Creativity Project Learning Outside the Classroom St John’s Catholic Primary School, Burscough.

Slides:



Advertisements
Similar presentations
ProfessionalValues and Practice Look for differentiation. Monitor lesson plans (planning links). IEPs used Short evaluations should be encouraged (and.
Advertisements

James McFarlane School Building our Curriculum. James McFarlane School The school meets the needs of pupils from 5 to 19 years with severe and complex.
Managing the Statutory Requirements for Assessment April 2011.
Plantation Primary School
The Creative Learning Journey an introduction . . .
School Development Plan
The Index for Inclusion. Why have an Index Forum? Purpose To offer regular opportunities to discuss school improvement with other neighbouring schools,
The National Curriculum A guide for parents. The National Curriculum is a framework used by all maintained schools to ensure that teaching and learning.
Reception Curriculum Evening. Activities within the EYFS are based on what children already know about and can do. They recognise children’s different.
Parent Forum 10 th January Outline of session – Raising Standards How do we compare with other schools on results ? What are we doing to make progress.
BA (Hons) Primary Education Year Three School Based Training Briefing
Progress made with our two chosen indicators from the Index of Inclusion.
GARSTANG COMMUNITY PRIMARY SCHOOL ‘The Aliens Have Landed’ CREATIVITY WEEK.
LEARNING WALKS How we can share good practice and learn from one another. Jo Lakey School Improvement Officer.
Learning outside the classroom justification. Pupils within a Year 2 class needed to reconnect and be inspired to engage in their learning, particularly.
21 st Century Learning Environments at All Saints. Initial steps towards Personalised Learning in the Grade 3/4 Level.
Who or what needs to be ready? Leaders Teachers Classroom support Administration Premises staff Children
1 The New Primary National Curriculum St Helen’s CE Primary School.
School and Physical Education Aims: Understand why PE is taught in schools Be aware of the PESSCL and PESSYP strategies and the impact their implementation.
APP Middle School’s Project Kirklees. The Vision Every child knows how they are doing and what they need to do to improve and how to get there. They get.
NEW MATHS CURRICULUM NEW CURRICULUM 2014 In September 2014 the primary school curriculum including maths was radically changed. The main aim is.
Why a foundation curriculum at Manchester Academy? Ease transfer and transition (pupils arrive from 35 different primary schools) Many students arrive.
Leading from the front – the role of English in developing literacy across the school 20 March 2015 Lesley Daniel Associate inspector.
School’s Cool in Kindergarten for the Kindergarten Teacher School’s Cool Makes a Difference!
A big picture for Outstanding Citizenship. Three key questions 3 How well are we achieving our aims? 1 What are we trying to achieve? 2 How do we organise.
Understanding the Arts and Design /13 WHATHOWBY WHOM/WHENFINANCIAL COMMITMENTSUCCESS CRITERIA Develop children’s understanding of art as a explorative.
Another New Framework Major Changes: No more satisfactory 2 strikes and you are out All criteria changed Very short notice No pre-inspection brief.
Park Life Learning outside the classroom. Our Plan Our plan is to take a group of Key Stage 1 children to Abington Park and create a range of cross- curricular.
Bradfield CE (VA) Primary School School Development Priorities
The other half of the course: fostering student engagement in Secondary PGCE Professional Studies Joan Smith & Phil Wood School of Education
Strathkinness Primary School An introduction to the Curriculum for Excellence – 24 th March 2010 (Revised March 30 th 2010 with new links added)
Teaching and Learning Outside the Classroom Karen Phethean.
Reservoir Primary School Literacy Share Day
Important Information Have you got a username and password for the school SRF account? If your school has not registered before then you can do this if.
Leading improvement using the Primary Framework. Keys to further improvement A growing body of research identifies important and interrelated keys to.
Teaching and Learning Outside the Classroom Karen Phethean March 2012Professional Practice 1 Sem KP.
Primary Headteacher Report. January Methodology 8 Primary Schools both rural and urban Ranged from Ofsted ‘Outstanding’ to one just out of ‘special.
Middle Leadership Programme Day 1: The Effective Middle Leader.
Torrisholme Community Primary School Parents’ Curriculum Evening October 2014.
Early Years Foundation Stage
The Coseley School A Co-operative Trust Closing the Gap Strategies – 2015/16 Believe, Achieve, Excel Closing the Gap Strategies – 2015/16 Believe, Achieve,
How does collaborative group work affect science learning?
Reepham Primary School School Improvement and Development At Reepham Primary School we aspire to be confident and ambitious learners who care for.
Traffic lights show news that the school thinks is GOOD, REQUIRING IMPROVEMENT, or INADEQUATE. The Palmer Academy Self-Evaluation for Parents & Carers.
Module 6 Primary ITT Providers and NQT Coordinators: Learning Outside the Classroom – an Introduction.
Helmingham Community Primary School Assessment Information Evening 10 February 2016.
Module 2 From Curriculum to Compelling Learning. 2Module 2. From Curriculum to Compelling Learning Module 2 | Session 1 By the end of the session, you.
Education in Wales. Wales is divided into 22 Local Authorities Oakfield Primary School is in the Local Authority of Cardiff, the capitol city of Wales.
Y1 SBT Workshop EYFS Input Please ensure you have registered your name before you take a seat.
Primary Social & Emotional Aspects of Learning Theme 1: New beginnings.
Knowledge Transfer Centres Improving Reading Practice Hazel Community Primary School Highfields Primary School Kestrals’ Field Primary School Whitehall.
Ripple Primary School PSQM Principles of Good Science Teaching.
Come to our curriculum evening after school on Monday Speak to staff about how your child learns Ask questions about how your child is assessed Find out.
Making the programme work for your students.  A strong work focused route which is designed to motivate yr old young people.  Vocationally related.
The Future for Assessment? Assessing Pupil Progress (APP) as a tool for effective Teacher Assessment in Primary Science.
Research Project Our school is called Elworth Hall Primary school. We are located in Elworth, a small area within Sandbach. There are approximately.
Moving to Outstanding Ofsted Findings Improvement update meeting.
Teaching of Reading at Southfield Tuesday 28th February
Further information contact:
Walderslade Primary School Wednesday 23rd September 2015
St Catherine’s Catholic Primary School
LEARNING WALKS How we can share good practice
Governor’s meeting 11th July 2017
Meet the teacher evening Session 16 17
For further school friendly materials visit
Good afternoon! Help yourself to refreshments
Summerbridge School: Parent Information Meeting
Bringing Design and Technology Alive
School Review – Monitoring visit from Ofsted
Transition from Reception to Year 1
Presentation transcript:

Creativity Project Learning Outside the Classroom St John’s Catholic Primary School, Burscough

Outline of project Themed curriculum throughout school since 2009 High proportion of boys within the school. (70% Whole school, approx 90% KS2) Extensive grounds split into areas of interest. Good links to local environments and community. To allocate at least 10% of each class timetable to learning experiences in the outdoor environment and provide a full range of relevant educational experiences.

Objectives To allocate at least 10% of each class timetable to learning experiences in the outdoor environment and provide a full range of relevant educational experiences. Extend and support the embodiment of themed curriculum within school. Enable focus on more sensory teaching and learning, particularly kinaesthetic to provide more suited learning experiences for boys. Focus on developing PSHE, citizenship and problem solving with strong links to ICT.

Organisation & Involvement Size of school enabled whole school community to be involved. All teaching staff worked closely to develop strategy to put project into place. Then implemented through MTP planning, daily planning and themed weeks. Emphasis also on remaining flexible and opportunistic should learning experiences present themselves outside of timetable. Half termly staff meetings on timetable expectation (10% of week for each class), rotation of areas within school grounds, support and collaboration on ideas for areas within school grounds, local community and school trips, learning experiences that specific outdoor areas could provide.

Project rolled out consistently throughout the half term through teachers and support staff. This encouraged outdoor learning to become an organic part of everyday teaching and enabled the children to adjust rapidly to the routine. Teachers used their professional judgement and skills to plan and organise the required outdoor learning time into their weekly routine based on themed MTP, daily planning and suitability of conditions. Sound planning enabled outside learning opportunities to be developed across all curriculum areas rather than polarised into a single project or subject. Nature of organisation and roll out means that rather than lasting a set time, outdoor learning can become a continuous and consistent teaching and learning tool throughout the whole school year. Organisation & Involvement

Examples of outdoor learning

Case Studies PSHE and Citizenship Focus As part of Year 1 & 2 topic on Trains and Canals we took a trip to our local train station. We focused the visit on learning about the benefits of having a station in our town and the effects on the people who live in Burscough. Science, Geography and Citizenship Focus Year 2 and 3 visited Platt’s Lake opposite our school to do some pond dipping and hunt for different habitats. They also made posters on how to keep those habitats safe.

Case Studies Maths Focus Year 4 and 5 went on a Maths trail around the school. They had to find the answers to calculations to get the next clue. They hunted high and low around the whole of the school – inside and out! PSHE, Citizenship and ICT Focus The Year 6 children created a map of the school grounds and took photographs to show where bullying hot spots may be, along with quiet areas and noisy areas and added them to the map to make it accessible to the whole school.

School Council devised pupil questionnaires and interviews throughout all year groups to gain feedback on how the children felt about their outside learning experiences. Discussion in staff meetings to share feelings and thoughts on teaching and learning in the outdoor environment. Shared good practice and ways to overcome barriers. Support staff feedback sheets incorporating information on outdoor learning experiences enable teachers to plan next steps ensure progression and enjoyment. Direct comparison of same lessons taught inside and outside the classroom. Monitoring and Evaluation

The assessment policy within school has been amended to include termly assessments of Foundation subjects which we have found to be greatly supported by the evidence collected during this project. It has enabled Subject Leaders to gain much more evidence relating to their subject through photographic evidence and feedback. Results of school council questionnaires showed conclusively that all children within the school found outdoor learning a positive experience and looked forward the sessions. The boys in particular were more motivated and found the lessons more accessible. Impact of the project

Staff felt that through careful planning and preparation in the early stages of a topic that outdoor learning experiences were positive and beneficial. We found that outdoor learning enabled more concrete links between Every Child Matters and the curriculum and that the teaching of PSHE and citizenship were improved. The profile of the school has become more visible due to visits and experiences within the local community. The constraints of risk assessments has on occasion meant that teachers have had to be flexible with their outdoor teaching and learning. Impact of the project

Due to the way that the project was rolled out and implemented we intend to continue to include outdoor learning experiences as an integral part of our school’s curriculum. Continue to develop the outside learning environment within the school grounds with the support of all staff and parents. Discussions are in place within the school council and staff team on the development of an outdoor classroom. Developing a School Grounds Development Team involving Governors and parents. Develop stronger links with the local community through the use of the local area and the people who live and work in it. What happens now?

The practicalities associated with the weather have on occasion disrupted planned outdoor learning experiences. However on some occasions parents received letters requesting relevant resources such as wellington boots and raincoats to be sent into school with the children which parents have been very supportive of. Risk assessments and safeguarding constraints have sometimes meant that we could not make the most of outdoor learning, i.e. the snow meant that we had to stay indoors due to health and safety. A huge learning opportunity missed in our opinion! Evaluation