meeting »Next Meeting: Washington, DCSept. – Oct »Following Meeting: New Orleans, LA Dec –Presentation at: Ship Production Symposium »Bellevue, WANovember 3-5, 2010 –Possible Presentation at: ShipTech 2011 »Biloxi, MSMarch 15-16, 2011

10 Program Management Plan Technology Transfer Plan Software Development Plan l These three deliverables will guide the execution of the project l Will be completed and delivered by June 30, 2010

11 Deliverables and Milestones l Each of the two tasks will have a set of Deliverables and Milestones at the end of each Quarter, and there will be a Wrap-up Meeting and Final Report in Washington, DC at the conclusion of Month 12 for the SCIM Evaluation Task (Task 1) and at the conclusion of Month 24 for the SCIM Development Task (Task 2) l There will also be a Business Status Report and a Technical Status Report issued as a Deliverable at the end of each Quarter l The list below provides a description of the deliverables for each task

12 Deliverables and Milestones cont’d. Task MonthDeliverable 1.12Report on Extraction of Piping Data in SCIM Format from VIRGINIA IPDE 1.15Report on Extraction of Structural Data in SCIM Format from VIRGINIA IPDE 1.18Analysis of SCIM Piping & Structural Models vs. Data Needed for VIRGINIA Migration 1.111Final Wrap-up Meeting & Report of SCIM Deficiencies in Piping & Structural and Recommendations 1.22Structural Model Import Requirements Report for DDG SCIM Gap Analysis Report for DDG SCIM Dataset Results Report for DDG Final Wrap-up Meeting & Import Results Report for DDG Complete SCIM Chapters for HVAC Functional & Physical Design 217Complete SCIM Chapters for Electrotechnical Functional & Physical Design 220Complete SCIM Chapters for Pipe Stress & Engineering Analysis 223Complete SCIM Chapter for Structural CAM (Lofting & Nesting) 224Final Report

13 Deliverables and Milestones cont’d. MonthDeliverable 21st Qtr Business & Technical Status Reports 52nd Qtr Business & Technical Status Reports 83rd Qtr Business & Technical Status Reports 114th Qtr Business & Technical Status Reports 145th Qtr Business & Technical Status Reports 176th Qtr Business & Technical Status Reports 207th Qtr Business & Technical Status Reports 238th Qtr Business & Technical Status Reports

14 Schedule for Upcoming Meetings l June 2010 – Kickoff Meeting – Groton, CT l Oct –Technical/Design Review Meeting – Virginia Beach, VA l Nov – Presentation at SPS – Bellevue, WA l Jan – Technical/Design Review Meeting– Groton, CT l Mar, 2011 – Presentation at ShipTech 2011 – Biloxi, MS l Apr – Team Meeting – Washington, DC l May 2011 – Kickoff Meeting for Task 2 – Groton, CT l Oct – Technical/Design Review Meeting– Virginia Beach, VA l Nov. 2011– Presentation at SPS – Houston, TX l Jan – Technical/Design Review Meeting– Washington, DC l Mar, 2012 – Presentation at ShipTech 2012 – Biloxi, MS l Apr –Final Team Meeting– Washington, DC