Integrated Grounding, Equipotential Bonding and Lightning Protection in Smart Grids and Smart Buildings – A Multi-Faced Approach Ladies and gentlemen,

Slides:



Advertisements
Similar presentations
Mitigation of AC Induced Voltage On Buried Metallic Pipelines
Advertisements

ELECTROMAGNETIC COMPATIBILITY Dr. Donald Church Senior Staff Engineer International Rectifier Automotive Systems November 17, 2005.
Mobile Radiographic Equipment. Introduction In-patients who could not leave their beds In-patients who could not leave their beds Surgeons who required.
Committed to connecting the world Ninth ITU Symposium on ICTs, the Environment and Climate Change Kochi, India, 15 December 2014 Damage prevention and.
EE4503 Electrical Systems Design
ASSIGNMENT TEACHER Smt. K.VASUMATHY GROUP MEMBERS:- MANSI DWIVEDI (ET 4 TH SEM) ARTI DWIVEDI (ET 4 TH SEM) DIKSHA CHANDRAKAR (ET 4 TH SEM) MAMTA CHOUDHARY.
STRAY CURRENT CORROSION
Designing a EMC Compatible Electronic Meter using AD7755 a.
Protection against Lightning Overvoltages Overvoltages due to lightning strokes can be avoided or minimized in practice by (d) shielding the overhead lines.
CIRCUIT ARRANGEMENT (Note: All the mentioned tables in this course refer to, unless otherwise specified, Low Voltage Electrical Installation Handbook,
AC Mitigation Overview
Lecture 1: Safety and Protection. 1. A robot may not injure a human being or, through inaction, allow a human being to come to harm. 2. A robot must obey.
Proposed Design and the Operation of a Disconnecting Device for Small EG Installations Prepared by Hendri Geldenhuys.
IHP Im Technologiepark Frankfurt (Oder) Germany IHP Im Technologiepark Frankfurt (Oder) Germany ©
How to efficiently use the electrical distribution underground cables for Power Line Communications and to achieve the Smart grid’s goals. Energy Smart.
PRESENTATION ON SUBSTATION DESIGN
Electrical Earthing D.K.Pathirana. Applications of earthing Protect human against lightning and earth fault condition Protect the premises against lightning.
UMKC Senior SUBSTATION DESIGN TEAM
Overvoltage Protection, A. Zeddam, Dakar, Senegal, 25 March 2015 ITU Regional Standardization Forum For Africa Dakar, Senegal, March 2015 Overview.
Overview of ITU-T Study Group 5 “Environment and Climate Change” Cristina Bueti, Adviser, ITU.
POWER FREQUENCY MAGNETIC FIELD MANAGEMENT IN POWER DISTRIBUTION SUBSTATION Prof. Ahmed A.HOSSAM-ELDIN Prof. Ahmed S.FARAG Electrical Engineering Department,
Protection against Electric Shock (Note: All the mentioned tables in this course refer to, unless otherwise specified, Low Voltage Electrical Installation.
Operational and Technical Requirements Rob Connatser Chief Instrument Project Engineer November 2014.
ELG4125 Transmission and Distribution Systems
Electrical Installation Practice 2
SWER New Zealand & Australian Experience
June SURVEY OF EUROPEAN DIRECTIVES European directives are based on the new approach in order to provide free movement of goods in the single market.
A PRACTICAL TRAINING SEMINAR ON PLCC
Prof R T KennedyEMC & COMPLIANCE ENGINEERING 1 EET 422 EMC & COMPLIANCE ENGINEERING.
Hoeffelman_BE_ALPHA 2_Block 1 Barcelona May EMI-EMF update Recent achievement and work going on in relevant WG’s Jean Hoeffelman ELIA- Belgium.
POWER HOUSE.
Measurement of High Voltages and Currents In industrial testing and research laboratories, it is essential to measure the voltages and currents accurately,
A common 400 Hz AC Power Supply Distribution System for CMS FEE. Authors C. Rivetta– Fermilab. F. Arteche, F. Szoncso, - CERN.
Frankfurt (Germany), 6-9 June 2011 Irina Melnik – the Netherlands – Session S2 – 0665 Intelligent Distribution Substation improves power quality.
Grounding.
Electrical Installation II1 Assessment of General Characteristics (Note: All the mentioned tables in this course refer to, unless otherwise specified,
A Training Presentation On 132 KV GSS JAIPUR Submitted in partial fulfillment For the award of the degree of BACHELOR OF TECHNOLOGY Submitted To:- Submitted.
132KV GSS PIPAR CITY JODHPUR
Closed Circuits In applications requiring the use of current, electrical components are arranged in the form of a circuit. A circuit is defined as a path.
Institute of Electrical Power Systems Institute of High Voltage Engineering and Systemmanagement NEW WAYS TO INTEGRATE GROUNDING, EQUIPOTENTIAL BONDING,
Presentation Topic: Circuit Breakers Represented to: Dr. M. Riaz Khan Represented by: M. Mujahid.
1 Transmission of Electrical Energy Electrical energy is carries by conductors such as overhead transmission lines and underground cables. The conductors.
ELECTRICAL EARTHING.
ITU Symposium on ICTs, the Environment and Climate Change Kuala Lumpur, Malaysia 21 April 2016 Session2: Damage prevention and safety Resistibility of.
ESS Grounding System Concept Fundamentals and Requirements
EMC issues for cabling and racks layout design. (Belle II – Grounding) F.Arteche.
EE 2353 HIGH VOLTAGE ENGINEERING Faculty Name :A.JAIBUNISHA Faculty Code : EE 58 Designation : LECTURER Department : EEE.
Chapter 3 PHYSICAL INJURY AND CONTROLS 3.2 Electrical Safety
F. Arteche EMC: Electronics system integration for HEP experiments (Grounding & Shielding)
SYNERGY INSTITUTE OF ENGINEERING AND TECHNOLOGY
Committed to connecting the world Overview of ITU-T SG5 Work on Damage protection and safety Guy-Michel KOUAKOU Chairman of Study Group 5 Regional Group.
Ground Bond and Ground Continuity Testing
IEEE NPEC SC2 Equipment Qualification Electromagnetic Compatibility Compliance Type Test-Design Considerations- Installation and Mitigation Standard/Guidance.
Graz University of Technology May 11th – 12th Maribor, Slovenia
Radio Base Stations Sited on Power Line Towers
PROTECTION AGAINST INDIRECT CONTACT
Grounding.
WELCOME TO ALL.
9. Deleterious effects of lightning and protective techniques
EARTHING.
Design of Electric Power Systems and Utilities
Power transmission Energy is lost in transmission lines
Optimization of the Energy-Supply-Structure of modern Aircraft by using conventional power system technologies Dipl.-Ing. Ilir Purellku Electrical Power.
EET 323 – Electrical System Design Lecture 9: Grounding
LIGHTNING AND INSULATIONS COORDINATION
1-2 Grounding Principles and CF Infrastructure in Instruments Halls
Electrical components and systems
HIGH VOLTAGE ENGINEERING Presented By P.Sindhu Asst.Prof EEE Dept
Grounding Myths.
Protection Requirements
Presentation transcript:

Integrated Grounding, Equipotential Bonding and Lightning Protection in Smart Grids and Smart Buildings – A Multi-Faced Approach Ladies and gentlemen, g‘day everyone. I would like to present you, a multi-faced approach to integrate grounding, equipotential bonding and lightning protection systems, with the focus on personal safety as well as on enhanced requirements concerning the functioning and reliability of electrical and electronic equipment and communication systems with narrow and broad band techniques Ernst Schmautzer, Stephan Pack, Maria Aigner, Chr. Raunig – Austria – Session 2 – 0760

Introduction Modern low-voltage grids and building installations  need to be suitable for a bidirectional energy and high-speed information flow considering the demands of high reliability  have also to fulfil requirements of ensuring safety and protection measures against electric shock, over-voltages, ohmic and inductive interference (EMC-EMI),… To guarantee the reliable functioning of necessary electronic equipment new concepts regarding integrated systems are a pre-condition starting from the transformer stations via the mains connection to the final location of the electrical / electronic equipment in the buildings. Modern low-voltage grids (smart grids) and building installations (smart buildings) need a bidirectional energy and high-speed information flow Technical solutions in smart grids and smart buildings have also to fulfil requirements of safety and protection measures against electric shock especially touch voltages and current flow, and they have to provide the basis for the reliable functioning of electronic equipment considering ICT, EMF, over-voltages, ohmic and inductive interference The whole path starting from the transformer stations via the mains connection to the final location of the electrical / electronic device in the buildings has to be considered to guarantee the reliable functioning Ernst Schmautzer – Austria – Session 2 – 0760 2

Introduction To provide the base for a safe and reliable use concerning low and transient effects in new build and revitalized buildings two approaches are presented:  The first approach includes the integration of grounding, bonding, lightning protection and shielding from the beginning of the planning and construction phase of the electrical installation  The second approach demonstrates the integration of a closed-meshed fish trap structure of grounding, bonding, lightning protection and shielding in case of refurbishment of old buildings To provide the base for a safe and reliable use in new built and refurbished buildings two approaches are presented The first approach includes an integrated grounding, bonding, lightning protection and shielding system in the entire building The second approach proposes in the case of refurbishment of old buildings the cheep and easy realization of a locally restricted closed-meshed / fish-trap-like structure instead of the solution with a overall-meshed-grid Ernst Schmautzer – Austria – Session 2 – 0760 3

