Bob Morse, Univ of Wisconsin WBS 1.2---Implementation Berkeley Meeting Mar 19-23, 2005 Logistics, Drilling, Deployment.

Slides:



Advertisements
Similar presentations
NSF Baseline Review February 10-12, 2004 Optical Module Production Phil Robl Physical Sciences Laboratory.
Advertisements

Reliability Software1 Reliability Software Minimum requirements & Best practices Frank Macedo - FERC Technical Conference July 14, 2004.
Steven Chase 1, Yaw Adu-Gyamfi 2 and Paul Fuchs 3 1&2 Department of Civil Engineering, University of Virginia 3 Fuchs Consulting Inc.
© 2014 wheresjenny.com Dock management DOCK MANAGEMENT.
Network Design and Implementation
11 Heating System Operation and Diagnosis.
EDGE™ Final Project Plan P09701 – Corning Tropel LightGage™ Metrology System Matthew Bradley (ME) Images Courtesy of Corning Tropel.
Wireless Data Acquisition for SAE Car Project by: J.P. Haberkorn & Jon Trainor Advised by: Mr. Steven Gutschlag.
Water | Slide 1 of 16 January 2006 Water for Pharmaceutical Use Part 4: Commissioning, Qualification and validation Supplementary Training Modules on Good.
1 Customer Network Operations Center. 2 Agenda Overview Benefits Value Additional Services Questions Monitoring Options.
Source One Network Solutions with Corporate Headquarters based in Fitchburg, Wisconsin specializes in providing multi- location clients, with nationwide.
ISM Chemical Group Winter Conference New Orleans Thomas A. Cook American River International February ARI 2009.
Calendar Browser is a groupware used for booking all kinds of resources within an organization. The software is totally integrated in Outlook. Calendar.
The Smart Pumper TM enables you to create an Automated Smart Field today with One Device Patented Precision Pump Control based on real time fluid level.
Sebastian Böser Acoustic test setup at south pole IceCube Collaboration Meeting, Berkeley, March 2005.
Software and hardware solution for remote vehicle monitoring based on GLONASS/GPS navigation.
A Brief Overview Midwest COOLING TOWERS, INC. A Full Checklist of Products & Services for Your Cooling Tower Project Quality Service Integrity Value Quality.
EXA3000/2200 Product Champion Report July 25, 2003.
“web to wireless” Technology. A LEADER IN web to wireless ASSET MANAGEMENT ROM Communications Inc.
This presentation is the property of Paradigm Information Systems It is confidential to the intended recipient for the purpose of evaluating FMS Any other.
November 24, 2004 Rolf Nahnhauer1 PROJECT : IceCube Digital Optical Module Production at DESY Zeuthen.
Jeff LaDouce Director, NWS Pacific Region. Pacific Region AOR.
21/01/02 - ECAL Cooling - Arnaud Hormiere ST/CV 1 Development of ECAL COOLING PLANT Application to a Super Module.
Enhanced Hot Water Drill Season Drill Operations Overview Berkeley Meeting March 19-23, 2005.
Dec 2, 2003Tom Gaisser IceTop freeze tests Interim report from South Pole December 2, 2003.
WSNTG Annual Conference 8 th September 2005 WSNTG 9 th Annual Conference “Water Services Strategic Plans – Fact or Fiction”
High Energy - Engineering Working Group IceCube PY8 Spring Collaboration Meeting Apr 29, 2009 Jim Baccus.
July 26, 2014 Refrigeration Subcommittee Proposed Revision of Refrigeration Provisional Data Requirements.
Software Project Management By Deepika Chaudhary.
Viking Pump Flow Manager - Phase 2 Senior Design May
Communications and Networking Testing Schedule Tim Krout.
