Status of Collaborative Team work on H.IDscheme, H.ID-RA and H.IRP Chiaki Ishikawa (TTC)

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0075r1 Submission January 2009 Jesse Walker, Intel CorporationSlide 1 JTC1 Ad Hoc January 2009 Agenda Date: Authors:
Advertisements

Doc.: IEEE /0510r1 Submission Apr 2015 Andrew Myles, CiscoSlide 1 IEEE 802 JTC1 statement for IEEE 802 EC review of subgroups 10 April 2015 Authors:
SC38 Liaison Report to SC32 at SC32 meeting, Oct 24-28, 2011 Crete Baba Piprani/Canada SC38  SC32 Liaison 1 ISO/IEC JTC1/SC32/WG2 N1599.
Doc.: IEEE /0194r0 Submission Jan 2015 Andrew Myles, CiscoSlide 1 IEEE 802 JTC1 SC closing report (Jan 2015) Date: Authors:
Doc.: IEEE /1454r7 Submission March 2013 IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process 20 March 2013 Haasz et al, IEEESlide.
Doc.: IEEE /0642r0 Submission May 2008 Jesse Walker, Intel CorporationSlide 1 IEEE JTC1 Ad Hoc Mid-Week Status May 2008 Date:
NGN Management Focus Group 2 November 2004 Dave Sidor Interim Chairman Nortel Networks Tel Fax
1 CJK9, Zhangjiajie, China NID-related activities in ITU-T Document number Zhangjiajia, China 8-10 April 2009 Hyoung Jun KIM, Jun Seob LEE
Doc.: IEEE /1341r0 Submission September 2011 Andrew Myles, CiscoSlide 1 JTC1 SC September Closing Report 22 Sept 2011 Authors: Meeting.
Slide 1 IEEE 802 Response to FDIS comments on IEEE 802.1AS 20 March 2014 Authors: NameCompanyPhone .
Minutes of the Meeting IoT WG GISFI #7 New Delhi, Dec 19-22,
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Cloud Computing in TTC Kazunori MATSUO, TTC Cloud Computing Advisory Group Document No: GSC16-PLEN-17.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 05 Mar 2012 Doc: Source: ETSI.
Doc.: IEEE /0765r0 Submission July 2005 Jesse Walker (Intel Corporation) Slide 1 Motion Move To form an IEEE Study Group to receive WLAN.
SC38 Liaison Report for SC32 meetings Gyeongju, Korea Baba Piprani Liaison Officer from SC32 to SC N2382.
1 CJK10, Beijing, China ORS Implementation using DNS, and Demonstration Document number Beijing, China 22 nd -24 th July 2009 Jong-Pyo Kim, Seung-Jai Yi.
ISO Process Summary for SEDRIS Dick Puk ISO/IEC SC24 SEDRIS Editor WG8 Meeting, October 1, 1999 ISO/IEC JTC1/SC24/WG8 N4.
Progress report for ISO/IEC DTR Metadata Mapping Procedure(MMP) October, 2012 Tae-Sul Seo and Sung-Joon Lim 1.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 1: Techniques and Developments Zhong Chen SC1 Chair
SC38-SC32 Liaison Report Berlin SC32 Plenary, Baba Piprani SC32 N2235 Dated: R1.
1 Status Report on CJK NGN Working Group China Communications Standards Association 9 th CJK meeting April 2009 HeyuanXu, Chairman of NGN-WG.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Steve Barclay, ATIS] [Joachim Koss, ETSI] Contribution to oneM2M-Cons#4, 28 Mar 2012.
Doc.: IEEE COEX-01/014r0 Submission July 2001 Jim Lansford, Mobilian, Tim Blaney, CommceptsSlide 1 IEEE 802 Wireless Coexistence TAG Proposal Jim Lansford.
Doc.: IEEE /0795r2 Submission July 2014 The China NB contributed a variation on the “usual comment” on IEEE China NB comment on
GISFI_SP_ GISIF#8, , March GISFI#8 Security & Privacy Working Group: Report Company:NEC Corporation Author(s):Anand R. Prasad, Chair.
Doc.: IEEE /0456r0 Submission April 2008 Jesse Walker, Intel CorporationSlide 1 Geneva JTC1/SC6 Liaison Report Date: Authors:
