Ƒ PM PM Field Planning Model Communicating Reservoirs Aquifer Influx Well Flow Facilities Re-completions Drilling Optimization OPTIMIZE PRODUCTION FIND.

Slides:



Advertisements
Similar presentations
Empirical Factors Leading to a Good Fractured Reservoir Early recognition of fractures High fracture intensity & good connections Good interaction between.
Advertisements

SPE Getting the Most out of Networked Drillstring Petersen, Sui, Frøyen, Nybø Center for Integrated Operations in the Petroleum Industry & SINTEF.
Defining Decision Support System
Bentley Water and Wastewater 2004 Edition. Rule-based annotation Cell placement with annotation Bulk assignment of attribute to like elements Automatic.
DESIGNING A WATERFLOOD Designing a water flood involves both technical and economic consideration. Economic analysis are based on estimates of water.
Hydrological information systems Svein Taksdal Head of section, Section for Hydroinformatics Hydrology department Norwegian Water Resources and Energy.
P3/Spider Project Comparison. Spider Project Introduction b Spider Project is a professional project management package, the most popular in Russia. It.
* Formed in 2003, Payzone Surveying has progressed from developing the original v1.1.1 of our software package and running extensive field trials. Formed.
Seismic Stratigraphy EPS 444
Numerical modeling example A simple s teel reheat furnace model – pg Reheat furnace Hot steel slabRolling mill Final product.
PE RELPERM ® Presentation Developed by Petroemertat Co. Software Engineering Division
PC Based Reservoir Analysis System Allows Quick Decision on E&P Well Plans for Black Widow Prospect J.L. Buchwalter Gemini Solutions, Inc. T.M. Campbell.
2010 SPWLA Topical Conference
Fluidyn FLOWCOAST FLOOIL 3D Fluid Dynamics Model to Simulate Oil slick movement in coastal waters or rivers FLOOIL.
INTEGRATED PRODUCTION SERVICES Wellhead Management from Day 1 December 11, 2001.
Kinematic Routing Model and its Parameters Definition.
Hydrologic Characterization of Fractured Rocks for DFN Models.
OIL RECOVERY MECHANISMS AND THE MATERIAL BALANCE EQUATION
BP Workshop July 17, 2001 GEMINI Geo-Engineering Modeling through INternet Informatics by John Victorine and Lynn Watney Kansas Geological Survey Lawrence,
Introduction to Effective Permeability and Relative Permeability
SCC & Leica  Import total station survey, GPS, traverse, levelling and GIS data direct from all Leica instruments.  In built Grid Inquest for GPS reduction.
Combined Geological Modelling and Flow Simulation J. Florian Wellmann, Lynn Reid, Klaus Regenauer-Lieb and the Western Australian Geothermal Centre of.
Geologic Analysis of Naturally Fractured Reservoirs 2nd Edition, R. A
Page - 1 Rocketdyne Propulsion & Power Role of EASY5 in Integrated Product Development Frank Gombos Boeing Canoga Park, CA.
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
GasPipe GasPipe is an easy to use package used for generating IPR curves for all nodes and components in a gas gathering system. The network consists.
State of Connecticut Core-CT Project Query 4 hrs Updated 1/21/2011.
Marginal Field Development Advances in 3D Geological Modeling: How it can help?
Gas Buildup Analysis GasBU uses standard buildup tests from individual wells and performs a buildup analysis using various methods. The program allows.
Introduction to BIM BIM Curriculum 01.
Optimizing In Fill Well Drilling - Wamsutter Field
Sedimentology & Stratigraphy:
Relex Reliability Software “the intuitive solution
Maraco Inc What Is GasPal? 2.
OIL RECOVERY MECHANISMS AND THE MATERIAL BALANCE EQUATION
Workflow for Finding Bypassed Reserves in Mature Assets  Real Time Integration of Simulation, Seismic Interpretation, and Geophysics  Best Answers Possible.
© 2013 Fluor. All Rights Reserved. Process Data in SmartPlant Instrumentation Fluor’s SmartPlant Implementation Initiative By: John Dressel.
What would you do if you have to produce oil from multiple zones? PLAN 1PLAN 2 ① ② ③.
Modelling Unconventional Wells with Resolve and Reveal Juan Biörklund (Gauloise Energía) and Georg Ziegler (Wintershall Holding)
A decision services company dedicated to assist clients with the application of optimization technologies, and conceptual study techniques Upstream Services.
Early Offshore Petroleum Development Cost Estimates Using GIS Narmina Lovely, GEOG 596A Advisor: Patrick Kennelly.
Walt King, Petroleum Engineer1 PTTC Simulation Users Group An Overview of the Exodus Simulation Computer Program October 23, 2003 Presented by Walt King,
Flow Planner Presentation Selected Case Studies. Internet / Intranet based Process Engineering Flow Planner Features Analyze an unlimited number of flow.
Integration of Production Analysis and Rate-Time Analysis via Parametric Correlations — Montney Shale Case Histories Yohanes ASKABE Department of Petroleum.
Michael Fay VP, Software Development. Well Production Forecasting Requirements For efficiency, the method should be simple (e.g. no simulation or complex.
1 of 30 GIS for Reservoir Management: Estimating Original Gas In Place Jeffrey Vu, M.GIS Candidate Dr. Patrick Kennelly, Advisor.
Wytch Farm Field Development Project
Rock & Fluid Properties
Tom Beebe Project Manager
Paulus obey DAPCEP 3/29/14. A petroleum engineer is involved in nearly all of the stages of oil and gas field evaluation, development and production.
Res A Performed By Gemini Solutions, Inc. May 2001.
Independent, integrated thinking.
CE 3354 Engineering Hydrology Lecture 21: Groundwater Hydrology Concepts – Part 1 1.
The Islamic University of Gaza Faculty of Engineering Civil Engineering Department EENV 5326 Groundwater Modeling.
1 1 Presenter / date if required Independent, integrated thinking.
Arc Hydro groundwater data model: a data model for groundwater systems within ArcGIS AWRA Specialty Conference Geographic Information Systems (GIS) and.
3-D & 4-D GIS for Solving Field Development Problems John D. Grace, Ph.D. Earth Science Associates
MATURE FIELDS LTRO CAPABILITY POWERED BY POSEIDON A LEAP ENERGY TECHNOLOGY PLATFORM.
Oil and Gas Technology Program Oil and Gas Technology Program PTRT 2432 Artificial Lift Green Book Chapter 1 Planning an Artificial Lift Program.
Dynamics Seminar Section 7 Batch Reactors John Edwards, P&I Design Ltd
Chapter 5 Pressure Transient Testing (I)
Gas Properties & PVT Tests
Houston, 4th & 5th February 2003
A RESERVOIR MANAGEMENT REVOLUTION
Introduction to Effective Permeability and Relative Permeability
Gas Condensate Blockage
Gas Condensate Blockage
Relative permeability
Presentation transcript:

ƒ PM PM Field Planning Model Communicating Reservoirs Aquifer Influx Well Flow Facilities Re-completions Drilling Optimization OPTIMIZE PRODUCTION FIND THE UPSIDE

FPM is a revolutionary concept in field depletion planning. Driven by material balance and diffusivity you can determine well deliverability to multiple pressure systems with optimal compressor or separator loading. FPM enables petroleum engineers to optimize field production. In the past, field optimization was done in parts: the reservoir, wells and facilities. Efforts to combine these into a single model have previously failed due to prohibitive computation time, unmanageable data volumes and inadequate model integrity. FPM has been designed to address these deficiencies by: Minimising model parameters Maximizing computational efficiency Direct access to Database. FPM minimizes model parameters by reducing the number of grids and using pseudo relative permeability curves. FPM improves computational efficiency by using equations not tables, RAM not hard disk and implicit not explicit formulations. FPM copes with large volumes of data by automatic history matching, direct access to database, automatic work-overs and infill well selection. In field management FPM assists the operations engineer by providing:  Predictions derived from a high fidelity history match of oil, water, gas and pressure of the reservoir, wells, facilities and transmission systems.  Optimization of production by selecting optimum work-overs and optimum infill well locations within the facility limitations.  Rapid ‘what if’ cases for a wide range of parameters ranging from completion options to oil gravity limitations.  Simple spreadsheet reports of wells, reservoirs or field production that can readily be integrated in corporate economic and planning tools.

FPM has the following advantages:  Easy data input with direct links to production and digital map databases.  As an advanced material balance simulator it can handle a very large number of reservoirs and wells.  Aquifer models allow the engineer to adjust aquifer strength by altering aquifer size, geometry, permeability and compressibility.  Allows enhanced well test matching.  Report generation in Excel or text formats. Do you know where your oil is? FPM can generate plots to show the remaining oil in place before and after a prediction run. Asset A Team Asset B Team Asset C Team Asset D Team Geology & Geophysics Reservoir Engineering Facilities Engineering Operations Engineering Planning Five Fields with 660 Wells, 540 Reservoirs, thousands of completions, 50 Years of History and 18 Years of Prediction in less than 2 MINUTES! End of HistoryEnd of Prediction

