Variable Generation Subcommittee Michelle Mizumori WECC January 6, 2010.

Slides:



Advertisements
Similar presentations
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
Advertisements

Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
Strategic Planning Update For Board Meeting December 5, 2007.
WECC - Addressing Commercial Practices Ed Beck Chair, Market Interface Committee.
2007 Goals. Introduction Western Electricity Coordinating Council (WECC) will be primarily defined throughout the 2007 year by Electric Reliability.
WECC - Addressing Commercial Practices Ed Beck Chair, Market Interface Committee.
Renewable Proposals Made at October Board. Proposal 1 Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate.
Western Electricity Coordinating Council Identify, coordinate, and propose solutions to seams issues Participate, monitor and communicate the development.
Renewable Proposals Made at October Board. Proposal 1 Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate.
Loads and Resources Subcommittee Report Wally Gibson, NWPCC PCC Meeting June 10-11, 2010.
VGS-Planning Work Group (PWG) Activity Update to PCC Ann Finley PWG Liaison to PCC Metropolitan Water District of So. California June 9-11, 2010.
Gary Nolan Interchange Scheduling and Accounting Subcommittee Chair e-Tag Denial Issue Referred to Joint Guidance Committee.
Brenda Ambrosi Interchange Scheduling and Accounting Subcommittee Chair e-Tag Denial Issue Referred to Joint Guidance Committee.
Heidi Pacini Staff Engineer Developing a Draft 2011 Study Program March 10, 2010 SWG Conference Call.
0 NERC PC Issues Update WECC PCC Meeting NERC PC Issues Update WECC PCC Meeting John Simpson, Reliant Energy Planning Coordination Committee Albuquerque,
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Planning, optimization and regulatory issues
Reliability Challenges White Paper Victoria L. Ravenscroft Senior Policy Analyst W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Energy Storage in California’s Grid of the Future Don Liddell, Douglass & Liddell Co-Founder and General Counsel, California Energy Storage Alliance ​
Aidan Tuohy Technical Leader/Project Manager, EPRI ERCOT Emerging Technology Working Group (ETWG) 09/24/2014 Transmission System Considerations for Integrating.
Variable Generation Subcommittee Update to PCC Ann Finley - VGS-PCC Liaison Metropolitan Water District of So. Cal October 7, 2014 Salt Lake City, Utah.
Electric Power Infrastructure: Status and Challenges for the Future Mark Lauby Director, Reliability Assessments and Performance Analysis.
Reliable Power Reliable Markets Reliable People Wind Developments in North America APEX Conference – Sydney, Australia October 14, 2008 Warren Frost, Vice.
Sixth Northwest Conservation & Electric Power Plan Discussion of Proposed Generating Resource Action Items Jeff King Northwest Power and Conservation Council.
GE Energy Asia Development Bank Wind Energy Grid Integration Workshop: Issues and Challenges for systems with high penetration of Wind Power Nicholas W.
Regional Technical Forum End-use Load Shape Business Case Project Project Initiation Meeting Portland, OR March 5, 2012.
1 The Tres Amigas SuperStation VLPGO November 2011.
WECC Market Interface Committee Update WSPP Spring 2008 Meeting April 8, 2008 Robert D. Schwermann MIC Chair.
Variable Generation Subcommittee Paul Arnold and Michelle Mizumori Northwest Wind Integration Forum Technical Work Group October 29, 2009.
Western Wind Integration Study Debbie Lew NREL. Goal To support multi-state interests in understanding the operating and cost impacts due to the variability.
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
1 Wind Integration Study Team (WIST) Report to the Northwest Wind Integration Forum Steering Committee January 6, 2010 Jeff Miller - ColumbiaGrid Rich.
1 Renewable Technology Working Group (RTWG) July 14, 2009 Henry Durrwachter.
Ann Finley VGS-PCC Liaison VGS Discussion March 25-26, 2014 Salt Lake City, Utah.
Western Wind and Solar Integration Study Debbie Lew National Renewable Energy Laboratory SWAT/CCPG Meeting Aug 22, 2007.
Business Practices Subcommittee Update Executive Committee Meeting February 18, 2014.
Joint Outreach Team Implementation Plan July 12, :30-11:30 a.m.
Long-Term Electricity Report 1 Susan Gray September 27, 2010.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 2009 Draft Resource Program Released: September 30, 2009 Accepting Comments until: November 30,
Integration of Variable Generation Task Force (IVGTF) & Emerging Issues Mark Lauby Manager, Reliability Assessments
Northwest Power and Conservation Council Action Plan Summary.
Integration of Variable Generation Task Force (IVGTF) Mark Lauby Manager, Reliability Assessments
Northwest Wind Integration Forum Policy Steering Committee Meeting January 6, 2010 WECC VGS--REC Impacts Work Team Update Paul F Arnold—VP ColumbiaGrid.
Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
1 Intermittency Analysis Project: 2010 Accelerated and 2020 Scenarios Dora Yen-Nakafuji, Commission Project Manager Kevin Porter, IAP Team Lead CEC PIER.
The Role of Energy Storage as a Renewable Integration Solution under a 50% RPS Joint California Energy Commission and California Public Utilities Commission.
2010 Work Plan Steering Committee January 29, 2010.
Project Tracking Update July 12, 2011 MOPC. 2 STEP List (Excel Spreadsheet) –Engineers enter technical data and analysis on upgrades –Used as a repository.
Eastern Wind Integration and Transmission Study David Corbus - Project Manager Matt Schuerger (Consultant) National Wind Technology Center NREL Golden,
1 Wind Integration Study Team (WIST) Report to the Northwest Wind Integration Forum Technical Work Group October 29, 2009 Jeff Miller - ColumbiaGrid Rich.
1. Non-Dispatchable Resources and EIS Market Carrie Simpson May 30,
Western Wind Integration Study May 23, Agenda 10:00am - Introductions 10:15 –Overview of study - NREL –Analysis to be conducted and examples of.
Future Expectations of TEPPC: Products, Users, and Values Maury Galbraith Presentation to TEPPC Review Task Force January 11,
RAWG Agenda Item LAR Data WECC Staff. Data Elements Generator information – Existing – Changes Monthly Peak Demand and Energy (actual year and.
Northwest Wind Integration Forum Technical Work Group Meeting October 29, 2009.
JJ Jamieson MIC Chair MIC 2015 GOALS March 24, 2015 SLC.
Ann Finley VGS-PCC Liaison VGS Discussion July 15-16, 2014 Salt Lake City, Utah.
TEPPC Review Task Force January 11, Purpose Advise and make recommendations on Future potential future generation and load balance Adequacy of the.
CREPC/WIRAB Meeting April 27, 2016 Salt Lake City, UT Thomas Carr Western Interstate Energy Board Evolution of Grid Planning in the West.
Interchange Scheduling & Accounting Subcommittee
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Reliability Assessment Committee Proposal TSS Meeting
MIC Committee Discussion
Integration of Variable Generation Task Force (IVGTF) & Emerging Issues Mark Lauby Manager, Reliability Assessments
Integration of Variable Generation Task Force (IVGTF)
Integration of Variable Generation Task Force (IVGTF): Status
Integration of Variable Generation Task Force (IVGTF)
MIC Committee Discussion
Presentation transcript:

Variable Generation Subcommittee Michelle Mizumori WECC January 6, 2010

Recent Activity ● Work Group meetings November ● Full VGS meeting December 1 ● Continuing discussion of VGS study

Marketing Work Group ActivityStatusNext Steps M1- Investigate Market Mechanisms for Delivery of Ancillary Services Outlining White Paper  Work team call  Create first draft of white paper M2 – Evaluate REC MarketCreating inventory of information and issues  Work team call  Outline and draft a white paper M3 – Product Code for Scheduling of Variable Resources Proposing MIC examine this issue  Discussion at January Joint Guidance Committee meeting M4 – NAESB ActivitiesRequest that MIC MIS NAESBWG notify the VGS MWG if any NAESB issues arise  N/A

Operating Work Group ActivityStatusNext Steps O1- Assessing Reserve Requirement Methodologies Continuing to compile existing reports/studies  Work team call  Develop refined action plan O2 – Generator Performance Standards Compiled Interconnection Guidelines – UK, Denmark, Australia, BC, Alberta, Hydro Quebec, etc.  Work team call  Group/summarize by topic, i.e., power factor, inertia, etc.?  Coordination w/ IVGTF O3 – Understanding Existing Flexibility Working on a new target date for initial inventory  Work team call  Creation of questionnaire? Explore existing capability & technical/financial/regulatory limitations or challenges to accessing flexibility O4 – Forecasting PracticesBuilding off of inventory created by Exeter Associates – forecast tools, data inputs, ramp predictor, timing, metrics, etc.  Work team call  Develop refined action plan  Add additional specifics based on discussions with relevant entities O5 – Quantify Benefits of Collaboration Working with NREL/PNNL to develop study plan  Study Plan

Planning Work Group ActivityStatusNext Steps P1- Participate in industry efforts on VG modeling Compiling information on current efforts  Work team call  Identify current participants in industry activities and identify gaps P2 – Review NERC IVGTF ReportIdentified members participating in activities. Coordinating through existing participation  Work team call  Continue to coordinate activities P3 – Transmission Capacity Assignment and Adequacy for accommodating integration of VG Compiling information on potential methodologies  Work team call  Work with TEPPC to coordinate assumptions  Meeting with LRS P4 – Standardizing and Validating Planning Criteria and Methodologies Literature review underway  Work team call  Develop recommendations and analysis of methodologies P5 – N/ACombined with P3  N/A P6 – Create Centralized Database on VG Information Working with LRS  Work team call  Survey of data available P7 – System Dynamic IssuesCreating prioritized list of dynamic studies that should be run  Work team call  Develop recommendations

Technology Work Group ActivityStatusNext Steps T1- Identify Performance Requirements for VG Compiled current North American requirements  Work team call  Outline issues with current and likely upcoming requirements T2 – Identify the Impact of Technology Cost Changes Identified technology subject matter experts  Work team call  Outline likely technology cost changes for solar and wind T3 – Identify Complementary Technologies Storage Inverters Communications and Measurement Smart Grid Created work teams  Work team calls  Recruit expertise especially in storage and communications  Outline issues with each technology type

VGS Study Scenario Does Balancing occur on a BA level? Is Congestion included? Scheduling of Conventional Generation Scheduling of variable generation: Scheduling of Load Scenario 1: Copper Sheet, full consolidation with no congestion No Intra-hour for all internal generators Scenario 2: TODAY – Balancing Authorities are separate, congestion exists and scheduling is hourly only. Yes Hourly Scenario 3: Balancing authority consolidation with congestion NoYes Intra-hour for all internal generators Scenario 4: Balancing Authorities are separate, congestion exists, but sub-hourly scheduling is allowed. Yes Dynamic Intra-hour Dynamic Intra-hour Dynamic Intra-hour

Questions Michelle Mizumori (360)