Introduction Beginning in the planning phase, and continued in the implementation and examination state  grounding  equipotential bonding, shielding (EMC zones)  lightning protection (LPZ lightning protection zones) usually are considered separately This leads to a multitude of problems in practice caused by low-frequency and transient currents, such as  stray-currents  undesired interfering electromagnetic fields and  ohmic and inductive influences  transient currents caused by switching operations in the grid  transient currents caused by atmospheric discharges Beginning in the planning phase, and continued in the implementation and examination state  grounding,  equipotential bonding, shielding and  lightning protection zones usually are considered separately This leads to problems in practice caused by low-frequency and transient currents, such as  stray-currents,  undesired interfering electromagnetic fields  ohmic and inductive influences  transient currents caused by switching operations in the grid and  transient currents caused by atmospheric discharges Ernst Schmautzer – Austria – Session 2 – 0760 4

State of the Art (Standards) HD 60364-1: Low-voltage electrical installations – Part 1: Fundamental principles, assessment of general characteristics, definitions HD 60364-4-41: Low-voltage electrical installations – Part 4-41: Protection for safety - Protection against electric shock HD 60364-5-55: Low-voltage electrical installations – Part 5-54: Selection and erection of electrical equipment - Earthing arrangements, protective conductors and protective bonding conductors EN 50310: Application of equipotential bonding and earthing in buildings with information technology equipment EN 50173: Information technology - Generic cabling systems - Part 1: General requirements EN 50174: Information technology - Cabling installation - Part 2: Installation planning and practices inside buildings EN 50178: Electronic equipment for use in power installations EN 50122: Railway applications - Fixed installations - Electrical safety, earthing and the return circuit - Part 1: Protective provisions against electric shock EN 50522: Earthing of power installations exceeding 1 kV a.c. EN 62305: Protection against lightning EN 50162: Protection against corrosion by stray current from DC systems IEC TR 61000-5-2 ANSI/TIA/EIA-607 (USA) ANSI/TIA/EIA-568-B.1-2 (USA) BS 7671 (UK IEE Wiring Regulations) VDE 0100 (Germany) VDE 0800 Teil 174-2 VDE 0800 Teil 31 ITU-T OVE/ONORM E 8001-1: Erection of electrical installations with rated voltages up to ~ 1000 V a.c., HD 384 OVE/ONORM E 8383: Power installation exceeding 1 kV, HD 637 S1: 1999 OVE/ONORM E 8384: Earthing in AC installations with rated voltage higher than 1 kV OVE/ONORM E 8014: Erection of earthing installations for electrical installations with rated voltages up to AC 1000 V and DC 1500 V – Part 1: General requirements and definitions EMC, EMI … I prepared this slide just to show the sometimes confusing situation of uncoordinated international and national standards regulating each topic separately for instance - low voltage installation, - equipotential bonding, - lightning protection and - the entire field of ICT wiring - handling of shielding in energy and information systems. You can see harmonized documents, ENs, national German, Austrian, US standards and so on Ernst Schmautzer – Austria – Session 2 – 0760 5

State of the Art (Standards) EN 62305: Protection against lightning In this slide, some solutions coming from diverse standards are recapitulated On the upper left side you can see the single point grounding concept based on harmonizing document HD 60364, provoking sometimes the problem, that the star-point-connection conductor transports - in spacious buildings – the short circuit over long distances causing interferences that again have to be reduced as well Or on the right side of the slide you see the solution coming from EN 62305 “lightning protection” with an unique solution for lightning protection conductors, ignoring mainly the rest of the necessary bonding system Only in some IT standards, shown in the figures below especially in the series 50173, 4 and 8 (fifty-one-seventy three, four and eight) integrated earthing and equipotential bonding systems are proposed. On the other hand the lightning protection system is not considered here. HD 60364-1: Low-voltage electrical installations – Part 1: Fundamental principles, assessment of general characteristics, definitions Shielding EN 50174: MESH DI Dr. Ernst Schmautzer – Austria – Session 2 – 0760 6

