Forecasting and Verifying the Energy Savings for Web-Enabled Thermostats in Portable Classrooms: William E. Koran, P.E. Quantum Energy Services and Technologies.

Slides:



Advertisements
Similar presentations
Portable Classroom Controls Project Chuck Collins RCM Meeting April 27, 2007.
Advertisements

Step Up Payback Proposal Program “How-To” 9/4/07.
Irwin/McGraw-Hill © Andrew F. Siegel, 1997 and l Chapter 12 l Multiple Regression: Predicting One Factor from Several Others.
BPA Guidelines for Measurement & Verification of Energy Efficiency Measures Presented at Brown Bag Session November 29, 2006.
Regression Analysis Once a linear relationship is defined, the independent variable can be used to forecast the dependent variable. Y ^ = bo + bX bo is.
Energy Performance Analysis with RETScreen
+ Impact Evaluations and Measurement and Verification First we will focus on ‘Gross Savings’ Determination - savings determined irrespective of why 1 Kentucky.
MEASUREMENT & VERIFICATION
There is Much More to Protocols than Good M&V Steve Kromer Chair, IPMVP Inc. Paolo Bertoldi European Commission DG JRC.
ISO 50006: The new ISO standard for energy baselines and performance indicators Ian Byrne, Deputy Chief Executive National Energy Foundation
Chapter 12 - Forecasting Forecasting is important in the business decision-making process in which a current choice or decision has future implications:
Steven Carlson, P.E. CDH Energy Corp. Evansville, WI ASHRAE Chicago, 2006 Energy Benchmarking.
Statistical Methods for long-range forecast By Syunji Takahashi Climate Prediction Division JMA.
Simple Linear Regression Analysis
Statistics for Managers Using Microsoft Excel, 4e © 2004 Prentice-Hall, Inc. Chap 13-1 Chapter 13 Introduction to Multiple Regression Statistics for Managers.
Manufactured Homes Calibration: Existing and New Homes Mohit Singh-Chhabra & Josh Rushton RTF Update May 12, 2015.
1 Doing Statistics for Business Doing Statistics for Business Data, Inference, and Decision Making Marilyn K. Pelosi Theresa M. Sandifer Chapter 11 Regression.
Introduction to Linear Regression and Correlation Analysis
Statistics for Managers Using Microsoft Excel, 4e © 2004 Prentice-Hall, Inc. Chap 12-1 Chapter 12 Simple Linear Regression Statistics for Managers Using.
3 CHAPTER Cost Behavior 3-1.
Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30,
Chapter 14 Introduction to Multiple Regression Sections 1, 2, 3, 4, 6.
Introduction to SAS Essentials Mastering SAS for Data Analytics
Term 2, 2011 Week 1. CONTENTS Types and purposes of graphic representations Spreadsheet software – Producing graphs from numerical data Mathematical functions.
Cost Behavior Analysis
Predicting Cost Behavior Chapter 2, Appendix 2A ACCTG 404 A2A-1.
Chapter 8: Regression Analysis PowerPoint Slides Prepared By: Alan Olinsky Bryant University Management Science: The Art of Modeling with Spreadsheets,
Why Normal Matters AEIC Load Research Workshop Why Normal Matters By Tim Hennessy RLW Analytics, Inc. April 12, 2005.
PACE Technical Standards Eddy Trevino, P.E., Program Manager State Energy Conservation Office August 2015.
Agricultural Irrigation Pump Variable Frequency Drive Provisional Standard Protocol Proposal Regional Technical Forum April 16, 2013.
M&V Part 2: Risk Assessment & Responsibility Allocation.
Reviewing the Audit Results. Defining a Quality Base Year is Key to Maximizing Project Value n Base year is the mutually agreed upon pre-retrofit annual.
Chilling at Penn: Weather-Analysis of Load Tool (WALT) Abstract: Penn’s MOD 7 plant supplies chilled water to the entire campus for its air- conditioning.
“Do Green” Two Options: Prescriptive Custom Prescriptive- -Must be running a MODULATING ROTARY SCREW AIR COMPRESSOR -Must be 75 Horsepower or Less Custom-
July 26, 2014 Refrigeration Subcommittee Proposed Revision of Refrigeration Provisional Data Requirements.
ERCOT Long-Term Demand and Energy Forecasting February 20, 2007 Bill Bojorquez.
1 Presented to ERCOT Retail Market Subcommittee January 9, 2002 Profiling Working Group Darryl Nelson, Chair Load Profiling Operating Guides (LPOG)
