SITRA Test beams Simulations Zdeněk Doležal Charles University Prague Annual EUDET meeting Munich 18-20 October 2006.

Slides:



Advertisements
Similar presentations
Peter Kodyš, March 21, 2006, DEPFET workshop, Prague, Status in Prague1 Charles University Prague Pavel Bažant, Zdeňka Broklová, Jan Brož, Zdeněk Doležal,
Advertisements

Kondo GNANVO Florida Institute of Technology, Melbourne FL.
June 19, 2002 A Software Skeleton for the Full Front-End Crate Test at BNL Goal: to provide a working data acquisition (DAQ) system for the coming full.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
CMS Week Sept 2002 HCAL Data Concentrator Status Report for RUWG and Calibration WG Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
Tracker DAQ Makoto Yoshida (Osaka Univ.) MICE Frascati 2005/6/27.
D. Peterson, “Tracking Detector R&D at Cornell University and Purdue University” ALCPG SLAC 07-Jan Tracking Detector R&D at Cornell University and.
LKr readout: present and future R. Fantechi 30/8/2012.
SiTRA brief status report to the EUDET S.C., August 31 st 2009 Members: Helsinki University and VTT(Helsinki), LPHNE-UPMC/CNRS-IN2P3 (Paris), Charles University.
CALICE – 12/07/07 – Rémi CORNAT (LPC) 1 ASU and standalone test setup for ECAL MAIA BEE project Overview DAQ dedicated Sensor test In situ debug and maintenance.
Mathieu Goffe EUDET JRA1 meeting, DESY Wednesday 30 January 2008 IPHC, 23 rue du Loess BP 28, 67037, Strasbourg Cedex 02, France.
EUDET Annual Meeting, Munich, October EUDET Beam Telescope: status of sensor’s PCBs Wojciech Dulinski on behalf.
Tobias Haas DESY 7 November 2006 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET Pixel Telescope Pixel Telescope.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
Gif++ CR tracker setup G. Aielli for the RPC collaboration.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE The pixel telescope DAQ Daniel Haas/Emlyn Corrin DPNC Genève EUDET Annual Meeting 2008 NIKHEF, Amsterdam.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
DESY test beam (DAQ integration, measurement plans, analysis) Mathieu Benoit.
S. Brambilla, “Recent DAQ integration test at L.N.L May 2008” 7 th AGATA Week, Uppsala, 8-11 July th AGATA Week Uppsala, 8-11 July 2008 Recent.
Timepix Telescope Plans Proposed Work Packages for the Timepix Telescope Richard Plackett CERN, 8 th December 09.
EUDRB: the data reduction board of the EUDET pixel telescope Lorenzo Chiarelli, Angelo Cotta Ramusino, Livio Piemontese, Davide Spazian Università & INFN.
WP9.4 baseline deliverable summary 10 December 2014 Thomas Bergauer (HEPHY Vienna)
Summary talk of Session 6 - Electronics and Interfacing to AD DAQ - Mechanics for the Demonstrator for the AD ancillary detector integration team: for.
Bernardo Mota (CERN PH/ED) 17/05/04ALICE TPC Meeting Progress on the RCU Prototyping Bernardo Mota CERN PH/ED Overview Architecture Trigger and Clock Distribution.
SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY.
André Augustinus 16 September 2002 PVSS & Framework How to get started.
SiTra DAQ integration into EUDAQ Zdeněk Doležal, Daniel Scheirich (Charles U. Prague) With info from Hao Yin and Thomas Bergauer.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE JRA1 Parallel - DAQ Status, Emlyn Corrin, 8 Oct 2007 EUDET Annual Meeting, Palaiseau, Paris DAQ Status.
