Andy Stobie’s Indoor G scale layout -Original configuration - Reconfigured Design.

Slides:



Advertisements
Similar presentations
Create a Detailed CTC Machine Model with JMRI/PanelPro
Advertisements

You may have a Realtrax switch that was wired wrong internally. Back in 2000 or 2001 some of them came through with the wrong leads soldered to the micro.
Preparing a Curb Ramp Project December 15, Tiers of Project Types Non-Signalized Curb Ramp Reconstruction - Typically utilizing standard plans.
Optics: Reflection, Refraction Mirrors and Lenses
A restoration/addition to a 1930s farmhouse. Pretty as this picture, rather overgrown with vines.
Progress on Thesis project Lysa Benton April, 2012 Please click to progress through slides.
Welcome to our OLD Kitchen Left mouse click to advance slide.
Core Strength Exercises
Door Drivers seat 2x4 wall with window (see page 1) Tunnel Open beams (2x6’s) (simulate burn through) Three steps 60 degree simulated roof. (with shingles)
Ropes and Knots Skill Drills.
CHAPTER 6 BASIC MANEUVERS.
BACKNEXT INDEXEND WTC Ground Level How compatible is the PATH- Lex connection with the current plans for the redevelopment of the World Trade Center site?
This presentation contains a fitness regime featuring Individual Exercise Balls.
Shoulder Circles While seated or standing, rotate your shoulders backwards and down in the largest circle you can make.
A PowerPoint presentation of the Use the right arrow key on your keyboard to advance the images.
Bench Exercises. - Student stands square to the bench. - Feet shoulder width apart with knees bent and torso bent forward. - Jump forward onto the bench.
 At times, when we’re on the road, at work, on vacation, or in any situation where working out is not necessarily the easiest or most convenient, we.
“MAKING YOUR FITNESS OUR BUSINESS!!” Training Out Enterprises.
WINDOWS An opening especially in the wall of a building for admission of light and air that is usually closed by casements or sashes containing transparent.
Also, while thinking of rear view mirrors, what about this situation?
Ledgewood Farm greenhouse construction How do I Start? to I’m Finished!
Inventor Or How to build things.
Stability Ball Workout
Matching An Excavator to Our Trucks ©2009 Dr. B. C. Paul Note – These Slides contain tables and information found in the Caterpillar Performance Handbook.
Traffic Flow Analysis Steve Prevette Burnt Hills & Big Flats RR Pasco WA Fluor Hanford City University.
Blue Prints.
Fitness Circuit Mrs. Harmer
Learning Story Trains and Tracks. Definition of Play 1) Play is freely chosen and self-directed 2) Play is transformative giving new meaning to familiar.
1 Telecom Cabling Ladder racks systems and relay racks Ladder racks systems and relay racks.
Adding Roads and Benches To A Pit Design ©2007 Dr. B. C. Paul {Note – The Name MineSight® and the Program described are property of Mintec Inc – Tucson,
Geo II ch 5 Edited 10/14/05 1 GPS- Collecting Data Now that you have your data dictionary loaded, let’s configure the unit and take it outside! RECOMMENDED:
Mn/DOT District 3 Presents… Flexibility Exercises
Physics Montwood High School R. Casao. The special theory of relativity deals with uniformly moving reference frames; the frames of reference are not.
Parent Drop off Please drop off between the cross walks. Pull up as far as possible. Do not let your students out before the crosswalk. If you pull into.
Sight Words List 1 Mr. Matthews Grade One can.
Undulator Orientation & Electron Beam Spacing Should the undulator frames be toward the central aisle or the tunnel walls? What is the optimum spacing.
CO2 Scrubber Bracket The Carbon Dioxide Removal Assembly is the system that removes carbon dioxide from the Space Station atmosphere. Usually it works.
PowerPoint Basics Tutorial 3: Graphics In this tutorial we’ll be looking at graphics, and the various types of illustrations that can be included in a.
Click the left mouse button to continue. If at any time you wish to end the presentation, press the Esc (Escape) key at the top left of the keyboard,
Visual Composition: Composition in Photography Adapted from
Scott Foresman Reading Street Word Wall Word List First Grade Kindergarten & Supplement Words Included.
HOUSING AUTHORITY Kathleen Millar. Floor Plan- level 1.
Ropes and Knots Skill Drills.
District 200 High frequency words
Nemours to Grez-sur-Loing Summer We began our walk in the centre of Nemours. Steps lead down from the Rue de Paris bridge to a road which runs along.
Design Studies 20 ‘Show Off’ Project How to make a computer monitor In Google Sketchup By: Liam Jack.
High Frequency Words August 31 - September 4 around be five help next
1 Alwest Seating & Sleeping Accommodations Most Alcan/Alwest boats, at this point in their lives, have undergone some level of interior renovation.
CENTRAL FREIGHT LINES Forklift Accidents Feb2015.
Sight Words.
Resistance Band Exercises. -Stand in the middle of the band with feet parallel and shoulder-width apart. -Hold handles at shoulder height. -Squat while.
Part III Meditation review & Yoga. Meditation Review How Many of you guys enjoyed instructor Raja yesterday? How many of you were actually able to enter.
Floor-Plan Dimensions and Notes
Perspective Drawings Linear perspective is a geometric method of representing the apparent diminishing of scale as the distance from object to viewer increases.
Transition: Ball possession Opponent > Ball Possession : Quick forward movement, Quick forward passing. Make field as big as possible. SESSION PLAN PRESENTATION.
U13 Rep Trial Testing 26th June 2016.
Stringing your car to determine wheel alignment is decidedly old school, but it's also effective, efficient and cheap. Begin by placing your car in a level.
The Reading Tug – Schuylkill By: Barry Hensel
2017 PCA CAR POOL PLAN.
PERSPECTIVES & ELEVATIONS
Station Ideas Print and laminate these stations or create your own based on your school’s equipment and students’ needs.
Optics: Reflection, Refraction Mirrors and Lenses
Andy Stobie’s Indoor G scale layout
Alabama Driver Manual Chapter 3
Andy’s redesigned indoor G scale layout
Andy’s redesigned indoor G scale layout
Floor Plans and Symbols
Optics: Reflection, Refraction Mirrors and Lenses
What Is Floor Plan? Linesgraph. Definition Of A Floor Plan A floor plan is a top view sketch which shows us the relationship between the different rooms,
Optics: Reflection, Refraction Mirrors and Lenses
Presentation transcript:

Andy Stobie’s Indoor G scale layout -Original configuration - Reconfigured Design

Original Track Plan Outer loop is elevated 6’ off floor – enter under bridge C; to reverse the loop there was a planned bridge A of 12’ long! Facing switch in bottom left leads to transition grade to lower loop, tying loops together. I inverted this image to fit a change in where I needed to enter the layout.

First construction progress – bench work only, open end

Wide angle to show the bathroom I first installed for the layout crew!

I absolutely could not wait to run my new AristoCraft RS-3, so along the long wall I set up a test track with parallel spur – yippee!

Needed more track to run on! I set out the curves to test the track plan – so far everything is A-OK!

After building the benchwork, out comes the plywood for the center section. Need to test the crossover – and that transition track!

Upper loop construction progress – bench work and risers – area is 26’ long and 12’ wide

Wall side from cab control location – upper switch for cross bridge visible

View of closed upper loop – opposing switch for cross bridge visible on right

Open side view – first attempt to elevate transition track – not gonna work!

This transition grade just isn’t gonna be useable – decision time…

Reconfigured Layout The upper loop was shortened, eliminating the 12’ bridge across upper loop (too expensive and too much engineering). With no switches at all, the upper loop is now isolated – and the shortened aspect creates tracks crossing at different elevations, which has more visual interest…

Transition grade has been abandoned – track passes behind upper loop risers, crossover returns it to inner loop – very interesting solution!

Bachmann Blue Comet pass set pulls into station loop – upper loop is visible and now shortened (about 4 ft), so it crosses over the lower loop

Opposite side where dual loops pass at different elevations. Lower inside track is a storage spur added as part of this reconfiguration. This spur view will be hidden behind an eventual mountainside, if not all three tracks.

Open side looking at spur switch, and the two lower loops that straddle this warehouse and watering facility. Two men load flour into a pickup. The rear track geometry was pushed out to accommodate the warehouse.

Here the Blue Comet crosses the lower bridge, while the MTH Hudson NYC pulls heavyweights around the upper loop. Eventually all tracks will have bridges here and a water feature will be modeled high to low.

The Blue Comet will crossover (slide 9) to the inner loop here, bypass the station. The lamplights between tracks are operational. Note the switch…

The lower loop features this reversing crossover to create eastbound from westbound travel, and back. One direction will require backing across.

View of the upper loop with the MTH Hudson NYC barreling at us, pulling three Aristocraft heavyweight cars. I love this loco!

One more view of the MTH Hudson NYC over the shortened end. The added lower spur is visible below with freight cars backed in. Yes, that is a 20’ soldering gun along side the spur awaiting shipping!

In closing… Q: Do I continue working on indoor scenery (which I hate doing) or is it time to move outdoors – here’s what I have to work with…

Backyard photos – I have a nice deck overlooking the backyard with a walkout basement door just visible to the left, but lots of slope here.

Ah ha! This is the future – about a 30’ by 60’ area that starts just past the lighthouse – the area this side of it is the leach field; better to not build over that in case we ever need to dig it up.

If anyone has any suggested tracks plans for a 30’ by 60’ area, I would love to trade ideas with you. Ideally I’d like two separate loops that parallel each other on one end (or both) with wide (20’) sweeping turns, yet room to walk into and around the rest of the layout. I would elevate the track to 24” inches to avoid bending over wherever possible. There is a slope to this area that drops 1-2’ over the 30’ width. Some trestles would be cool. I would like to integrate a water feature down the middle, running out from the house – a natural water direction. A long yard somewhere for storage (15’ perhaps) of 2-3 ladders. I love the idea of lighting this for evening running, so switch stands, buildings, track signals would all be lit. Other than that, surprise me!

HOLD THE PRESSES! 2011 brings new additions to the layout (which still has no name…) Granite chip ballast….partially done here…

South Bend Crossing Signals – the second one not connected yet

Added a passing track/spur off the inner loop – Revolution is ON and we’re talking to the engineer in the NS U25B getting ready to depart the station…

NYC U25B with Phoenix sound moves through the service end of the yard heading out

Hope you’ve enjoyed the show! The End