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
Demand Response and the California Information Display Pilot 2005 AEIC Load Research Conference Myrtle Beach, South Carolina July 11, 2005 Mark S. Martinez,
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee February 22, 2012 Mira Vowles, P.E., CEM.
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
M&V Part 4: M&V Plan Review. 4-2 M&V Plan Review Ø FEMP Documents F M&V Overview Checklist (Phase 2) F Final M&V Plan Checklist (Phase 3) Ø Risk & Responsibility.
Forecasting and Verifying Energy Savings for Web-Enabled Thermostats in Portable Classrooms: William E. Koran, P.E. Quantum Energy Services and Technologies.
Chapter 11 Linear Regression Straight Lines, Least-Squares and More Chapter 11A Can you pick out the straight lines and find the least-square?
RTF Custom Protocols: Background, Issues and Critical Elements February 8, 2012 Regional Technical Forum Subcommittee on Impact Evaluation and Custom Protocol.
Managerial Economics Demand Estimation & Forecasting.
Lecture 8 Simple Linear Regression (cont.). Section Objectives: Statistical model for linear regression Data for simple linear regression Estimation.
Chapter 4 Linear Regression 1. Introduction Managerial decisions are often based on the relationship between two or more variables. For example, after.
A Process Control Screen for Multiple Stream Processes An Operator Friendly Approach Richard E. Clark Process & Product Analysis.
10B11PD311 Economics REGRESSION ANALYSIS. 10B11PD311 Economics Regression Techniques and Demand Estimation Some important questions before a firm are.
1 Limestone County School District Energy Update Year Eleven Report September 2008 – August 2009.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee August 28, 2013 Mira Vowles, P.E., CEM.
Forecasting l and of _______________________ » : use of _______/ mathematical modeling » : _______!
Proposed Rooftop HVAC Standardized Field Measurement Protocol and Annual Savings Calculator RTUG REVIEW January 31, 2012.
1 Doing Statistics for Business Doing Statistics for Business Data, Inference, and Decision Making Marilyn K. Pelosi Theresa M. Sandifer Chapter 12 Multiple.
Comparison of CA Evaluation Protocols, CA Framework, IPMVP and CPUC Policy Manual* A preface to group discussion *In terms of how they define.
EXCEL DECISION MAKING TOOLS BASIC FORMULAE - REGRESSION - GOAL SEEK - SOLVER.
A Reliable but Simplified Method for Measuring the Savings from Advanced RTU Control Retrofits February 13, 2013 Presentation to: RTF Commercial Rooftop.
Regional Technical Forum Recommissioning commercial retail facilities: A whole building approach to energy savings April 7th, 2009 Presented by: Jeremy.
Methodology for Demand Forecasts for Bandera Electric Cooperative, Inc. Brian D. Bartos, P.E. Manager, Engineering Presented to ERCOT Reliability & Operations.
REBUILD AMERICA. Why look at the bills? l Bills are the bottom line –they prove the savings!
EXCEL DECISION MAKING TOOLS AND CHARTS BASIC FORMULAE - REGRESSION - GOAL SEEK - SOLVER.
Chapter 14 Introduction to Regression Analysis. Objectives Regression Analysis Uses of Regression Analysis Method of Least Squares Difference between.
F5 Performance Management. 2 Section C: Budgeting Designed to give you knowledge and application of: C1. Objectives C2. Budgetary systems C3. Types of.
A Calculator for Reliably Measuring the Savings from Advanced RTU Control Retrofits August 27, 2015 Presentation to: RTF Commercial Rooftop Unit Working.
Amy Allen, David Jump, Raphael Vitti, kW Engineering
STA 282 Introduction to Statistics
© 2017 by McGraw-Hill Education
Behavior Modification Report with Peak Reduction Component
Presentation transcript:

Forecasting and Verifying the Energy Savings for Web-Enabled Thermostats in Portable Classrooms: William E. Koran, P.E. Quantum Energy Services and Technologies Mira Vowles, P.E. Bonneville Power Administration A Spreadsheet M&V Tool Developed for BPA