CJK Standards Collaboration - Brief overview of CJK NID WG HyoungJun Kim Telecommunications Technology Association.
Doc.: IEEE /0054r0 Submission March 2013 Mika Kasslin, NokiaSlide 1 TG1 Closing Report for March 2013 Notice: This document has been prepared.
International Telecommunication Union Results of the first FGFN meeting in Lulea Naotaka MORITA Chairman of FGFN 14 July 2009.
ISO/OMG Liaison ISO/IEC JTC 1/SC 32/WG 2 Washington D.C February 8-12 Thomas Culpepper 3M Health Information Systems Applied Technology Research.
T-MPLS Update IETF71 March 2008 Stewart Bryant
Doc.: IEEE Submission July 2006 Ho-In Jeon, Kyung-Won UniversitySlide 1 NOTE: Update all red fields replacing with your information;
Doc.: IEEE /1468r1 Submission July 2013 Adrian Stephens, Intel CorporationSlide November 2013 Motions to 802 EC Date: Authors:
Doc.: IEEE /0680r0 Submission May 2008 Jesse Walker, Intel CorporationSlide 1 IEEE JTC1 Ad Hoc Closing Report Date: Authors:
27/06/2016SC32 Rapporteur Ad Hoc on Vocabulary Vocabulary Ad Hoc Rapporteur Report (SC32 Plenary Item 7.) SC36 Plenary /31 Kobe Japan SC32 N1439.
Doc.: IEEE /1454r0 Submission Jan 2013 IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process 15 January 2013 Haasz et al, IEEESlide.
Future Network Standardization Activities in ISO/IEC JTC1/SC6
Proposal for study scope of CJK IPTV-adhoc group
IAF TC Report to PAC TC Summary of progress (June 2017)
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
Electric Vehicles and the Environment (EVE IWG)
WG Technical Editor’s Report
July 2010 doc.: IEEE /0xxxr0 IEEE 802 JTC1 Standing Committee Motions for WG mid-session plenary 9 May 2017 Authors: Name Company Phone.
IEEE 802 Process for Interactions with ISO/IEC JTC 1/SC 6
JTC1/SC6 Chair’s Closing Report
Current Situation of F.MID and H.MID in ITU-T SG16
Status Report November 2007
CJK 10th NGN-WG (Follow up IPTV-GSI) Chae Sub, Lee
IEEE 802 JTC1 Standing Committee formalization proposal
IEEE 802 JTC1 Standing Committee Nov 2017 motions for EC
IEEE 802 JTC1 Standing Committee July 2018 opening report for EC
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
IEEE 802 Process for Interactions with ISO/IEC JTC 1/SC 6
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
IEEE 802 JTC1 Standing Committee July 2018 opening report for EC
IEEE 802 JTC1 Standing Committee July 2018 (San Diego) closing report
IEEE JTC1 Ad Hoc Mid-Week Status May 2008
JTC1 Ad Hoc November Agenda
IEEE 802 JTC1 Standing Committee July 2018 opening report for EC
IEEE 802 Process for Interactions with ISO/IEC JTC 1/SC 6 & 7
Electric Vehicles and the Environment (EVE IWG)
May Liaison Report Date: Authors: May 2009
IEEE 802 JTC1 Standing Committee LS Recommendation
IEEE 802 JTC1 Standing Committee Mar 2019 opening report for EC
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
JTC1 ad hoc closing report (May11)
JTC1 Ad Hoc November Agenda
Introduction Andrew Myles chairs the IEEE 802 JTC1 standing committee
IEEE 802 JTC1 Standing Committee July 2018 opening report for EC
Presentation transcript:

Status of Collaborative Team work on H.IDscheme, H.ID-RA and H.IRP Chiaki Ishikawa (TTC)

Summary Many meetings after the last CJK meeting (next slide). H.IRP sailed smoothly. H.IDscheme ran into many procedural and content issues, and still under serious discussion.

List of meetings Fall of 2010: ITU-T JCA-NID unofficial ad-hoc meetings of experts. Nov 24-26, 2010: The last CJK NID/USN meeting in Tokyo. Nov 29-Dec 4, 2010: ITU-T SG16 WP2 Rapporteur meeting. March 14-25, 2011: ITU-T SG16 Q21,Q22 April 19, 20: ISO/IEC JTC1/SC31/WG6 meeting in Stockholm. May 9-13, 2011: The last Q21/Q22 session at GSI-IoT meeting in Geneva June 20, 21: ISO/IEC JTC1/SC31/WG and DoC Meeting May 22: ISO/IEC JTC1/SC31 plenary in Vienna June 26, 30, July 5 : Ad-hoc committee organized by chair of SC31 July 11th: Continuation of June 20’s and DoC Meeting.

Fall of 2010: ITU-T JCA-NID unofficial ad-hoc meetings of experts. Nov 24-26, 2010: The last CJK NID/USN meeting in Tokyo. Nov 29-Dec 4, 2010: ITU-T SG16 WP2 Rapporteur meeting. – On Nov 29 th afternoon, the ad-hoc meeting of experts organized by ITU-T JCA-NID recommended that the proposals from ITU-T SG16 (H.IDscheme) and ISO/IEC JTC1/SC 31/WG 6 (MII) be merged. – So the merged idea was discussed there with ITU-T SG16 editors and ISO Project editor and draft was created and submitted to SG16 and brought back to ISO/IEC JTC1/SC31/WG6. – Basically, H.IRP | was agreed upon to be common standard without much difficulty.

March 14-25, 2011: ITU-T SG16 Q21,Q22 – The final (very little edited) ToR for Collaborative team work was approved, and ISO/IEC JTC1/SC31/WG6 was asked to approve that. April 19, 20: ISO/IEC JTC1/SC31/WG6 meeting in Stockholm. – ToR was approved and the SC31 was asked to approve it. May 9-13, 2011: The last Q21/Q22 session at GSI-IoT meeting in Geneva – H.ID-RA | being discussed. – COMMON format documents were tentatively proposed for trial (after a straw poll) for H.IDScheme | and H.ID-RA | and so were created and sent from ITU-T SG16 to ISO/IEC JTC1/SC31/WG6. – Again, H.IRP | had not much difficulty.

May 22: ISO/IEC JTC1/SC31 plenary in Vienna – ToR was finally approved. It is official. – This meeting raised “scope issues” within ISO/IEC JTC 1/SC 31. WG6 has a rather narrow scope and cannot create standard that “identify” physical objects. An ad-hoc meeting was proposed to resolve this issue and to create a recommendation. June 20: ISO/IEC JTC1/SC31/WG and DoC Meeting – The scope issues and a few issues were raised. The scope issues needed to wait for the ad-hoc meeting report (by July 11 th, the continuation meeting.) June 21: ISO/IEC JTC1/SC31/WG (H.IRP) – Again, this document sailed smoothly.

June 26, 30, July 5 : Ad-hoc committee organized by chair of SC31 – The scope issues are caused due to the division of target areas assumed by WGs of ISO/IEC JTC1/SC31. – ITU-T finds it difficult to handle this division of area because it affects the wording, definition and other aspects of the draft Recommendation and International Standard in a somewhat contorted manner. – The chair is expected to submit a summary to SC31 and to WG6. – WG6 Project Editor of and can decide how to cope with the suggestion. July 11th: Continuation of June 20’s and DoC Meeting. – CJK participants (on ITU-SG16 WP2) will find out how the SC31 ad-hoc affects the draft of