Balancer Operation Intelift Operation Installation Troubleshooting Preventive Maintenance Preventive Maintenance OVERVIEW.

Slides:



Advertisements
Similar presentations
WHIRLPOOL Vertical modular Washer
Advertisements

DESIGN FOR XXX Design Strategies. Design for X Design Strategies 6/1/ Part shape strategies: adhere to specific process design guidelines if part.
F&T Inc. OVERHEAD CRANE SAFETY.
Chapter 30 ABS and EBS.
Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
Enhanced Easy-Stop TM Trailer ABS Training. Enhanced Easy-Stop Trailer ABS System configurations to meet any air-braked trailer application 2S / 1M, 2S.
Department of Environmental Conservation 1 DATAMAX PRINTER SETUP MODULE 1.
Administrator Training Overview-D2
Metering Pump Spare Parts Replacement. Pump Components (Metering Pump) Pumps are supplied with a 120VAC or 240VAC power cord. Use care to ensure pump.
HYDRAULICS & PNEUMATICS
5.3 Installing the blade server in a BladeCenter unit.
Trouble - Shooting ELR - Electric Latch Retraction.
Unit Test Calibration Training
Copyright © 2014 Delmar, Cengage Learning Electrical Accessories Instructor Name: (Your Name) 10 CHAPTER.
Motorized Tongue Jack Owners Manual Model SAFETY WARNINGS * Read, understand and follow all instructions before installing and/or using product.
4Identifying Leakage Source (Mech/ Elec) 4Mechanical Air Leak- Down 4Mechanical Air Leak- Up 4Electronic Drift- Up/ Down 4Load Cell Operation 4Understanding.
SAFETY MEETING Off Highway Trucks. Brakes There are four separate controls used for braking Service Brake Retarder Secondary Brake Parking Brake.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
APPLICATIONS: WHENEVER IT IS NOT POSSIBLE TO INSTALL A RAIL SYSTEM DIRECTLY ABOVE A WORK AREA, AN ARTICULATING ARM IS A SOLUTION ARTICULATING ARMS PROVIDE.
Tool removed during cycle Fault #2 Conditions for setting Tool cocked prox switch goes open during cycle AND force on load cell drops below limit in fault.
Syringe Pumps. Topics  Diagrams  Principles of Operation  Applications  Safety  Operation  Preventive Maintenance  Common Failure Modes  Troubleshooting.
OSHA Subpart Q Concrete and Masonry Construction.
Clean Air Box Usage & Care CABs RAMs CO Monitors.
KLINGE’S NMR 262 Two Independent Systems Integrated into one Unit This Requires Special Features:  Total Redundancy of Refrigeration Components  Total.
Power-Fill Operation Demonstration Power-Fill Operation Demonstration (See Installation and Operation Manual for detailed instructions)
Hydraulic Anti-Lock Braking System For Trucks, Buses and Motor Homes.
1 InnoSys Quick Connect End Effecter Service and Maintenance Procedures Nov. 19, 2007 Rev. B.
AccuMax Single Point Injection Operation (See Installation and Operation Manual for detailed instructions)
Antilock Brake, Traction Control, and Stability Control Systems
Features of CNC Machining Centers
2001, 2002 & 3012 Series Operation 2001, 2002 & 3012 Series Operation (See Installation and Operation Manual for detailed instructions)
Charging System Service
Lockout Tag out Training2009. Control of Hazardous Energy Policy Personal locks & keys will be issued to employees by their Safety/Training Coordinator.
Gas Furnace Controls Part 2.
AccuMax Multi-Point Injection Mechanics
Wegmans Bread Tray Lift Assist
Series Operational Training. 2 Water Tank Water Pump Multiple Discharges 2000 Series Line Strainer Foam Tank Electronic Direct Injection Proportioner.
Abs.
Copyright © 2014 Delmar, Cengage Learning APAD/ACPU A/C Control Systems Instructor Name: (Your Name) 11 CHAPTER.
Chapter 3 Manual Starters.
Electro-Pneumatics Module 1
Settings & Adjustments. Settings & Adjustments.
NAVIGATOR™ Portable Balances
Datron World Communications Inc. RT7000 HF TRANSCEIVER FIELD MAINTENANCE PROCEDURES.
Mercury G3 Service Tool Training Overview When opening G3 you will start at this screen first import thing to look for is communication.
Proper Use of Extension Cords
Why Maintenance Tasks are Important Produced by Joe Marchese.
1 B. Braun SpaceStation – Product details Overview Flexibility in use Typical configurations.
CLM Maintenance. Covers : 1 - Side cover, 2 - Back cover, 3 Top cover, 4 - Lamp door, 5 - Side cover input and communication side, 6 - HEPA dust filter,
1 InnoSys Quick Connect End Effecter Service and Maintenance Procedures Shreveport Assembly 14 MAY, 2008.
Spring Hill Assembly1 InnoSys Park Brake Tool Master Control Panel Screens 1 3-Mar-2008.
Tool Removed During Cycle Fault #2 Conditions for Setting Tool cocked prox switch goes open during cycle AND force on load cell drops below 5 lbs. Active.
Equipment Familiarization Hanse Environmental Inc. VTC Series.
6/23/2016 Quick Reference Parts Guide Introduction This Quick Reference Parts Guide is an easy way to locate part numbers to common replacement parts.
SAFE DIE HANDLING FOR STAMPING PRODUCTION OPERATIONS UAW-GM SAFE DIE HANDLING FOR STAMPING PRODUCTION OPERATIONS Copyright © UAW-GM Health & Safety.
Ignition System Provides a method of turning a spark ignition engine on & off. Operates on various supply voltages (Battery & Alternator) Produces high.
ANTI LOCK BRAKING SYSTEM
SPen & Camera Kit Experience App
Raymond 4-D Reach-Fork® Truck 7310
Features of CNC Machining Centers
Tool removed during cycle Fault #2
K TO 12 CHS MODULE FOR GRADE 9, PP
Features of CNC Machining Centers
F&T Inc. OVERHEAD CRANE SAFETY.
HYBRID COOKTOP.
1.11: Robot Controller.
Universal Interrupted Electronic Oil Primary R7184U Training Module
Ignition System Provides a method of turning a spark ignition engine on & off. Operates on various supply voltages (Battery & Alternator) Produces high.
Fluid Power System Electrical Control
Presentation transcript:

Balancer Operation Intelift Operation Installation Troubleshooting Preventive Maintenance Preventive Maintenance OVERVIEW

MODULE PREVIEW What is the function of the encoder wheel? ___ Sense load position___Decipher messages ___ Raise the load What is the green button on the Intelift pendent for? ___ Intelift Mode___ Power Off ___ Power On If air pressure is released from the piston chamber, the load will ______. ___ Raise___ Lower ___ Stay in place The control best suited for a lifting, balancing and dumping applications is the ______ control. ___ ZA___ BA___ Intelift

CAPABILITIES Intelift BalancerFunctionAir Balancer Dynamic Lift & Lower Single Load Balance Multiple Load Balance Dump Capability Smart Drop Capability ZA Control BA Control EA Control NONE

Aspects of Intelift Balancers Mechanical / Pneumatic Electronic

Mechanical Components Piston Housing Reel Thrust Bearing Ball Screw and Nut End Cap End Cover Z-Brake

Main Air Supply Pneumatic Operation

Main Air Supply Pneumatic Operation

Main Air Supply Pneumatic Operation

Z-Brake Safety Retraction System Centrifugal Force Prevents Excessive Upward Acceleration Standard On All Units Except 50 lb. Tool Balancer Patent No. 5,522,581

Intelift Components Encoder Assembly Pendent Assembly Manifold Assembly Controller Assembly

Intelift Pendent Intelift “ON” UP/ DOWN Clamp/Uncl amp Power “ON” Speed Select E-Stop Operator Interface to Intelift

Intelift Force Sensing Control Handle Force Sensing Load Cell E-Stop Operator Interface to Intelift Power “ON” Up/ Down switch Removed Speed Select

Intelift Controller Power Indicator Main Power “On/Off” Power Cord Pendent Connector Intelift Indicator Set-up Select Speed Indicator Intelift Display Processes Operator Inputs

Intelift Manifold Up Solenoids Down SolenoidsPressure Transducer Senses Pressure/ Controls Air to Balancer Air Supply Manifold Cover

Intelift Encoder Encoder Wheel Encoder Pick Up Senses Balancer Position

EXERCISE INTELIFT COMPONENTS

Dynamic Lift / Lower The rocker switch on the pendent are used to raise and lower the load.. Intelift Modes Float The load is manipulated by hand. The pressure sensor controls air into and out of the balancer. Dump The handling device will maintain vertical position as the load increases or decreases. Smart Drop The load will lower until only the weight of the handling device is supported. The clamp opens automatically to release the part.

Intelift Installation 1. Preparation Visual Inspection Electrical Festoon Air Supply Festoon (Configure Festooning Properly) 3. Initial Setup 3. Initial Setup Select Operational Mode Tare Control Handle and End- Effector 2. Installation 2. Installation Install Suspension Kit Install End-Effector Connect Control Handle Kit (Coiled or Straight) Connect AC Power 4. Functional Testing 4. Functional Testing Perform QA Test Connect Air Supply Test System Performance with Intended Task and Load

Intelift Installation 1. Preparation 1. Visual Inspection- Check to ensure equipment has no visible damage. 2. Electrical Festoon Insul8- is the recommended festoon 3. Air Supply Festoon Use a pre-coil tube assembly

Intelift Installation 2. Installation 4. Connect Pendent 1. Install Suspension Kit2. Install to Rail3. Install End-Effector 5. Connect AC Power

EXERCISE INTELIFT Modes/ Installation

Intelift Installation 3. Initial Set up 1. Switch Main Power On and air supply 2. Depress Pendent Power On

Keypad Buttons “Shift”- Initiates “QA” Testing “Setup” - Enters and exits you out of the Setup menu “Next” - Steps through each of four Intelift functions which may be changed Control Mode Intelift Mode Control Handle Tare End Effector Tare “Up/Down” - Selects value or entry for function Intelift Installation

3. Initial Set up (cont.) 3. Select Operational Modes4. Tare End Effector/ Pendent Press Next to change screens Press Up/ Down to change selection and tare end effector or pendent Press Set up to access Operational Mode Select

Intelift Installation 4. Functional Test  Dynamic Lift/ Lower Use the rocker switch to maneuver to the part. Engage the part. Depress the UP rocker switch. The end effector and part should lift. Depress the speed select button until the load moves at a comfortable speed. Depress the DN rocker to verify that the speed is correct.

Intelift Installation 4. Functional Test (cont.)  Force Sensing Control Handle Move the end effector to the part handled. Push down on the control handle and engage the part. Lift up on the control handle and raise the load. The load should move smoothly with minimal effort.

Intelift Installation 4. Functional Test (cont.)  Float Mode Push the Intelift button on the pendent. Engage the part. Raise the load by lifting the end effector. Move the load up/down by hand not using the pendent. The load should move smoothly with minimal effort.

Intelift Installation 4. Functional Test (cont.)  Smart Drop Mode Push the Intelift button on the pendent Move the end effector to the part handled. Engage the part. Raise the load approximately 6 inches. Press and release the clamp/unclamp button. Smart Drop- the load should lower the 6 inches and release the part when supported.

Intelift Installation 4. Functional Test (cont.)  Dump Mode Push the Intelift button on the pendent Move the end effector to the part handled. Engage the part. Raise the load approximately 12 inches. Begin dumping the load. Dump- the load should remain in the same position as the weight decreases.

EXERCISE INTELIFT Set-up/ Functional test

F F ind out as many details about failure: What happened prior to failure? Is the unit E-Stopped/ power “on”? Was anyone operating the unit when it failed? B B e sure not to overlook the obvious!! I I f you think you have a suspect part, prove it before you replace it!! Intelift Troubleshooting

Intelift Troubleshooting Table

Intelift Schematic

Intelift Troubleshooting Intelift QA Self Test Press and Release “Power ON” Remove power from the Intelift with E-Stop Press and hold the Shift key to start the Self Test

What running “QA” will do for you Help troubleshoot sensor or control handle communication problems EncoderRocker switch Pressure SensorDisplay Button Intelift Troubleshooting

Intelift Preventive Maintenance

Balancer Preventive Maintenance

Intelift Model Configuration IAW015080A21SP PENDENTCAPACITY SUSPENSION OPTION TRAVEL WIRE ROPE VOLTAGE OPTION Z-STOP OPTION POWER CORD OPTION