ENTC-489 Embedded Real Time Software Development Embedded Real Time Software Development Week 11 Design Examples.
Karsten Heeger, Univ. of Wisconsin UW, June 3, 2010 The DM-Ice Test Detector Detector Concept Mechanical Assembly Vessel Options Logistics Considerations.
Nov 30, 2003Tom Gaisser The IceTop component of IceCube Perspective from the South Pole.
The 2009 Deployment Tour Matthew Newcomb. The hole shrinks by 15 cm on the diameter every 24 hours A DOM requires at least 45 cm on the diameter or it.
1 – Commercial Technologies for Maintenance Activities Heat Treat Lean Cell Optimizing Maintenance Processes Tony Haynes – Program Manager.
INGAS SPA2 Meeting, Regensburg, October 13 th 2011 INGAS INtegrated GAS Powertrain 1 SPA2 Meeting Regensburg, Month 37, Turbo DI CNG Engine Alois Fürhapter,
Calibrating the first four IceCube strings Kurt Woschnagg, UCB L3 Detector Characterization IceCube Collaboration Meeting, Bartol, March 2004.
Science Advisory Committee March 30, 2006 Jim Yeck IceCube Project Director IceCube Construction Progress.
Utility Engineers, PC.  Generation  Transmission  Distribution.
Improving QoC in deliveries in public sector hospitals Approaches to Measuring Quality in Bihar.
Calibrations Accomplishments in PY03 Plans for PY04 Kurt Woschnagg, UCB L3 lead – Detector Characterization.
Chapter 12 The Network Development Life Cycle
IceCube Dust Loggers Kurt Woschnagg, Ryan Bay Physics Department, UC Berkeley Instrumentation Session IceCube Collaboration Meeting Bartol, March 2004.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
Automotive Heating and Air Conditioning CHAPTER Automotive Heating and Air Conditioning, 7e James D. Halderman | Tom Birch SEVENTH EDITION Copyright ©
Parks & Recreation Service Delivery Model Review Progress Report #1 City of Pitt Meadows Council January 19,
© 2013 National Ecological Observatory Network, Inc. ALL RIGHTS RESERVED. UPDATE ON THE STATE OF NEON AND THE OPERATIONS AT TOOLIK FIELD STATION Faustine.
TGYDGL09 Project DEPLOYABLE RAPID DIAGNOSTIC LABORATORY MOBIOCHEM Ltd.
Josh Stein 29-Apr-08 Undulator Controls Undulator Controls Status Update Josh Stein LCLS Undulator Controls CAM/TL.
Deployment Monitoring & Drill Logging (offline) at Pole Kurt Woschnagg IceCube collaboration meeting, Berkeley, March 2005.
KM3NeT deployment aspects Transportation – Deployment – Connection - Calibration Spyridon Koutsoukos.
Fieldbus Foundation General Assembly 2008 Project Planning and Execution Mike Downey Jacobs Engineering.
Status of Detector Characterization a.k.a. Calibration & Monitoring Project Year 2 objectives ( → Mar ‘04) 1. Calibration plan (first draft in March.
MUSE Task 5 Design and Construction of a Liquid Hydrogen Target.
Agenda Ej Lister – President & CEO – STOnavigator™ inc.
Karsten Heeger, Univ. of Wisconsin UW, June 3, 2010 The DM-Ice Test Detector Detector Concept Mechanical Assembly Vessel Options Logistics Considerations.
Fall 2006P7305: Freshman Practicum AM Receiver P7305: Learning Module for EE Freshman Practicum Chris Urban: Lead Engineer Hans-Christian Rotmann: Project.
HMS Status Steven Lassiter Jan 20, 2017.
CTIO Weather Station renewal
Special Device Review (Device Name)
THERMAL MODELING AND INSIGHTS
Strategy for Drilling IceCube BoreHoles
CTIO Weather Station renewal
Fluid Flow and Bernoulli’s Equation
Do Now Heading: Speed and Velocity
Meeting Overview Slides
Do Now Heading: Speed and Velocity
Chapter RESOURCE ACCESS AND DEVELOPMENT
Presentation transcript:

Bob Morse, Univ of Wisconsin WBS Implementation Berkeley Meeting Mar 19-23, 2005 Logistics, Drilling, Deployment

Mar 19-23, 2005 Berkeley 2 Implementation-Introduction Field Season Strategic Planning Logistics—Terry Hannaford Drilling—Alan Elcheikh, Jeff Cherwinka Installation---Tom Ham Counting House Operations Liaison---NSF, RPSC Training of Seasonal Drillers, Installers Training Platforms—PSL (Madison)

Mar 19-23, 2005 Berkeley 3 Drill Improvements —PSL Work Plan Plans for getting there Issues People Resources Testing and training Organization Schedule Stay focused on goals

Mar 19-23, 2005 Berkeley 4 Goals for Set up as early as possible up to Dec 10 7 week drill/deploy period (Dec11, Jan 28) Target drill speed 48 hrs/hole, including firn Target deploy speed 24 hrs/hole Use both towers to leapfrog 2 strings per week Drill and deploy strings

Mar 19-23, 2005 Berkeley 5 Drill performance issues Speed limitations (deep drill and firn) Second tower (shipped) New crescent Drill control software Set up and hole-to-hole move Fuel delivery systems Generators

Mar 19-23, 2005 Berkeley 6 Drill reliability issues Motor drives and controls Drill supply hose Flow, temperature and pressures sensors Heaters Condensate pumps E-stop false events Weight stack Load cells Communication networks Reels and reel brakes

Mar 19-23, 2005 Berkeley 7 Personnel Now: Alan Elcheikh Jeff Cherwinka Terry Matt Mark Thoma Lee Greenler Brian Pechan Farshid Feyzi Jack Ambuel Ted Shultz Chuck Rentmeesters Harold Mattison Carl Baumann Phil Robl Robin Bolsey Dave Pernic Alan Rogers Dave Scott Jim Koehler Terry Hannaford Tom Ham Soon Dennis Duling New programmer Drillers Outside help Ice-water interface modeling UNICO solutions review Software assessment Bob Morse’s group Newt Ganugapati Varun Gopalakrishna Anupam Singh Students: Peter Hoeft Scott Haman Terry Benson Brian White Aaron Kurth

Mar 19-23, 2005 Berkeley 8 Resources Full access to PSL shop and staff EHWD test area is still available EHWD test equipment 250 ft deep hole for hose test

Mar 19-23, 2005 Berkeley 9 Testing and Training Setting up software development and testing facility at PSL Setting up heater, pump, control and sensor facility at PSL Set up communication network for above Will use above for drill and repair training for drill crew May move to MDS style unit in future

Mar 19-23, 2005 Berkeley 10 Organization Build teams based on focus areas (first person leads team) 1. Drives, UNICOs, Motors: MT, TS, PR, TM (consultant) 2. E-stop, Network, Comm: TM, HM, PR, MT 3. Heaters, Condensate, Fuel, Switches & Sensors: JC, RB, CB, DD 4. Pumps, Sensors: BP, JC, RB 5. Software, Operations (simulator): HM, CR, JA, TS, AE, VG,AS, new hire,drillers 6. Speed Limit, Thermal, Dynamics: LG, JC, RM, TS,NG (consultant) 7. Drill Head, Weights, Nozzle, Sensors: JA, BP, LG, MT,DP 8. Procedures (SOP), Set Up: AE, RB, T Ham 9. Reels: BP, LG, JC,DP,CB,PR 10. Cables: PR,TM,JA 11. Hose, TOS, Crescent: JC, BP, AR,TB 12. Firn Drill: LG, DP,JC,AK 13. Training/testing: FF,RB,THam,JC,AE,drillers 14. Documents, Drawings: AR,TM,PR