Methodology – New Buildings The minimum level in most European countries (also in Austria) is preferably the establishment of a concrete footing-type grounding electrode system in the foundation area (base plate, granular sub-grade course, blinding concrete) In buildings with specific EMC requirements of information technology (especially for the reduction of magnetic interference fields, inductive and resistive influences by transient currents) the construction of an additional equipotential bonding system for each floor is essential The minimum level in most European countries is a concrete footing-type grounding electrode system in the foundation area with a mesh-grid distance of 10 x 20 meters to provide the fundamental protection level at low frequency for instance 50 Hz. In buildings with extended information technology and specific EMC requirements a more closed meshed grid is necessary and an additional equipotential bonding system for each floor is essential to realize a appropriate shielding and equibonding effect in the short circuit and lightning-relevant frequency range - some kHz to 1 MHz, Horizontal grid dimensions with a distance about 5 m or less and the integration of the concrete reinforcement in the walls are necessary. Ernst Schmautzer – Austria – Session 2 – 0760 7

Methodology – New Buildings To give you an impression of the application of the presented suggestions in new buildings You can see – depending on the basic concept of ICT in the smart building integrated in the smart grid structure, the fundamental grounding system as a basic requirement in Europe with grid dimensions from 10 x 20 m, down to 2.. 5 m to handle 50 Hz and transient currents vertical electrodes, - vertical equibonding rods integrated with the concrete reinforcement and the lightning protection system - horizontal equibonding in form of a variable designed meshed-grid - energy and ICT electrical installations, - single point grounding and/or better but more expensive - an equipotential bonding system instead.of the SPG Integrated grounding electrode system, shielding, equipotential bonding and lightning protection system Ernst Schmautzer – Austria – Session 2 – 0760

Methodology – New Buildings Combined high- and low-voltage grounding system Sensible ICT-components can be installed in all parts of the building structure It is important that the combined high- and low-voltage grounding system with narrow meshed grid has a low impedance, necessary to deal with problematic transients currents and leads to a quick spatial distribution and so reduction of disturbing currents. In consequence sensible ICT-components can be installed in all parts of the building structure. Ernst Schmautzer – Austria – Session 2 – 0760

Methodology – Old Buildings Most of the before mentioned measures concerning the low inductive meshed grounding, equipotential bonding and lightning protection system cannot be realized at low efforts and costs The proposal is, to invert the grounding and equipotential bonding system at spatially defined locations by realizing a fish trap like structure of conductors to achieve a preferably low impedant equipotential system As the grounding and equipotential bonding system changes to a predominate equipotential system the refurbished grounding system has now to meet only the demands of a proper lightning protection system and can be realized usually with vertical grounding rods In old buildings most of the mentioned measures cannot be realized at low efforts and costs. The proposal is now, to evert the grounding and equipotential bonding system to realize a fish-trap-like structure of conductors to achieve the necessary low ohmic and inductive equipotential system Ernst Schmautzer – Austria – Session 2 – 0760

Methodology – Old Buildings The fish-trap like equibonding structure provides a low impedance So protection and safety measures can easily be realized (equipotential and function equipotential bonding, overvoltage suppression) The low impedance equipotential system is provided only in dedicated areas in the near vicinity of the fish-trap like construction The fish-trap like equibonding structure the grid depicted on the right side of the slide provides the necessary low inductive network. The disadvantage of this concept is that the low impedance equibonding system is provided only in dedicated areas and that the whole building as shown before cannot be used for sensible electronic systems. Only the volume inside the fish-trap-like construction can be used mindless. Ernst Schmautzer – Austria – Session 2 – 0760 11

Conclusion Realising the grounding, equipotential bonding, shielding and the lightning protection system as well as considering EMC- and lightning protection-zones as a jointly co-ordinated system meets the requirements for  protection against electric shock,  minimizes resistive, inductive and capacitive interference,  reduces the occurrence of electromagnetic fields and  enables the implementation of high-quality measures for the electric/electronic equipment safety,  as well as a efficient lightning and surge protection Additionally the reduction of the data transfer rates caused by inductive and ohmic interference can be minimized The proposed grounding and equipotential bonding system can be used in new and refurbished buildings The integration in the design concept of architectural structures is easy The proposed system can be integrated easily, if early enough considered Coming to the conclusion we can summarize That if we realize the grounding, equipotential bonding, shielding and the lightning protection system as a jointly co-ordinated and integrated system the following tasks can be fulfilled:  protection against electric shock,  minimisation of resistive, inductive and capacitive interference,  reduction of electromagnetic fields  efficient lightning and surge protection Supporting shielded and unshielded ICT-concepts, with symmetrical and unsymmetrical transmission enabling high data transfer rates  and if early enough considered easy integration in the design concept of architectural structures in new and refurbished buildings Ernst Schmautzer – Austria – Session 2 – 0760

Integrated Grounding, Equipotential Bonding and Lightning Protection in Smart Grids and Smart Buildings – A Multi-Faced Approach Ladies and gentlemen, Thank you for your attention Ernst Schmautzer, Stephan Pack, Maria Aigner, Chr. Raunig – Austria – Session 2 – 0760 13