Beneficial Use at Deer Island A Decade of Design and Implementation Presented by Walter Dinicola, P.E., and Wendell Mears Anchor QEA, LLC George Ramseur.

Slides:



Advertisements
Similar presentations
By: Richelle DeCuir Title 1 Wetlands Workshop January 15, 2004 Hi, Im Richelle DeCuir from CenLA. Im concerned because Louisiana supplies the largest port.
Advertisements

Managing Development in the Coastal Zone, Federal Policy II: Coastal Zone Management Act; Slide 29.1 Session Name: Managing Development in the Coastal.
UMR = Balance of Environment and Transportation 1. Pool # 8 - Environmental Management Project 2. Transportation Route – human habitation & settlement.
Civil Engineering Michael C. Applegate HQ AFSOC/CEV WETLANDS CONSTRUCTION AS MITIGATION.
Upper Providence Township Stormwater Management MS4 Program.
Post-Hurricane Ivan Emergency Habitat Restoration Larry E. Parson – U.S. Army Corps of Engineers, Mobile District Linda S. Lillycrop - U.S. Army Corps.
Restoring Environment- Maintaining Infrastructure; Tradeoffs for Long Term Sustainability Bob Stokes President Galveston Bay Foundation
The Coastal Wetlands Planning, Protection and Restoration Act Presentation for the National Science Teachers Association Meeting New Orleans, LA November.
What is a Watershed? A watershed is the area of land where all water drains to a common body of water such as a river, lake or stream.
Coastal Zone Management.  Coastal Zone Management Act (1972) –Administered by Coastal Programs Division of NOAA –Covers over 22% of U.S. Land Area –Multi-purpose.
Alachua County Wetland Protection Regulations Alachua County Board of County Commissioners October 22, 2013.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Coastal Protection and Restoration Authority August 22, 2012 Deepwater Horizon.
The National Aquaculture Policy and The State Shellfish Initiative Perry Lund Shorelands and Environmental Assistance Program 17 November 2011.
Dredging, Disposal Management and Impacts on Lake Sediments US Army Corps of Engineers.
Q AVG US Army Corps of Engineers BUILDING STRONG ® Q AVG US Army Corps of Engineers BUILDING STRONG ® USACE Regional Sediment Management Program Linda.
April, 2008 Office of Coastal Restoration & Management PROJECT UPDATE Office of Coastal Restoration & Management PROJECT UPDATE.
Marine Corps Air Station Miramar
US Army Corps of Engineers BUILDING STRONG ® Emily Vuxton and Lauren Leuck U.S. Army Corps of Engineers Institute for Water Resources (IWR) Alexandria,
Coastal Texas Protection and Restoration Project
Integrated Ecosystem Restoration and Hurricane Protection: Louisiana’s Comprehensive Master Plan for a Sustainable Coast.
Summit #1 San Juan County Shoreline Master Program Update March 1 st, 2 nd, and 3 rd
US Army Corps of Engineers BUILDING STRONG ® Mouth of the Columbia River (MCR) Jetties Laura Hicks Chief, Planning and Project Management Branch Pacific.
Grays Harbor County Shoreline Master Program Update Our Heritage, Our Future Grays Harbor Master Builders January 9, 2012.
U.S. Department of the Interior Minerals Management Service Capital Hill Oceans Week Renee Orr Chief, Leasing Division Minerals Management Service Herndon,
David Preziosi, Executive Director Mississippi Heritage Trust.
CWPPRA New Orleans Land Bridge Shoreline Enhancement and Marsh Creation Project Project Kickoff Meeting April 15, 2015.
US Army Corps of Engineers BUILDING STRONG ® 2012 Alabama Water Resources Conference Orange Beach, Alabama September 6, 2012 Beneficial Use Opportunities.
NOAA Restoration Center Implementing the Gulf Regional Sediment Management Master Plan …responding to an ongoing emergency, improving responses to new.
Coastal Management Issues and Strategies: State and Municipal
Increase Atchafalaya Flow to Terrebonne Governor’s Advisory Commission Meeting 7 August 2013 committed to our coast.
Spokane River Riparian Enhancement Project at State Line.
Harbors Module NH1: Authorities and Policies. NH1 - 2 BU ILDING STRONG SM Student Learning Objectives Student will be able to:  Describe the Federal.
Marin Coastal Watersheds Permit Coordination Program Marin Resource Conservation District U.S.D.A. Natural Resources Conservation Service Sustainable Conservation.
CPRA UNO Meeting August 13, urplus Funds 2008 $300 Million Surplus Funds Act 3 of the nd Extraordinary Legislative Session provides for:
BUILDING STRONG SM Partnering and Coordination to Accomplish the Navigation Mission.
Federal and State Coastal Zone Management Laws Introduction to Coastal Management.
WEST EUGENE, OREGON Dedication of the Eastern Gateway and the West Eugene Wetlands Plan.
Coastal Restoration Updates September 10, 2007 Coastal Restoration Updates September 10, 2007 Louisiana Department of Natural Resources Louisiana Department.
Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.
Brownfields: Real Property, the expansion or redevelopment, or reuse of which may be complicated by the presence or potential presence of contamination.
Shore Protection Act (O.C.G.A , et seq.) Karl BurgessApril 5, 2011 Photo of Choice.
A World of Solutions North Topsail Beach Shoreline Protection Project Phase 1 – New River Inlet Channel Realignment & Beach Restoration NC Water Resources.
Alternative Sediment Remediation Authorities to CERCLA: Elizabeth River Demonstration Robert Engler Moffatt & Nichol),
US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers Mobile District General Permit for Living Shorelines in Alabama and Mississippi.
Kitsap County Department of Community Development Updating Kitsap County’s Shoreline Master Program (SMP) – process overview, public outreach, involvement.
A Pivotal Moment for Leaders Across the Gulf Coast States and Connected Communities Throughout the Country.
Oyster Advisory Commission October 3, 2012 Deepwater Horizon.
NOAA RESTORATION CENTER The NOAA RC seeks to make the process of regulatory review and permitting of environmentally beneficial habitat restoration projects.
Welcome to the Salt Marsh One of the most productive places on Earth.
July 20, 2011 Coastal Protection and Restoration Authority Deepwater Horizon Early Restoration.
San Francisco Ocean Beach-Great Highway Erosion Control Project.
The Science and Policy of Louisiana Coastal Ecosystem Restoration.
Watershed Stewardship Program Status of Marin County Public Works Watershed Program 11/7/08 11/7/08.
Prepared for: Prepared by: Identifying and Constructing a Dredged Material Placement Site while Protecting a Unique Coastal Freshwater Marsh October 2012.
US Army Corps of Engineers BUILDING STRONG ® Mississippi Coastal Improvements Program (MsCIP) “Comprehensive Barrier Island Restoration Plan” PIANC 2012.
1 Cameron Davis Senior Advisor to the Administrator, U.S. EPA Commission for Environmental Cooperation Joint Public Advisory Committee Public Forum on.
US Army Corps of Engineers BUILDING STRONG ® ENGINEERING WITH NATURE “ Beneficially Integrating Engineering and Natural Systems” PIANC 2012 Dredging Conference.
Department of Environmental Quality Coastal Habitat Protection Plan (CHPP) 2 Department of Environmental Quality Environmental Management Commission.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
The Jordan Cove Pacific Connector Gas Pipeline and Terminal.
Wetlands Workshop Presented by Em LeBlanc. Let’s go on a Field Trip!
 Clean Water Act 404 permit  Ohio EPA Division of Surface Water 401 water quality certification  Ohio Revised Code 6111 – Placement of dredged materials.
Beneficial Use of Dredge Materials: Introduction to Dredging and Policy J. Bailey Smith US Army Corps of Engineers April 4, 2011.
Healthy Coastal Ecosystems Preparing Your Coast. Fortifying the Coast  With shorelines under assault from rising seas, an acidifying ocean, and increasing.
Back River Flooding and Shoaling Citizens Committee Back River Flooding and Shoaling Citizens Committee August 15, 2007.
Upper St. Johns River Basin Project US Army Corps of Engineers A joint project between the St. Johns River Water Management District and the Jacksonville.
Ecology and environment, inc. ecology and environment, inc. International Specialists in the Environment Georganna B. Collins, International.
R. E. Randall Center for Dredging Studies
BOSTON HARBOR DEEP DRAFT IMPROVEMENT PROJECT
Presentation transcript:

Beneficial Use at Deer Island A Decade of Design and Implementation Presented by Walter Dinicola, P.E., and Wendell Mears Anchor QEA, LLC George Ramseur Mississippi Department of Marine Resources October 23, 2012

Presentation Outline Deer Island Background –Location and History –Habitat and Structure Beneficial Use (BU) –History of BU Program and Law –State of Mississippi BU Master Plan Deer Island Marsh Restoration Project –Mississippi Department of Marine Resources (DMR) –U.S. Army Corps of Engineers (Corps) –Port of Gulfport (Port) Future of BU at Deer Island and in Mississippi

Location and History Harrison and Jackson County, off the coast of Biloxi Remnant of nearshore area Native American population Europeans arrive in early 1700s Farming and fishing communities established Last residents left in 1969, following Hurricane Camille Purchased by the State in 2003 as part of the Coastal and Estuarine Land Conservation Program

Habitat and Structure Variety of habitats, from sandy beaches to marshy interior Vast expanses of pine trees inhabited the island Habitat severely damaged by tropical storms Tree loss and lack of fires encouraged brush and shrubs to spread Decaying root structure provides an erosion pathway

Deer Island – Northern Shoreline

Habitat and Structure Land loss estimated at 2 acres per year Island has decreased approximately 30% to 50% since the mid-1800s Eastern portion, “Little Deer,” is not visible at low tide

History of BU Program 2001– Corps and DMR identify potential BU sites 2002 – DMR develops the Long-Term Comprehensive Master Plan for Beneficial Uses of Dredged Material along Coastal Mississippi –Deer Island identified as a pilot project for future BU sites 2008 –Beneficial Users Group (BUG) formed –State and federal agencies, co-facilitated by DMR and the Corps, Mobile District –Private stakeholders (e.g., local ports) 2010 –BUG recommends revised legislation –House Bill 1440 passed March 2010 – Coastal Wetlands Protection Act § , effective July 1, 2010

2010 BU Law Requires BU for materials dredged from wetland areas of Mississippi Applicable if over 2,500 cubic yards (cy) are removed for a project Exemptions –Projects conducted by an exempt governmental agency –Projects conducted under governmental grant or bond proceeds –Projects that remove 2,500 cy or less from a permitted wetland area

2011 BU Master Plan Update Guided by the DMR and BUG Mississippi Coastal Improvements Program (MsCIP) study quantified sediment transport rates in the Mississippi Sound Provides potential BU sites and concepts Outlines permitting regulations (state and federal) Provides sediment testing protocols –Based on Corps and USEPA guidance –Simplified analytical, toxicity, and chemical testing 10-day bioassay tests Basic chemistry for metals, pesticides, and other chemicals of concern BUG initiates permitting actions for BU sites across the coast

Deer Island Marsh Creation Project 2001 – 2003 Components: –7- to 8-foot-high dike –Easterly wing dike –Flash board riser weirs –Offset to provide bayou Dredged material from Biloxi Lateral Channel Approximately 40 acres were filled with 365,000 cy of sediment

Pre-Katrina

Post-Katrina

Deer Island Restoration Project NOAA 2010 Restoration in the northeast corner of the island Deployed to protect approximately 800 feet of shoreline Oyster bags for stabilization and habitat Promotes intertidal circulation

Deer Island BU and Port of Gulfport 2012 Designed with DMR, Port, and Stakeholders Corps rebuilt existing cell under MsCIP Refill existing BU cell and construct additional expansion area BU cell –Open at the western end to encourage circulation and habitat development –Can be expanded for additional material –Mimics the historic 1850s footprint –Intertidal plant species –Chenier for nesting

Port of Gulfport – 2012 Restoration

Deer Island Plan View

Deer Island Beneficial Use Construction 2012

Hurricane Impacts during Construction

Future Deer Island and the BU Program Restore 1850s footprint –1.1 million cy in place needed for restoration Enhance habitats Dampen coastal storms Enhance and protect MS coastal resources into the future by conserving out sediments QUESTIONS?