Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授.

Slides:



Advertisements
Similar presentations
Integrated Project Management IPM (Without IPPD) Intermediate Concepts of CMMI Project meets the organization Author: Kiril Karaatanasov
Advertisements

Process and Product Quality Assurance (PPQA)
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
More CMM Part Two : Details.
Project Change Management
CMMI PMC Group Members Inam ul Haq Sajjad Raza Nabeel Azam
PROCESS AND PRODUCT QUALITY ASSURANCE
Dean Cox Naval Undersea Warfare Center, Keyport Capability maturity model integration CMMI FOR Washington state university 16 September 2009.
200209–CSSA0001 – 16/27/ :25 PM CSSA Cepeda Systems & Software Analysis, Inc. GENERIC.
Project Management Session 7
Process Area : Requirement Management (REQM) By: Amna Rehmat Maria Habib Sana Ahmed.
What is Business Analysis Planning & Monitoring?
Understanding (and Untangling) Verification and Validation Requirements ISO 9001 vs. CMMI-Dev 1.2.
Capability Maturity Model Integrated
Degree and Graduation Seminar Project Management Processes
CMMI Course Summary CMMI course Module 9..
Capability Maturity Model Integration
1 The Continuous Representation. 2 UNIT 2 Topics covered in this unit include Additional terminology Practices – The fundamental building blocks Process.
8. CMMI Standards and Certifications
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
-Nikhil Bhatia 28 th October What is RUP? Central Elements of RUP Project Lifecycle Phases Six Engineering Disciplines Three Supporting Disciplines.
The PMBOK® Guide Distilled for the SPI Professional
1 The Continuous Representation. 2 UNIT 2 Topics covered in this unit include Additional terminology Practices – The fundamental building blocks Process.
CMMi What is CMMi? Basic terms Levels Common Features Assessment process List of KPAs for each level.
Software System Engineering: A tutorial
CMM Level 2 KPA’s CS 4320 Fall Requirements Management 1 Goals: – System requirements allocated to software are controlled using a baseline for.
PPMT CE-408T Engr. Faisal ur Rehman CED N-W.F.P UET P.
Soft Tech Development Inc. 1 Software Project Tracking A CMM Level 2 Key Process Area Soft Tech Development Inc.
Project Monitoring and Control 指導教授:李健興老師 學生:黃麟凱同學 學號: R 學號: R
1 / x Project Planning CMMI Project Planning Jean-Luc Deprez Robin Leblon.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
『华东师范大学』 课程名称: 软件开发实践 Software Development Practice 课程类型: 实践课 第二讲: 项目管理 Lect_02: Manage the Project 主讲 : 软件学院 周勇 副 教授 日期 :
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
10/16/2015Bahill1 Organizational Innovation and Deployment Causal Analysis and Resolution 5 Optimizing 4 Quantitatively Managed 3 Defined 2 Managed Continuous.
Software process improvement Framework for SPI SPI support groups, maturity and immaturity models Assessment and gap analysis Education and training Selection.
Adaptive Processes Overview Adaptive Processes©. Adaptive Processes © Adaptive ProcessesSimpler, Faster, Better2 Objective To provide an over view of.
1/18 CMMI Risk Management Jense Seurynck Daan Van Britsom Risk Management.
Project Life Cycle.
Managing CMMI® as a Project
CMMI: PROCESS AND PRODUCT QUALITY ASSURANCE Lieven Lemiengre Thomas Spranghers.
Georgia Institute of Technology CS 4320 Fall 2003.
University of Southern California Center for Systems and Software Engineering Barry Boehm, USC CS 510 Software Planning Guidelines.
Capability Maturity Model Integration Project Monitoring and Control Software Management 2008 – 2009 Alexander Ide Niels Soetens.
@2002 Copyright, Itreya Technologies CMMI kick off July 2005.
 Management ◦ The activities and tasks undertaken by one or more persons for the purpose of planning and controlling the activities of other in order.
1 Agenda for measurement r1. CMMI r2. Other thrusts.
Capability Maturity Model Integration Project Monitoring and Control Software Management 2008 – 2009 Alexander Ide Niels Soetens.
Software Project Management (SEWPZG622) BITS-WIPRO Collaborative Programme: MS in Software Engineering SECOND SEMESTER /1/ "The content of this.
Purpose: The purpose of CMM Integration is to provide guidance for improving your organization’s processes and your ability to manage the development,
Guidelines for Process
需求管理 Capability Maturity Model Integrated Author : Softare Engineering Institute Carnegie Mellon University.
Copyright © | Trade secret and confidential Page 1 Innovative, Professional, Fact Based and Eustressed© Maruthi Quality Management Services Ptv. Ltd..,
State of Georgia Release Management Training
 CMMI  REQUIREMENT DEVELOPMENT  SPECIFIC AND GENERIC GOALS  SG1: Develop CUSTOMER Requirement  SG2: Develop Product Requirement  SG3: Analyze.
Advanced Project Management Project Planning Phase Ghazala Amin.
Pittsburgh, PA CMMI Acquisition Module - Page M5-1 CMMI ® Sponsored by the U.S. Department of Defense © 2005 by Carnegie Mellon University This.
COMPGZ07 Project Management CMMI Project Planning Lecture 5b Graham Collins, UCL.
Apply Project Scope Management Techniques Project Scope Processes – Part 2 Week 4 Certificate IV in Project Management Qualification Code BSB41507.
MSA Orientation – v203a 1 What’s RIGHT with the CMMI?!? Pat O’Toole
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
CMMI Model overview Practical experience. Copyright © 2014 Accenture All rights reserved. 2 Education 2004 graduated LU, Faculty of Physics and Mathematics,
© 2004 Tangram Hi-Tech Solutions Project Management According to the CMMI1 Project Management according to the Capability Maturity Model (CMMI)
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
A Comparison of CMMI & SPICE
CMMI for Services, Version 1.3 Speaker: Business Excellence Date:
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Level - 3 Process Areas (CMMI-DEV)
CMMI – Staged Representation
Business Process Maturity Model
CIS12-3 IT Project Management
Presentation transcript:

Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授

Purpose The purpose of Project is to establish and maintain plans that define project activities.

Related Process Areas The product and product components. Managing requirements needed for planning and re-planning. Risk Management process area. Transforming requirements into product and product component solutions. Planning required for porject porgress and performance. Planning needs for managing an acquisition.

Specific and Generic Goals SG 1 Establish Estimates SG 2 Develop Project Plan SG 3 Obtain Commitment to the Plan GG 2 Institutionalize a Managed Process

Specific Practices by Goal SG 1 Establish Estimates Establish of project planning parameters are established and maintained. SP 1.1 Establish the Scope of Project Establish and maintain a top-level work breakdown structure(WBS) to establish of the scope of the project.

Specific Practices by Goal SP 1.2 Establish Estimate of Project Attributes Establish and document estimates of the attributes of the work products and tasks. For Software Engineering

Specific Practices by Goal Typical Work Products 1. Technical approach 2. Size and complexity of tasks and work products 3. Estimating Models 4. Attribute estimates

Specific Practices by Goal SP 1.3 Define project Life Cycle De fine the project life-cycle phases upon which to scope the planning effort.

Specific Practices by Goal Typical Work Products 1. Project life-cycle phases 2. Products life-cycle phases

Specific Practices by Goal SP 1.4 Determine Estimates of Effort and Cost Estimate the project effort and cost for the work products and tasks based on estimation rationale.

Specific Practices by Goal Typical Work Products 1. Projects schedules 2. Schedules dependencies 3. Project Budget

Specific Practices by Goal SP 2.2 Identify Project Risks Identify and analyze project risks.

Specific Practices by Goal SP 2.3 Plan for Data Management Plan for the management of project data.

Specific Practices by Goal Typical Work Products 1. Data management plan 2. Master list of managed data 3. Data content and format description 4. Data requirements lists for acquirers and for suppliers 5. Privacy requirements 6. Security requirements 7. Security procedures 8. Mechanism for data retrival,reproduction,and distribution 9. Schedule for collection of project data 10. Listing of project data to be collected

Specific Practices by Goal SP 2.4 Plan for Porject Resources Plan for necessary resources to perform the project.

Specific Practices by Goal Typical Work Products 1. WBS work packages 2. WBS task dictionary 3. Staffing requirements based on project size and scope 4. Critical facilities/equipment list 5. Process/workflow definitions and diagrams 6. Program administration requirements list

Specific Practices by Goal SP 2.5 Plan for Needed Knowledge and Skills Plan for knowledge and skills needed to perform the project.

Specific Practices by Goal SP 2.6 Plan Stakeholder Involvement Plan the involvement with identified stakeholders. SP 2.7 Establish the Project Plan Establish and maintain the overall project plan content.

Specific Practices by Goal SG 3 Obtain Commitment to the Plan Commitments to the porject plan are established maintained.

Specific Practices by Goal SP 3.1 Review Subordinate Plans Review subordinate plans to understand project commitments. Typical Work Products 1. Record of subordinate plan reviews

Specific Practices by Goal SP 3.2 Reconcile the project plan to reflect available and projected resources.

Specific Practices by Goal Typical Work Products Revised methods and corresponding estimating parameters(e.g.,better tools,use of off-the-shelf componets) Re-negotiated budgets Revised schedules Revised requirements list Renegotiated stakeholder agreements

Specific Practices by Goal Sp 3.3 Obtain Plan Commitment Obtain commitment from relevant stakeholders responsible foe performing and supporting plan execution.

Specific Practices by Goal Typical Work Products 1. Documents requests for commitments 2. Documented commitments

Specific Practices by Goal GG 2 Institutionalize a Managed Process The process is institutionalized a managed process.

Commitment to Perform GP 2.1 (co1) Establish an Organizational Policy Establish and maintain an organizational policy for planning and performing the project planning process.

Ability to Perform GP2.2 (AB 1) Plan the Process Establish and maintain the requirements and objectives,and plans for performing the project planning process.

Ability to Perform GP2.3 (AB2) Provide Resources Provide adquate resources for performing the project planning process,developing the work products and providing the services of the process.

Ability to Perform GP 2.4 (AB3) Assign Responsibility Assign responsibility and authority for performing the process,developing the work products,and providing the services of the project planning process.

Ability to Perform GP 2.5 (AB4) Train People Train the people performing or supporting the project planning process as needed.

Directing Implementation GP 2.6 (DI 1) Manage Configurations Place designated work products of te project planning process under appropriate levels pf configuration management.

Directing Implementation GP 2.7 (DI 2) Identify and Involve Relevant Stakeholders Identify and involve relevant stakeholders of the project planning process as planned.

Directing Implementation GP 2.8(DI 3) Monitor and Control the Process Monitor and control the project planning process against the and take appropriate corrective action.

Verifying Implementation GP 2.9 (VE1) Objectively Evaluate Adherence Objectively evaluate adherence of the project planning process and the work products and services of the process to the applicable requirements,objectives,and standards,and address noncompliance.

Verifying Implementation GP 2.10 (VE 2) Review Status with Higher-Level Management Review the activities,status,and results of the project planning process with higher- level management and resolve issues.