Contents Need for this tool Need for this tool IPMVP Option C IPMVP Option C Tool Introduction and Demo Tool Introduction and Demo Forecasting Forecasting Statistics and Uncertainty Statistics and Uncertainty Potential Enhancements Potential Enhancements Comments, questions, additional ideas for enhancements Comments, questions, additional ideas for enhancements

Need for this Tool

Measurement and Verification Definition M&V is the process of using measurement to reliably determine actual savings. M&V is the process of using measurement to reliably determine actual savings. Verification of the potential to generate savings should not be confused with M&V. Verification of the potential to generate savings does not adhere to IPMVP since no site energy measurement is required. Verification of the potential to generate savings should not be confused with M&V. Verification of the potential to generate savings does not adhere to IPMVP since no site energy measurement is required. The intent of this tool is to provide true M&V. The intent of this tool is to provide true M&V.

Visualization of Savings Chart is similar to IPMVP Figure 1, Example Energy History BaselinePost

IPMVP Savings Reporting Options Reporting Period Basis (“Avoided Energy Use”) Reporting Period Basis (“Avoided Energy Use”) Baseline is Projected to Reporting Period ConditionsBaseline is Projected to Reporting Period Conditions Avoided Energy Use = Projected Baseline Energy Use minus Actual Reporting Period Energy UseAvoided Energy Use = Projected Baseline Energy Use minus Actual Reporting Period Energy Use Fixed Conditions Basis (“Normalized Savings”) Fixed Conditions Basis (“Normalized Savings”) Baseline and Post period energy use are Projected to a set of fixed conditionsBaseline and Post period energy use are Projected to a set of fixed conditions Normalized Savings = Projected Baseline Energy Use minus Projected Post Energy UseNormalized Savings = Projected Baseline Energy Use minus Projected Post Energy Use

IPMVP Option C  Whole Facility Savings are determined by measuring energy use at the whole facility level. Savings are determined by measuring energy use at the whole facility level. Most commonly, utility meter data is used for the energy use measurement. Most commonly, utility meter data is used for the energy use measurement. Routine adjustments are required, such as adjustments for weather conditions that differ between pre-and post. Routine adjustments are required, such as adjustments for weather conditions that differ between pre-and post. Routine adjustments are often made using regression analysis Routine adjustments are often made using regression analysis

Approach Taken by this Tool This Tool Uses a Fixed Conditions Basis. This Tool Uses a Fixed Conditions Basis. The Energy Use is projected for a typical year, using TMY3 weather data. The Energy Use is projected for a typical year, using TMY3 weather data. Routine adjustments are made using regression analysis Routine adjustments are made using regression analysis

Tool Introduction: Worksheets Instructions Instructions User Interaction User Interaction BillingDataBillingData WthrQueryWthrQuery WthrDataWthrData Outputs Outputs ForecastSavingsForecastSavings VerifiedSavingsVerifiedSavings Background Calculations Background Calculations PastProjectsData Calcs RegressionBase RegressionPost

Tool Introduction: Calculation Approach Based on ASHRAE Guideline Measurement of Energy & Demand Savings, Annex D, Regression Techniques Based on ASHRAE Guideline Measurement of Energy & Demand Savings, Annex D, Regression Techniques Independent Variable Independent Variable Average Heating Degree-Hours per Day during billing period (base 65 ºF)Average Heating Degree-Hours per Day during billing period (base 65 ºF) Dependent Variable Dependent Variable Average kWh per Day during billing periodAverage kWh per Day during billing period

Tool Introduction: Weather Data Web Query of Hourly Temperatures for Nearest Site Web Query of Hourly Temperatures for Nearest Site Heating Degree-Hours are Calculated for Each Billing Period, divided by 24, and divided by the number of days in the billing period. Heating Degree-Hours are Calculated for Each Billing Period, divided by 24, and divided by the number of days in the billing period.

Tool Demo

Forecasting Savings For Proposed Projects Weather-dependent load is assumed to have the same relationship (slope) as past projects. Weather-dependent load is assumed to have the same relationship (slope) as past projects. Non-weather-dependent load is assumed to be proportional to number of scheduled hours. Non-weather-dependent load is assumed to be proportional to number of scheduled hours. Uncertainty Uncertainty uncertainty in the baseline regressionuncertainty in the baseline regression uncertainty in the post regression from past projectsuncertainty in the post regression from past projects uncertainty due to variation in the past projects.uncertainty due to variation in the past projects.

