1 BTeV Status  Collaboration Status New Groups  University of Iowa - C. Newsom (Pixels)  Institute of High Energy Physics (IHEP - Protvino) - A. Derevschikov,

Slides:



Advertisements
Similar presentations
A “BTeV” Hybrid Pixel Telescope for MTest David Christian May 4, 2007.
Advertisements

Quartz Plate Calorimeter Prototype Ugur Akgun The University of Iowa APS April 2006 Meeting Dallas, Texas.
W. Clarida, HCAL Meeting, Fermilab Oct. 06 Quartz Plate Calorimeter Prototype Geant4 Simulation Progress W. Clarida The University of Iowa.
DOE/NSF Review of ATLAS, 1 Mar 2000, BNL Muon MDT Front End Electronics (WBS 1.5.9) James Shank DOE/NSF Review of U.S. ATLAS Detector (with help from:
Description of BTeV detector Jianchun Wang Syracuse University Representing The BTeV Collaboration DPF 2000 Aug , 2000 Columbus, Ohio.
Doug Michael Jan. 12, First goal is to be ready to select an optimal technology in ~one year. –Demonstrate that fundamental technologies are ready.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
BTeV Trigger Architecture Vertex 2002, Nov. 4-8 Michael Wang, Fermilab (for the BTeV collaboration)
P. Karchin – PMTs for Scintillator Based Muon Systempage 11/7/2004 January 7, 2004 American Linear Collider Physics Group 2004 Workshop Stanford Linear.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
Update on the RICH Beamtest The RICH Group M. Artuso, S. Blusk, C. Boulahouache, J. Butt, O. Dorjkhaidav, A. Kanan, N. Menaa, R. Mountain, H. Muramatsu,
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
LBNE R&D Briefing May 12, 2014 LBNE R&D Briefing May 12, 2014 LArIAT and LBNE Jim Stewart LArIAT EPAG Chair BNL LBNE LARIAT-EPAG J. Stewart BNL T. Junk.
David L. Winter for the PHENIX Collaboration PHENIX Silicon Detector Upgrades RHIC & AGS Annual Users' Meeting Workshop 3 RHIC Future: New Physics Through.
US CMS Collaboration Meeting, May 19, PWO Crystal ECAL Ren-yuan Zhu California Institute of Technology May 19 th 2001.
BTeV – A Dedicated B Physics Experiment at the Tevatron Collider Klaus Honscheid The Ohio State University July 13, 2001.
PPARC forum on developments in scintillator technology R M Brown - RAL 1 Scintillating Crystals for Particle Physics Outline  Performance considerations.
The HyCal Calorimeter A. Gasparian NC A&T State University, Greensboro, NC Outline  The crystal modules  The frame and transporter  Temperature stability.
8/22/01Marina Artuso - Pixel Sensor Meeting - Aug Sensor R&D at Syracuse University Marina Artuso Chaouki Boulahouache Brian Gantz Paul Gelling.
Shashlik type calorimeter for SHIP experiment
Calorimetry: a new design 2004/Sep/15 K. Kawagoe / Kobe-U.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
Shower Containment and the Size of a Test Calorimeter Adam Para, September 6, 2006.
CALORIMETER system for the CBM detector Ivan Korolko (ITEP Moscow) CBM Collaboration meeting, October 2004.
Status of the MaPMT o Status quo o Ongoing work o Issues – mechanics – electronics – schedule o Conclusions LHCb meeting Milano Franz Muheim.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
F February 5, 2001 Pixel Detector Size and Shape David Christian Fermilab.
Muon trigger upgrades, missing since not aimed towards DOE funding PHENIX upgrades: view presented to DOE R&D $3.5M Construction $16.6M Au-Au p-p 200 Si-Si.
T. Sugitate / Hiroshima / PHX031 / Nov.01 The Photon Spectrometer for RHIC and beyond PbWO 4 Crystal Density 8.29 g/cm 3 Radiation length 0.89 cm Moliere.
ASIC R&D at Fermilab R. Yarema October 30, Long Range Planning Committee2 ASICs are Critical to Most Detector Systems SVX4 – CDF & DO VLPC readout.
MTest Pixel Telescope – Status Update David Christian September 11, 2007.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
Apollo Go, NCU Taiwan BES III Luminosity Monitor Apollo Go National Central University, Taiwan September 16, 2002.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
BTeV Hybrid Pixels David Christian Fermilab July 10, 2006.
C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , The DEPFET-Project: European Collaboration for a Pixel SuperBelle.
E. A. Albayrak, HCAL Meeting, Fermilab, Nov HE CALORIMETER DETECTOR UPGRADE R&D STATUS E. A. Albayrak for The University Of Iowa Fairfield University.
IEEE October 16-22, 2004 First Look at the Beam Test Results of the FPIX2 Readout Chip for the BTeV Silicon Pixel Detector First Look at the Beam Test.
High-resolution, fast and radiation-hard silicon tracking station CBM collaboration meeting March 2005 STS working group.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.
Particle Identification with the LHCb Experiment
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
1 Plannar Active Absorber Calorimeter Adam Para, Niki Saoulidou, Hans Wenzel, Shin-Shan Yu Fermialb Tianchi Zhao University of Washington ACFA Meeting.
Vertex detector R&D Work Plan in /3/11 Y. Sugimoto for KEK-Tohoku-TohokuGakuin-Niigata- ToyamaCMT Collaboration.
Electromagnetic Calorimeter for HADES at SIS100 Pavel Tlustý, NPI Řež Motivation Plans Current status Tests Outlook HADES Collaboration Meeting, Sesimbra,
B => J/     Gerd J. Kunde PHENIX Silicon Endcap  Mini-strips (50um*2mm – 50um*11mm)  Will not use ALICE chip  Instead custom design based on.
BTeV Beam Test Results Jianchun Wang Syracuse University Representing J.A. Appel, J.N. Butler, G. Cardoso, H. Cheung, G. Chiodini, D.C. Christian, E.E.
SVT – SuperB Workshop – Annecy March 2010
The LHCb Upgrade LHCb now Upgrade motivation New trigger and DAQ
SVT – SuperB Workshop – SLAC 6-9 Oct 2009
SiD Calorimeter R&D Collaboration
India in ILC-detector R&D in
SVT Issues for the TDR What decisions must be taken before the TDR can be written? What is the mechanism for reaching those decisions How can missing information.
Particle Identification in LHCb
Vishnu V. Zutshi For the NICADD team.
LSST Camera Detector Status
The Pixel Hybrid Photon Detectors of the LHCb RICH
BTeV Pixel Silicon Detector
Particle Identification with the LHCb Experiment
SVT – SuperB Workshop – Frascati Sept. 2010
Calice Tile-HCal and Tail-catcher/Muon Tracker
Perugia SuperB Workshop June 16-19, 2009
PANDA Forward Spectrometer Calorimeter (Shashlyk) status and plans
Presentation transcript:

1 BTeV Status  Collaboration Status New Groups  University of Iowa - C. Newsom (Pixels)  Institute of High Energy Physics (IHEP - Protvino) - A. Derevschikov, Y. Goncharenko, V. Khodyrev, A.P. Meschanin, L. V. Nogach, K. E. Shestermanov, L. F. Soloviev and A. N. Vasiliev (EM calorimeter) New People  Minnesota - A. Smith (Simulations)  Syracuse - R. Mountain (RICH & EM cal)  Syracuse - G. Majumder (EM cal simulations ) S. Stone 11/5/99

2 Pixel Test Beam Activities  Pixel tests - Great Results see Joel’s talk

3 Muon Tests  Muon tests tube design robust - no broken wires tubes are efficient > 95% on ArCO 2, with wide plateaus noise issues addressed  Straw tube tests planned but not started due to lack of resources

4 Electronics & DAQ Workshop  Organized with Ed Barsotti - Oct. 8-9, 1999  Preliminary front end designs for all BTeV systems  Data flow to L1 buffer specified  Trigger and readout specified  High Voltage systems discussed with CAEN on Nov. 4, 1999

5 Schedule: Simulations  Now Working: BTeV GEANT, trigger, Calorimeter code including clustering (needs to be tuned)  Fix detector geometry 12/18  Material Budget Studies (No, we don't require less material, but it would be nice) 1/7  Working interface to GEANT or MCFAST 1/1  Generate physics backgrounds (over Xmas holidays)  Finish final states requested by PAC: B o , D* -  +, B s  D s - K + 3/1  MCFAST studies of other processes 4/1

6 Oganization for Proposal - Pixels & Tracking  Pixels Groups: CMU, Fermilab, IIT, Iowa, Milano, Syracuse, Wisconsin Plan: Beam Tests of Fpix0, Fpix1 and path to final BTeV chip; engineering for full system asked for, but not yet provided  Tracking systems (straw tubes and silicon) Groups: Indiana, Milano, Tenn. Plan: Full system design

7 Schedule: Pixels  Beam test runs, finish 1/17  Analysis of test runs finish 3/1  Sensor delivery 2/15 Initial tests 2/15 – 3/30  0.25  CMOS, test chip 12/15, results 2/1  Pre FPIX2, submission 12/15, results 5/1  Bump bonding yield tests 3/1  HDI flex cable module test 3/1  Mechanical pre prototype 3/1

8 Oganization/schedule - RICH  Groups: Syracuse  Plan: Full design, aerogel tests, PMT or HPD choice Some aerogel samples procured, tests to start soon, finish 3/1 Met with Hamamatsu about multi-anode phototubes, will meet again in Dec. to discuss costs and delivery issues. Finalize design 4/1, full cost estimate 5/1

9 Oganization for Proposal - EM cal hardware  Groups: IHEP, FNAL, Minn., Syracuse, York  Plan: Full design including sizes, simulations, PMT choice, optimum readout (QIE) design IHEP & Minn. Groups in contact with PbWO 4 producers, discussion on crystal sizes, schedules, costs begun; trips soon Talks held at Syracuse with Hamamatsu about phototubes

10 Phototubes  Constraints Crystal size – 26 mm x 26 mm allows standard 1” tube. For 1 1/8” tube need 30 mm x 30 mm (still tight 1 1/8” = 29 mm)  We reject 24.7 mm 2 (baseline as too small, can only use ¾” tube, which KTeV does, but its too expensive  Note 26 mm 2 36,000 crystals (both arms) while 30 mm 2 gives “only” 27,000 Radiation Damage  Expect something like 140 Mrad, 10 year dose in worst place at 2 interactions/crossing  Can be handled with quartz window pm tubes from Hamamatsu. UV glass goes to 1/3 Mrad.  Russian FEU-115 tested to 34 Mrad (may be better) but is 29 mm diameter

11 Phototubes II High Quantum Efficiency Required  We are photon statistics limited  E =1.6%/  E  0.55%  Hamamatsu tubes may have larger light output Tube must also have good linearity at high current ~ 30 ma (KTeV ~ 80 ma)  Candidate Hamamatsu & FEU tubes identified. We will visit Hamamatsu in early Dec. to get cost and delivery schedule on 1” and 1 1/8” tubes

12 Schedule: Calorimeter  PbWO 4 – Get price and delivery schedules 3/1  Phototubes – Choice and cost estimate of baseline – 2/1  HV, bases, cable costs 3/1

13 Oganization/schedule - Trigger/DAQ  Organization Groups: CMU, FNAL, IIT Plan: Decide if two-plane trigger can work; demonstrate that trigger is of adequate speed; show that efficiency and rejection are adequate  Schedule Trigger hardware timing studies  Level 1 - 2/15  Level 2 – 4/1 Level 3 strategy 4/1

14 Schedule: Muons  Groups: Illinois, Pavia, Puerto Rico, Vanderbilt  Beam Backgrounds using STRUCT and GEANT (Vandy) 1/1 – 4/15  Trigger Development, Simulation, and Studies (PR, Ill., Vandy) 1/1 – 4/15  Complete Assembly and Testing of 2nd generation "plank" (design changes motivated by beam tests). Needed for accurate system cost estimate. (Vandy, Ill.) 1/15  Prototype work on readout electronics: both front-ends and downstream electronics: needed for accurate system cost estimate (Vandy) 1/15 – 4/15

15 Resources  BTeV R & D IS RESOURCE LIMITED  Have had difficulty with DOE providing funding for R & D for an experiment that is not approved. Bad Press?  We do not have enough money for all hardware tests, or enough engineering to do as good a job on the proposal as we are capable of doing  We will do our best, given the limited resources available. Some additional hardware funds and engineering resources from the lab would be most helpful

16 1 st GEANT – MCFAST Comparison GEANT MCFAST

17 GEANT