HOW DOES IT WORK? The Reservoir A reservoir can be modelled as one or multiple cells. Any cell or reservoir can be connected to any other by assigning a transmissibility factor. The model can range from 1-Phase and 1-D to 3-Phase and 3-D. Aquifers can be attached to any reservoir or group of reservoirs FPM uses 3-Phase relative permeability to generate pseudo curves for individual wells and reservoir wide curves for infill wells. In the definition of reservoir wide curves the critical water saturation is uniquely defined as a function of dip of formation, distance to contact, viscosity, permeability and gravity factor. The last can range from 0 for bottom water influx to 1 for gravity segregation. Field or Well specific Pseudo Permeability Curves can be used for History Matching or Predictions L x  Gravity Factor = G Swc well = f (  x,    w     w, G 

In an effort to determine the reliability of FPM its results were compared with those of a finite difference model. The single cell model was matched to the fine grid model. The forecasts of both models are very similar. It may be difficult to argue which is more reliable. This question is more pertinent in a real case where FPM will normally generate a higher fidelity match. Finite Differences Prediction ModelFPM Prediction Model

WELL HISTORY MATCHING History matching is accomplished by adjusting the critical water saturation, the slope of Krg, Krw, Kro and the Dietz critical factor. This will allow a more precise fit to history than a reservoir wide curve. This is most important for existing wells continuing into Prediction time. Typical Well Match (Total Fluid) Reservoir History Match (Water) Calculated Values Measured Values

Forecasting from existing wells utilizes pseudo well curves. New wells require either reservoir wide curves or pseudo well characteristics calculated from FPM generated maps. FPM calculates reservoir top, net sand thickness, porosity, water saturation, permeability and pseudo-perm functions at each node over a fine grid (generally 50m). Contoured cell polygons of any of the above parameters can be interactively displayed by reservoir or field. They are available in two or three dimensional graphs.

From RESERVOIR to EXPORT PIPELINE FPM has the ability to model multiphase lift in the well-bore with any of the 19 industry standard correlations. Multiple completions including mono-bore, single non-selective and selective, dual non- selective and selective can be modelled. Cross- flow is detected in all completions. The FPM facility module includes flow-lines, manifolds, water/gas knock-outs, separators, compressors and pipelines. This is generally where the greatest pressure losses occur. Forecasting without modelling the facilities should only be considered as an academic exercise. Multiple stations and fields can be simulated with a detailed surface network of wells, flow stations and pipelines. Flowlines Manifolds Water/Gas Knock-Out Separators Compressors Pipelines Flowlines Manifolds Water/Gas Knock-Out Separators Compressors Pipelines Gas Lift High & Low Pressure Optimization Gas Lift High & Low Pressure Optimization

WELL WORK-OVERS Once a well has reached its specified limits in any reservoir, FPM will automatically perform a work-over based on defined criteria. FPM will prioritise wells “waiting for work- over” to select the best candidate to fill the production facility. Completion type, remaining reserve, oil rate, water cut and GOR are just some of the controls available. During a prediction FPM selects which reservoir is to be produced to minimize water and maximize oil production, plan work- overs and infill drilling. Prediction Start Existing Well with 3 sliding sleeves.

‘Prognosed’ Drilling Data can be imported from a mapping package such as Z-map or CPS-3 and read into FPM on a user-defined grid, usually 100 metres. A ‘Prognosed Well’ is created at each grid node. A prediction base case establishes work-overs for existing wells, facility modifications and a current drilling schedule. FPM ‘drills’ each prognosed well individually and calculates the incremental field recovery. This establishes which well has least interference and best facility path. The best wells can then be ranked. FPM has a ‘Drilling Manager’ that allows the intensive computer process to be accomplished for large fields in hours rather than days.

3D Visualization FPM allows the input of not only cell polygon outlines but also geologic mapping from Z-map or other formats from geophysical workstations. This allows 3D visualization of the reservoir and the spatial relationships of the reservoirs in a field. Further, the movement of oil- water contacts through time can be mapped to ascertain the encroachment of water to individual wells. 3D Reservoir Visualization Original Water/Oil Contact in the Reservoir A Well and it’s reservoirs

OPES International Petroleum Engineering Consultants Reservoir Engineering and Field-wide Simulation Field Planning and Optimization Reserve Reporting and Property Evaluation Well Test Planning and Analysis Production Geology Production Engineering Reserve Reporting and Property Evaluation Plan Of Development (POD) Development of Specialized Petroleum Engineering Software Training in Reservoir Engineering and Field Management Australia International House L17, 26 St George's Tce., Perth, Western Australia 6000 PO Box 6128, East Perth, WA Tel: Fax: Indonesia Setiabudi Atrium Suite #210, Jl. H.R. Rasuna Said Kav, 62 - Kuningan Jakarta Tel: Fax: