Amathole District Municipality NGQUSHWA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation HAMBURG 500 feasibility and review of housing.

Slides:



Advertisements
Similar presentations
Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.
Advertisements

Planning Permission Process and Procedures
Helen Bowden Nurses Home “Jewel of Granger Bay” PROVINCIAL REGENERATION PROGRAMME INVESTOR CONFERENCE 26 March 2014.
USAID Africa Bureau EIA Procedures for Sub-Projects
MODERN VENTURES (Pty)Ltd t/a NORTHERN GATEWAY CITY PORTION 2 OF 36-NQ
Planning Legislation – Prof. H. Alshuwaikhat ZONING Zoning is the division of a municipality, city or town into districts for the purpose of regulating.
Planning & Community Development Department 245 South Los Robles Avenue Predevelopment Plan Review City Council December 8, 2014.
Public Meeting Agenda – September 13, 2007 Provide an Update on the Committee’s Work Discuss Emerging Vision for Redevelopment of Town-owned Property.
An agency of the Department of Arts and Culture Presented by: 26 FEBRUARY 2014 SAHRA PRESENTATION TO THE PORTFOLIO COMMITTEE FORMAL PROTECTION OF DISTRICT.
Land Use Plan Pilot Overview Land Use Planning Meeting Bingwi Neyaashi Anishinaabek First Nation August 11, 2011.
Amathole District Municipality NKONKOBE LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation HOGSBACK 300 feasibility and review of housing.
Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation Nyanisweni 137 feasibility and review.
Chris Hani District Municipality EMALAHLENI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation DORDRECHT 800 feasibility and review of.
Municipal Infrastructure Grant Sport and Recreation 15 February 2005.
Amathole District Municipality AMAHLATHI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation DALIWE 900 feasibility and review of housing.
Presented by Christopher Msipu Phiri.  Location ◦ South Central part of Africa ◦ Landlocked Country with eight neighbors  Size ◦ Km2  Population.
Reshaping Trafford Council HALE LIBRARY BIDDERS PRESENTATION.
Chris Hani District Municipality LUKHANJI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation EZIBELENI INFORMAL SETTLEMENT 200 feasibility.
Preparing for an inspection Do you have instruction to inspect Have you got terms and conditions Fees paid Access details confirmed Preparing for an inspection.
ADD NAME/TITLE HERE Report on the outcome of Harry Gwala Informal Settlements Constitutional case 02 June 2010.
Feasibility Study GREAT KEI 6000 November 2013 PRELIMINARY DRAFT not for circulation.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
Chris Hani District Municipality LUKHANJI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation KOMANI PARK CRU feasibility and review of.
February 20, 2007 Macon County Planning Board. Structure Height Ordinance Allows construction to 4 stories or 48 feet, whichever is greater Measured from.
Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation JOE SLOVO 137 feasibility and review.
The SSMP Process 1. The Servicing and Settlement Master Plan A plan to encompass the community’s visions and ideas, while approaching planning and servicing.
Amathole District Municipality NGQUSHWA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation GERMAN VILLAGE 360 feasibility and review of.
Amathole District Municipality NKONKOBE LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation MSOBOMVU 500 feasibility and review of housing.
Amathole District Municipality NXUBA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation KUWAIT 100 feasibility and review of housing plan.
Amathole District Municipality NXUBA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation SOMERSET DRIVE 200 feasibility and review of housing.
PUBLIC MEETING Application for Zoning Amendment 60 – 80 9 th Street East Ontario Inc. in accordance with Section 34 of the Planning Act 6 May 2013.
Amathole District Municipality NXUBA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation SIZAKELE 400 feasibility and review of housing.
Chris Hani District Municipality ENGCOBO LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation NGCOBO MIDDLE INCOME 500 feasibility and review.
Amathole District Municipality AMAHLATHI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation MLUNGISI 2500 feasibility and review of housing.
Amathole District Municipality INXUBA YETHEMBA LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation MIDDELBURG MIDDLE INCOME 200 feasibility.
Chris Hani District Municipality EMALAHLENI LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation LADY FRERE 800 feasibility and review of.
Amathole District Municipality NGQUSHWA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation GLENMORE 1000 feasibility and review of housing.
Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation MAHLUBINI 348 feasibility and review.
Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation TSOMO EXT 3 (250) feasibility and review.
Amathole District Municipality MNQUMA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation MNGCWE 500 feasibility and review of housing.
Amathole District Municipality NGQUSHWA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation GCINISA 500 feasibility and review of housing.
Planning Commission Study Session: Preferred Plan July 23, 2015.
TRAP 5 th interregional meeting & Site Visits Limerick & Lough Derg, Ireland 9 th October 2013 CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional.
Corby North Eastern Sustainable Urban Extension. Corby North Eastern SUE Comprises 1.Priors Hall (Bela Partnership) 2.Weldon Park (Charles Church/Persimmon.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Amathole District Municipality GREAT KEI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation TAINTON 350 feasibility and review of housing.
Planning & Community Development Department Olivewood Village Project (530, 535 E. Union St., 95, 99, 119 N. Madison Ave. and 585 E. Colorado Blvd.) Predevelopment.
STAMFORD CAPACITY AND LIMITS TO GROWTH STUDY SOUTH KESTEVEN DISTRICT COUNCIL FINAL REPORT PRESENTATION PRESENTERS: UNA McGAUGHRIN JESSE HONEY 14 TH DECEMBER.
MONDAY 2 DECEMBER 2013 STRATEGIC ENVIRONMENTAL ASSESSMENT (SEA) FOR INTEGRATED URBAN DEVELOPMENT MASTER PLAN (NIUPLAN) FOR THE CITY OF NAIROBI SUB COUNTY-
Mandeni Municipality Multi Year Housing Plan To house every resident of Mandeni in a sustainable and affordable way, with the necessary services, in progressive.
Amathole District Municipality NKONKOBE LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation BALFOUR 600 feasibility and review of housing.
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
Architectural Drafting
MBABANE INFORMAL SETTLEMENTS UPGRADING PROJECT EXPERIENCE
PRELIMINARY DRAFT not for circulation
CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional Authority
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PUBLIC PARTICIPATION MEETING FOR CONSTRUCTION OF A 400KV ±250 KM POWER LINE FROM BORUTHO S/S IN MOKOPANE TO BOKMAKIERIE S/S IN NZHELELE & ASSOCIATED SUBSTATION.
Application for Zoning Amendment
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
Presentation transcript:

Amathole District Municipality NGQUSHWA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation HAMBURG 500 feasibility and review of housing plan for HAMBURG 500

Feasibility and Review of Housing Plan HAMBURG 500 March 2014 by prepared for CNdV africa (Pty) Ltd environmental planning, urban design, landscape architecture 17 New Church Street Cape Town 8000 Tel: Fax: Kantey & Templer PO Box Beacon Bay, 5205 Tel: IQ Vision 110 Sarel Cillier Street Strand 7140 Tel: EASTERN CAPE DEPARTMENT OF HUMAN SETTLEMENTS Phillip Frame Road Chiselhurst Tel: +27 (0) NGQUSHWA LOCAL MUNICIPALITY PO Box 539, Peddie, 5640 Tel: (040) Fax: (040)

HAMBURG 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 October 2015 page 5 CONTENTS 2.1INTRODUCTION 2.1.2Purpose of the Report 2.1.2Background of this Report 2.1.3Terms of Reference 2.1.4Background to Settlement 2.2Status of Housing Project and Waiting List 2.3Land Identification and Ownership 2.4Engineering 2.5Environment 2.6Geo-tech 2.7Distribution of Social Facilities 2.8Current Spatial Development Framework 2.9Future Plans of Other Sector Departments 2.10Approval by Council 2.11Summary and Recommendations LIST OF FIGURES Figure 2.1.1Locality Plan Figure 2.1.2Aerial Photograph Figure 2.1.3Visual Survey Figure 2.2.1Statistical Background Figure 2.3.1Cadastral Layout Figure 2.4.1Engineering Figure 2.5.1Environment Figure 2.6.1Geo-tech Figure 2.7.1Distribution of Social Facilities Figure 2.8.1Current Spatial Development Framework LIST OF ANNEXURES Annexure 1 Ownership Annexure 2Title Deed Annexure 3Surveyor General diagram

HAMBURG 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 October 2015 page 6 CONTENTS GLOSSARY Informal Site : A Site occupied by a household or to which a household has customary rights, e.g. Permission to occupy (PTO, no longer formally in use) or community agreement via a meeting of elders including headman or chief. Formal Site : A site occupied by a household or to which a household is entitled to have a registered right recorded at the Deeds Registry with a title deed and surveyors diagram and/or registered General Plan. However, in many instances title deeds have not been issued nor ownership registered. In-Situ upgrade project : Formalising of tenure and installation of services and possibly also construction of a subsidised dwelling on land on which people are already living. Generally refers to a project larger than one unit. Greenfields project : New project site which there has been no formal or informal settlement, industry, infrastructure to date. Project sites are often outside of existing urban development. Infill Project : New project site within existing urban development usually on under utilised or vacant land and which often can help to promote physical integration between spatially isolated parts of the settlement. Rectification projects : Repair or rebuilding of defective existing houses built through one or other government housing program. Erven : The plural of ‘erf’ meaning plots of land each registered as an ‘erf’ in a deeds registry and forming part of a registered General Plan. Plots : The plural of ‘plot’ meaning unregistered pieces of land informally laid out. Portion: A plot of land forming part of a proposed or approved (by LM Council) subdivision layout but which has not yet been registered by the Surveyor General as a general plan and for which erf numbers have not yet been registered. ACRONYMS ECDHSEastern Cape Department of Human Settlement EIAEnvironmental Impact Assessment GPGeneral Plan HSPHuman Settlement Plan LMLocal Municipality MHSPMunicipal Human Settlement Plan SA South Africa SANBISouth African National Biodiversity Institute SDFSpatial Development Framework

HAMBURG 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 October 2015 page 8 INTRODUCTION PURPOSE OF THE REPORT The purpose of this report is to describe the key elements to be taken into account when assessing the feasibility of HAMBURG 500 as a Human Settlement Project and to recommend whether it should be approved or not BACKGROUND TO THIS REPORT This report is one of six Human Settlement Project feasibility reports for Ngqushwa Municipality. It is designed so that it can be part of a single document that includes the other five projects TERMS OF REFERENCE (Part C.3 Scope of work Tender No. SCMU11-12/13-A0240) The project terms of reference for the feasibility report are summarised as follows: Ascertain the feasibility of the project within each MHSP. The study shall reveal the developmental opportunities and constraints in relation to: 1.Determination of housing demand and potential beneficiary status 2.Land identification and ownership 3.Availability of bulk services and confirmation of capacity 4.Environmental conditions; 5.Geo-technical conditions 6.Alignment with Municipal Spatial Planning 7.Visual survey (area visits) 8.Future development plans of other sector departments 9.Provision of recommendation and proposals to ECDHS 2.1.4BACKGROUND TO SETTLEMENT Registered Owner:Unknown Property Description: Erf 798 Hamburg Title Deed Restrictions:Unregistered Property Servitudes: N/A (See Annexure 3) Site Size:47 Ha Hamburg 500 is within the jurisdiction of Nqqushwa Municipality. Hamburg is a village of approximately (Census 2011) people located on the Sunshine Coast of Ngqushwa Municipality on the south- east corner of the municipal boundary. It is approximately 241 km east of Port Elizabeth and 91 km west of East London on a gravel road taking access from the R72 Road. It is located on the Keiskama River estuary and is popular with tourists. The site is situated in Hamburg on the west side of the main road approximately 15 km from the R72 road. Taking into account the size of the site at 47 hectares; if 60% (28.2 Ha) is used for residential purposes, with an average plot size of 300m², a total of 940 units can be provided on the site.

HAMBURG 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 October 2015 page 9 Locality Plan Figure 2.1.1

HAMBURG 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 October 2015 page 10 Aerial Photograph Figure 2.1.2

HAMBURG 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 October 2015 page 11 VISUAL SURVEY Figure a. Road leading into the siteb. View looking east from the sitec. Industrial activities in the area. d. Development Board for envisaged upgrade of Hamburg towne. Existing traditional houses on the sitef. View of the site looking to the west

HAMBURG 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 October 2015 page 12 STATUS OF HOUSING PROJECTS AND WAITING LISTS subsidies have been proposed for Hamburg. The project will be split between a project linked subsidy onto greenfield site and onto existing erven demarcated on a registered general plan. Housing waiting lists have been requested from the municipality and are still awaited for this project. HAMBURG 500 Population (Ngqushwa SDF 2010)Not Specified Population (2011 Census)1 348 Ex. Units (Ngqushwa SDF 2010)Not Specified No. Households (2011 Census)453 Proposed Subsidies (EC DHS)500 Waiting List (Ngqushwa LM)Awaited Figure 2.2.1Statistical Background

HAMBURG 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 October 2015 page 13

HAMBURG 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 October 2015 page 14 LAND IDENTIFICATION AND OWNERSHIP 2.3 The land on which Hamburg 500 is located is Erf 798, Hamburg - subdivided from Erf Erf 798 appears on a registered General Plan No. 7875/1998. It was registered with the Surveyor – General on 19/01/1999, see Annexure 3. It comprises approximately 390 residential erven about 300m² - 400m² each. The erven however appear not to be registered with the Deeds Office.

HAMBURG 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 October 2015 page 15 Cadastral Layout Figure 2.3.1

HAMBURG 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 October 2015 page 16 ENGINEERING (Kantey and Templer) 2.4 BULK SERVICES Existing Services.... INTERNAL SERVICES Existing Services.... GEOTECHNICAL CONDITIONS.... EXISTING INTERNAL SERVICES ARE ADEQUATE AND REQUIRE NO UPGRADING Await K&T TOP STRUCTURE... TRAFFIC IMPACT ASSESSMENT... ROADS AND ACCESSIBILITY... THE PROJECT IS FEASIBLE FOR DEVELOPMENT OF HUMAN SETTLEMENTS.

HAMBURG 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 October 2015 page 17 Engineering (Kantey and Templer) Figure 2.4.1

HAMBURG 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 October 2015 page 18 ENVIRONMENT 2.5 Hamburg is situated along the Sunshine Coast. The site concerned is partially subdivided and sitting on relatively gentle slopes. These will not be a constraint for development. It occupies a spur across from a tributary of the Keiskamma River that divides the site from the remainder of Hamburg Commonage to the south. The Hamburg Nature Reserve forms the extent of the formerly protected area in Hamburg, see Fig The Eastern Cape Biodiversity Plan (ECBCP), 2007 has developed four terrestrial Biodiversty Land Management Classes (BLMCs) according to the terrestrial Critical Biodiversity Areas (CBAs). Each BLMC sets out the desired ecological state that the area should be kept in to ensure biodiversity persistence. The site falls within CBA 1 as per SANBI data (2007) and therefore is subject to BLMC 1 guidelines according to the ECBCP. This must be ground truthed by a Professional Botanist prior to undertaking the Human Settlement Project. BLMC 1 permits no development to take place and should be preserved and protected in its natural state. However, it can be seen on Figure that CBA 1 is shown as extending over all of the urban areas of Hamburg. This is clearly incorrect and the mapping of CBAs in this vicinity has not been ground truthed and amended. Therefore, subject to a site inspection by a botanist, no EIA will be necessary as a result of it being a CBA 1 site. The Keiskamma River flows approximately 300m from the site across the main road. Though it is a significant water course in the area it does not threaten the human settlement project as it lies significantly further than 32m as required by the National Environmental Management Act (NEMA) EIA regulations, see Fig The current layout is further than 32m from the Keiskamma River tributary flowing along the southern boundary of the site.

HAMBURG 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 October 2015 page 19 Environment Figure 2.5.1

HAMBURG 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 October 2015 page 20 GEO-TECH 2.6 Preliminary and Phase 1 geotechnical site investigations are required to obtain a more accurate evaluation of the development potential of each site, but the initial indications are that the geology is unlikely to pose a significant threat to the further development of these areas. Some potential geotechnical constraints have been identified for further investigation which may have an impact on the extent of the developable land and/or the development costs. The recommended typical foundations for subsidy housing are conventional strip foundations or light rafts to cater for variations in soil profile and minor soil movements. On sloping terrain, some earthworks and retaining walls may be required to create level platforms for houses and this can have significant cost implications. Foundations should be placed on well compacted natural soil, engineered fill or rock. Founding conditions will have to be inspected by the engineer to confirm suitable soil conditions with adequate bearing capacity and to check for any seepage or groundwater problems. In terms of the geotechnical information available, the proposed housing projects appear to be feasible and planning should proceed with further investigations on individual sites. Preliminary and Phase 1 geotechnical site investigations are required to obtain a more accurate evaluation of the development potential of each site, but the initial indications are that the geology is unlikely to pose a significant threat to the further development of these areas.

HAMBURG 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 October 2015 page 21 Geo-tech Figure The Site

HAMBURG 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 October 2015 page 22 DISTRIBUTION OF SOCIAL FACILITIES 2.7 There is a primary school and a combined school situated 1km – 2km from the site. The primary school particularly is situated more than a comfortable walking distance away and may require adequate scholar transportation to transport children to and from school see Figure The clinic is situated further approximately 2.3km from the site, which is outside of the desirable 1km walking distance to facilites, see Figure The police station servicing Hamburg is within easy walking distance just over 1km to the south-east of the site see Figure The project is aimed at existing beneficiaries already catered for by the facilities. This proposed Human Settlement Project will not require provision of additional facilities.

HAMBURG 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 October 2015 page 23 Distribution of Social Facilities Figure 2.7.1

HAMBURG 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 October 2015 page 24 CURRENT SPATIAL DEVELOPMENT FRAMEWORK 2.8 The Ngqushwa SDF makes the following proposals for Hamburg : Hamburg is envisaged for the following, see fig : −To be a tourist / Holiday destination −For Heritage and Cultural Adventure based tourism −For Eco- tourism −For Development of a tourism association −And the development of an Oyster farm. It is proposed that these elements are to be supported by a Master Plan to guide development in the area as well as the mapping of heritage sites and tourism nodes. The proposed Human Settlement Project does not contravene SDF proposals for Hamburg.

HAMBURG 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 October 2015 page 25 Current Spatial Development Framework Figure The Site

HAMBURG 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 October 2015 page 26 FUTURE PLANS OF OTHER SECTOR DEPARTMENTS 2.9 The following table indicates future plans of other sector departments proposed in the various settlements as contained in the IDP

HAMBURG 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 October 2015 page 27 APPROVAL BY COUNCIL 2.9 Awaiting Council Resolution

HAMBURG 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 October 2015 page 28 SUMMARY AND RECOMMENDATIONS SUMMARY There are adequate engineering services. (K&T to confirm) In Terms of ECBCP BLMCs that apply to CBA 1 that covers the site, settlements are not permitted. It is recommended that the site be assessed by a Botanist to ground-truth the extent of CBA 1 on the site prior to the Human Settlement Project implementation. A detailed geo-technical site visit inspection and, if necessary, survey will be required prior to the project commencing. It comprises an already approved submission layout of approximately 390 erven whose General Plan is still to be registered. The project comprises 500 subsidy units onto existing plots and greenfield. The beneficiary list from the municipality for this project is still awaited. There are no new social facilities required to support the proposed human settlements project. The Human Settlement Project is in line with the SDF. Awaiting Council Resolution from the municipality RECOMMENDATIONS The project is feasible, however pending a technical assessment by a Botanist to ground truth the extent of CBA 1 on the site.

HAMBURG 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 October 2015 page 29 ANNEXURE 1: OWNERSHIP PRINTOUT

HAMBURG 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 October 2015 page 30

HAMBURG 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 October 2015 page 31 ANNEXURE 2: TITLE DEED

HAMBURG 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 October 2015 page 32

HAMBURG 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 October 2015 page 33 ANNEXURE 3: SURVEYOR GENERAL DIAGRAM

HAMBURG 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd14 October 2015 page 34