Mar 19-23, 2005 Berkeley 11 Schedule We have started work already Must ship all items so they get to SP when it opens Organize shipments so parts are easily found We have about 6 months--must be very careful on what we do

Mar 19-23, 2005 Berkeley 12 Stay focused on goals Priorities: –Thing we must do1 –Things we should do2 –Things that would be nice3 Eliminate dependencies among tasks Keep an eye on how long it takes to do here Keep another eye on how long it takes to implement at the pole Keep both eyes on drilling 12 holes

Mar 19-23, 2005 Berkeley 13 Drill Logging and Analysis

Mar 19-23, 2005 Berkeley 14 Implementation--Introduction Layout-surveying Pilot holes—4” coring drill Firn Drill---down to 60 meters—water pools HW Drilling—straightness, depth, logging String Deployment—depth, location, logging Freeze-In—4-5 day monitoring-Counting House Data Management—drillers, deployers Off-line—real-time analysis, Pole, Madison

Mar 19-23, 2005 Berkeley 15 Drilling Data Drill Operations: depth, calipers, theta, vital parameters Data updates at rate of 4 Hz (250 ms). Data-Bridge—between drill net and SP-net. With updates every 5 minutes—1200 updates Drill Monitoring: Off-line, Real-Time Pole Monitoring---full analysis and logging Madison Monitoring—full analysis and logging as the satellite permits.

Mar 19-23, 2005 Berkeley 16 Off-line Real-Time Analysis At South Pole and Madison Tension (cable and drill-head) Depth (from winch payout and pressure) Hole Diameter—Calipers Drill-Angle—Straightness, Theta Logging X-Y or “birds-eye” plots

Mar 19-23, 2005 Berkeley 17

Mar 19-23, 2005 Berkeley 18 Hole # 1 ( 21) First attempt at hole drilling

Mar 19-23, 2005 Berkeley 19 HOLE 1

Mar 19-23, 2005 Berkeley 20 HOLE 1

Mar 19-23, 2005 Berkeley 21 HOLE 1

Mar 19-23, 2005 Berkeley 22 HOLE 1

Mar 19-23, 2005 Berkeley 23 Hole #1 Summary 22 hrs—large tilt angle, buried drill? hrs—buoyant drill, buried drill, lost nozzle? 40 hrs—buried drill, lost part of weights 43 hrs—lost additional part of weight-stack 45 hours buried drill hours, drill difficult to steer. Difficulty controlling hole diameter

Mar 19-23, 2005 Berkeley 24 Hole #2 (21-A) Move tower by about 8 meters Make 2 nd attempt at hole drilling

Mar 19-23, 2005 Berkeley 25 HOLE 2

Mar 19-23, 2005 Berkeley 26 HOLE 2

Mar 19-23, 2005 Berkeley 27 HOLE 2

Mar 19-23, 2005 Berkeley 28 HOLE 2

Mar 19-23, 2005 Berkeley 29 Hole #2 Summary More even drilling rate Better control of drill straightness Straightness—diameter correlation?

Mar 19-23, 2005 Berkeley 30 Drill Oscillations Lee Greenler’s talk

Mar 19-23, 2005 Berkeley 31 HOLE 2

Mar 19-23, 2005 Berkeley 32 HOLE 2

Mar 19-23, 2005 Berkeley 33 HOLE 2

Mar 19-23, 2005 Berkeley 34 Drill Oscillations Demonstrates need for fast-response instruments like drill load-cells, and cable/winch load-cells. Possible need for additional instruments like accelerometers to actually determine drillhead’s instantaneous velocity and position.

Mar 19-23, 2005 Berkeley 35 Hole #2 Logging –X-Y Plot

Mar 19-23, 2005 Berkeley 36 HOLE 2

Mar 19-23, 2005 Berkeley 37 HOLE 2

Mar 19-23, 2005 Berkeley 38 Deployment Kurt Woschnagg’s talk

Mar 19-23, 2005 Berkeley 39