News on GEM Readout with the SRS, DATE & AMORE
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE JRA1 DAQ Status Daniel Haas DPNC Genève Status DAQ board INFN Strasbourg DAQ boards TLU Bristol Software.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
IPHC - DRS Gilles CLAUS 04/04/20061/20 EUDET JRA1 Meeting, April 2006 MAPS Test & DAQ Strasbourg OUTLINE Summary of MimoStar 2 Workshop CCMOS DAQ Status.
GLAST LAT Project CERN Testbeam WorkShop, Pisa, 20 March 2006 David Smith & Denis Dumora VME DAQ 1 The Bordeaux Data Acquisition system
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE JRA1 - Data Acquisition Status Report Daniel Haas DPNC Genève Extended SC Meeting 1 Sep 2008.
1 JRA2-SITRA status report Z. Doležal, A. Savoy-Navarro for JRA2-SITRA partners (LPNHE Paris, Ch.U. Prague, Helsinki, Santander) and associates (CNM Barcelona,
Florida Institute of Technology, Melbourne, FL
David Cussans, 18 th October 2006 JRA1 Beam Telescope DAQ and Trigger.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
New DAQ at H8 Speranza Falciano INFN Rome H8 Workshop 2-3 April 2001.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
Scott Mandry, EUDET JRA1 Meeting, DESY 30 th January ISIS1 Testbeam EUDET JRA1 Meeting, DESY 30 th January 2008 Scott Mandry LCFI Collaboration.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
Micromegas for SLHC A project to investigate the use and determine the working parameters of Micromegas for SLHC tracking – in conjunction with the ATLAS.
DESY TestBeam preparation CERN ) Michele Bianco, Marcin Drozdwa Byszewski, Givi Sekhniaidze, Joerg Wotshack.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
JRA1 Magnet and Test Beam Infrastructure  Superconducting Magnet (PCMAG)  Mechanics  Cooling  Telescope Simulations  Measuring DESY Tobias.
Jorge Agramunt Ros BRIKEN DAQ Status. DAQ Integration, tests and background measurements at RIKEN. Jorge Agramunt Ros 3º BRIKEN Workshop July 2015.
DAQ & data format Peter Fischer Institut für Technische Informatik, Universität Mannheim Presentation given at the EUDET / JRA-1 review, , Geneva.
Mitglied der Helmholtz-Gemeinschaft Status of day-one experiment commissioning at COSY Huagen Xu Goa, Mar
62cm 64cm. DAQ status and Plans DAQ –Timing tuning –Which tools to learn (SC, Event monitor, GPIO, MIDAS, DIP, laser, storage, analysis) Plan with beam.
Scalable Readout System Data Acquisition using LabVIEW Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer]
Charles University Prague Institute of Particle and Nuclear Physics Zdeněk Doležal, Peter Kodyš, et al.
Analysis of LumiCal data from the 2010 testbeam
RD51-WG X June test beam experience: useful information for October
SiTRA multipurpose and standalone test infrastructure
Silicon Lab Bonn Physikalisches Institut Universität Bonn
Testbeam Timing Issues.
INO TRIDAS presentations
Cosmic Ray Tracker and Detector Control System at the GIF++
Example of DAQ Trigger issues for the SoLID experiment
Test Beam Measurements october – november, 2016
Testbeam status report
The LHCb Front-end Electronics System Status and Future Development
A Beam telescope for the EMC testbeam
Presentation transcript:

SITRA Test beams Simulations Zdeněk Doležal Charles University Prague Annual EUDET meeting Munich October 2006

Beams used  DESY, 1-6 GeV e Good access via EUDET Problem of multiple scattering (track precision >10 m) G4 simulation (Prague) Oct 23-Nov 5

Beams available  CERN, GeV  e High quality beam Planned for use in 2007+

Ingredients  Trigger + DAQ + Telescopes  Prototype modules + DAQ HW  DAQ software  Chamber, XY stage  Manpower (experts, shifters)  Data analysis

Trigger + DAQ+Telescopes ZEUS DESY group kindly provides us with the telescopes: trigger photomuliplier 3 defining an area of 9x9 mm2 triggering the readout of the 3 telescope units telescope 3 modules with crossed sensors about 3x3 cm2; diode pitch 25 micron, readout pitch 50 micron ("Cern type", Coledani et al., NIM372(1996)379 )NIM372(1996)379 readout CAEN module 550 and 551 in VME Power PC in the VME crate coincidence, deadtime control,... in a NIM crate in the hut. The VME crate is close to the telescope. Software and data format under investigations

SiLC Prototype Modules 30 cm ladders 2 new ladders with 3 9-cm CMS sensors each, i.e. 28 cm strip length one equipped with VA1 chips (for a comparison) and the other with SiLC UMC 180 nm chip  This module was built in Paris Long ladder a new prototype with 10 GLAST sensors, i.e. 90 cm strip length equipped with VA1 and SiLC UMC 180 nm chip This module was built in in collaboration of Karlsruhe and Paris (with help from CERN)

DAQ HW+SW Telescopes: CAEN VME V ADC+sequencer PowerPC in VME Crate, Lynx OS DESY Support promised SiLC modules: Interface card between UMC/VA chips and ADC NI AD card, 100 MHz, 14 bit (PCI or PXI) LabView DAQ SW tested in lab in Paris Readout speed limitations

Standalone Telescope+Proto DAQ Wait for trigger Process and save data Get data from chip Wait for trigger Process and save data Get data from chip Trigger

Synchronised Telescope+Proto DAQ Wait for trigger Process and save data Get data from chip Wait for trigger Process and save data Get data from chip Trigger

Synchronised Telescope+Proto DAQ Wait for trigger Process and save data Get data from chip Wait for trigger Process and save data Get data from chip Trigger Trigger Logic Unit BUSY

Synchronised Telescope+Proto DAQ Wait for trigger Process and save data Get data from chip Wait for trigger Process and save data Get data from chip Trigger Trigger Logic Unit READY T TSCOPE SWSiLC SW T Correlations: Offline SW Not prompt!

Synchronised Telescope+Proto DAQ Telescopes VME PowerPC readout, Lynx SiLC NI AD card (PCI or PXI), LabView DAQ SW Synchronisation might be time consuming! Hard to test in advance, but need to be prepared: data formats readout logic source codes

Common Telescope+Proto DAQ Wait for trigger Get data from chip Process, merge and save data, Correlations online Get data from chip Trigger Trigger Logic Unit

Common Telescope+Proto DAQ  Hardware?  Operating system?  SW Platform?  Perspective? VME, Power PC, Lynx OS NI scope card, PCI/PXI, Windows, LabView ?

Common Telescope+Proto DAQ Operating system?  Telescopes: VME can be read with a different communication board (NI PCI-VME) under Win or Linux  SiLC No need to leave Windows

Common Telescope+Proto DAQ Operating system?  Telescopes: VME can be read with a different communication board (NI PCI-VME) under Win or Linux  SiLC No need to leave Windows

Common Telescope+Proto DAQ SW platform?  LabView: ‘easy’, but slow  Windows MSVC++: fast, can use dll from vendors for PCI/PXI,VME + ROOT GUI + plots

Common Telescope+Proto DAQ Perspective?  Telescopes: The same for DESY beams Hopefully similar or identical for CERN/FNAL beams New EUDET for with common DAQ?  SiLC R/O mode change with 130 nm (end of 2006): digital readout Simpler DAQ HW will be needed Keeping SW/HW functionality for 180 nm/VA desirable for crosscheck

Common Telescope+Proto DAQ Proposal  October 2006: stay with 2 standalone synchronised systems  130 nm (2007): attempt to create common TB software Who?  Prague: MSVC++ + ROOT,  Other proposals, participations  Prerequisites: all info on communication protocols, chip configuration sequences, etc.

Chamber, supports, XY stage  Concrete blocks, tripod available on site  30 and 1000 kg XY stages with a remote control exist at DESY  30 kg XY stage booked  Chambers?  Dry nitrogen: to be checked

Responsibilities Telescopes, trigger…  Prague  Obninsk  DESY Prototypes+ test setup  Paris  Karlsruhe  Vienna Mechanics, chambers  DESY  Paris  Karlsruhe  Valencia Readout  Prague  Paris  DESY Offline analysis  Prague Shifts  All Data analysis  Prague  Everyone interested

Analysis framework  Tools for quick data visualisation to find correlations etc. exist  Root DST will be created from raw data  Set of macros to analyze basic detector performance (CMN, S/N) exists  Further detailed analysis will be done on the DSTs

Simulations  Spatial resolution is not expected to be the most urgent parameter to find at DESY beam test  Existing Prague G4 simulation framework is used to simulate the geometry  Further simulations in G4/MOKKA system are planned at Paris, DESY and Prague  For future beam tests simulation based geometry optimisation is necessary