Variable Generation Subcommittee Michelle Mizumori WECC January 6, 2010
Recent Activity ● Work Group meetings November ● Full VGS meeting December 1 ● Continuing discussion of VGS study
Marketing Work Group ActivityStatusNext Steps M1- Investigate Market Mechanisms for Delivery of Ancillary Services Outlining White Paper Work team call Create first draft of white paper M2 – Evaluate REC MarketCreating inventory of information and issues Work team call Outline and draft a white paper M3 – Product Code for Scheduling of Variable Resources Proposing MIC examine this issue Discussion at January Joint Guidance Committee meeting M4 – NAESB ActivitiesRequest that MIC MIS NAESBWG notify the VGS MWG if any NAESB issues arise N/A
Operating Work Group ActivityStatusNext Steps O1- Assessing Reserve Requirement Methodologies Continuing to compile existing reports/studies Work team call Develop refined action plan O2 – Generator Performance Standards Compiled Interconnection Guidelines – UK, Denmark, Australia, BC, Alberta, Hydro Quebec, etc. Work team call Group/summarize by topic, i.e., power factor, inertia, etc.? Coordination w/ IVGTF O3 – Understanding Existing Flexibility Working on a new target date for initial inventory Work team call Creation of questionnaire? Explore existing capability & technical/financial/regulatory limitations or challenges to accessing flexibility O4 – Forecasting PracticesBuilding off of inventory created by Exeter Associates – forecast tools, data inputs, ramp predictor, timing, metrics, etc. Work team call Develop refined action plan Add additional specifics based on discussions with relevant entities O5 – Quantify Benefits of Collaboration Working with NREL/PNNL to develop study plan Study Plan
Planning Work Group ActivityStatusNext Steps P1- Participate in industry efforts on VG modeling Compiling information on current efforts Work team call Identify current participants in industry activities and identify gaps P2 – Review NERC IVGTF ReportIdentified members participating in activities. Coordinating through existing participation Work team call Continue to coordinate activities P3 – Transmission Capacity Assignment and Adequacy for accommodating integration of VG Compiling information on potential methodologies Work team call Work with TEPPC to coordinate assumptions Meeting with LRS P4 – Standardizing and Validating Planning Criteria and Methodologies Literature review underway Work team call Develop recommendations and analysis of methodologies P5 – N/ACombined with P3 N/A P6 – Create Centralized Database on VG Information Working with LRS Work team call Survey of data available P7 – System Dynamic IssuesCreating prioritized list of dynamic studies that should be run Work team call Develop recommendations
Technology Work Group ActivityStatusNext Steps T1- Identify Performance Requirements for VG Compiled current North American requirements Work team call Outline issues with current and likely upcoming requirements T2 – Identify the Impact of Technology Cost Changes Identified technology subject matter experts Work team call Outline likely technology cost changes for solar and wind T3 – Identify Complementary Technologies Storage Inverters Communications and Measurement Smart Grid Created work teams Work team calls Recruit expertise especially in storage and communications Outline issues with each technology type
VGS Study Scenario Does Balancing occur on a BA level? Is Congestion included? Scheduling of Conventional Generation Scheduling of variable generation: Scheduling of Load Scenario 1: Copper Sheet, full consolidation with no congestion No Intra-hour for all internal generators Scenario 2: TODAY – Balancing Authorities are separate, congestion exists and scheduling is hourly only. Yes Hourly Scenario 3: Balancing authority consolidation with congestion NoYes Intra-hour for all internal generators Scenario 4: Balancing Authorities are separate, congestion exists, but sub-hourly scheduling is allowed. Yes Dynamic Intra-hour Dynamic Intra-hour Dynamic Intra-hour
Questions Michelle Mizumori (360)