Statistics and Uncertainty International Performance Measurement and Verification Protocol, Volume 1, International Performance Measurement and Verification Protocol, Volume 1, ASHRAE Guideline , Measurement of Energy and Demand Savings, 2002, Annex B. ASHRAE Guideline , Measurement of Energy and Demand Savings, 2002, Annex B. CCC: Guidelines for Verifying Existing Building Commissioning Project Savings, Using Interval Data Energy Models: IPMVP Options B and C, CCC: Guidelines for Verifying Existing Building Commissioning Project Savings, Using Interval Data Energy Models: IPMVP Options B and C, National Institute of Standards and Technology. The NIST Engineering Statistics Handbook, National Institute of Standards and Technology. The NIST Engineering Statistics Handbook,

Statistics and Uncertainty BPA Regression Reference Guide (in revision) BPA Regression Reference Guide (in revision) Sections of Particular Relevance: Sections of Particular Relevance: Requirements for RegressionRequirements for Regression Validating ModelsValidating Models Statistical Tests for the Model Statistical Tests for the Model Statistical Tests for the Model’s Coefficients Statistical Tests for the Model’s Coefficients Additional Tests Additional Tests Plus, Tables of Statistical Measures

Statistics and Uncertainty T-statistic T-statistic The t-statistic is a measure of the statistical significance of a model’s coefficient. If it is greater than the comparison “critical” t-statistic, the coefficient is significant.The t-statistic is a measure of the statistical significance of a model’s coefficient. If it is greater than the comparison “critical” t-statistic, the coefficient is significant. Critical t-statistics are a function of the required (input) confidence level and the number of data points. For 24 data points, and a 90% confidence level, the critical t-statistic is 1.72Critical t-statistics are a function of the required (input) confidence level and the number of data points. For 24 data points, and a 90% confidence level, the critical t-statistic is 1.72

Statistics and Uncertainty Confidence Intervals Confidence Intervals Confidence intervals are a measure of the uncertainty of the regression line.Confidence intervals are a measure of the uncertainty of the regression line. The uncertainty in the savings is dependent on the regression uncertainty.The uncertainty in the savings is dependent on the regression uncertainty. The confidence intervals are a function of the t-statistic.The confidence intervals are a function of the t-statistic.

Verified Savings Uncertainty Meter data measurement uncertainty is assumed to be zero. Meter data measurement uncertainty is assumed to be zero. Uncertainty of baseline and post regressions are included. Uncertainty of baseline and post regressions are included. Uncertainty associated with the appropriateness TMY3 data is not included. Uncertainty associated with the appropriateness TMY3 data is not included.

Potential Enhancements Use a weighted regression. Use a weighted regression. Adjust the regression for summer occupancy. Adjust the regression for summer occupancy. Limit baseline to whole years. Limit baseline to whole years. Input project start and end dates (use 2 dates). Input project start and end dates (use 2 dates). Use Heating Degree-Hours for Forecast Savings as well as Verified Savings. Use Heating Degree-Hours for Forecast Savings as well as Verified Savings. Use variable-base heating degree-hours. Use variable-base heating degree-hours. Adjust heating degree-hours for the occupancy schedule. Adjust heating degree-hours for the occupancy schedule. Incorporate more completed projects in the forecasting. Incorporate more completed projects in the forecasting. Protect cell formatting. Protect cell formatting. Allow multiple weather sites in WthrData Allow multiple weather sites in WthrData Add capability to benefit from interval meter data Add capability to benefit from interval meter data

Comments and Questions

Thank You Bill Koran Quantum Energy Services & Technologies Mira Vowles Bonneville Power Administration

Statistics and Uncertainty

p-value p-value The p ‑ value is the probability that a coefficient or independent variable is not significantly related to the dependent variable.The p ‑ value is the probability that a coefficient or independent variable is not significantly related to the dependent variable. Rather than requiring an input confidence level as for the t ‑ statistic, the p ‑ value provides probability as an output.Rather than requiring an input confidence level as for the t ‑ statistic, the p ‑ value provides probability as an output.