P14471 Vibration Testing Apparatus II Detailed Design Review 12/10/2013 Brett Billings Jacob Gardner Nick Greco Ron Jimbo Claire Kobal Ryan Selig Ashley.

Slides:



Advertisements
Similar presentations
1. Instrument Clusters Theory Support Automotive – Displays & Accessories 1 of 13 Instrument Clusters Topics covered in this presentation: Analog Instrument.
Advertisements

3.4.5 Student Book © 2004 Propane Education & Research CouncilPage Maintaining Bulk Plant Pumps, Strainers and Bypass Systems Knowing how to maintain.
Service Training PV Series 42 PVplus
Manual Transmission Fundamentals
InnoSys Process Sequence. End Effector Components End Effector Prox Switch Load Cell Wire Conduit Crows Foot Nut Runner.
Milling Machine Setups
Case-New Holland Steer-by-Wire Detailed Design. Today’s Agenda  Who is CNH?  Background  Project Goal  System Level Concept  Design Components 
Daniel Graves –Project Lead James Reepmeyer – Lead Engineer Brian Smaszcz– Airframe Design Alex Funiciello – Airfoil Design Michael Hardbarger – Control.
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only Publisher The Goodheart-Willcox Co., Inc. Tinley Park, Illinois.
Introduction to FLUID COPLING.
Available at: – Program Optical Quad Encoders in Autonomous Mode Program optical quad encoders in autonomous mode.
PIT Crew Design Concepts By Dan Chapman, Tim Wilson, and Jon Miller December 11, 2002.
Critical Design Review 12/7/04 Team Uno Bunker Curnes Shawn Houlahan Stephanie Rohrs Steve Schwall Chuck Smith.
Knowledge to Shape Your Future Electric / Gas / Water Information collection, analysis and application MekElekItroniks Design Review Battery Charger Project.
Senior Design: Validation of Design December 15, 2008.
Background Cooper Crouse-Hinds Industries is a leader in the manufacturing of luminaires, an encased lighting system, for hazardous locations. These luminaires.
Detailed Design Review Project P13363 Members: Justine Converse (IE) James Cover (CE) Alexander Eschbach (EE) Jason Hang (ME) Ashley Trode (EE) Guide:
1 P14471 Vibration Testing Apparatus II Final Review 5/13/2014 Brett Billings Jacob Gardner Nick Greco Ron “Sparky” Jimbo Claire Kobal Ryan Selig Ashley.
AccuMax Multi-Point Injection Mechanics
MSD P15280 RIT HOT WHEELZ TEST BENCH. AGENDA ❖ Detailed Design Review ➢ Competition Benchmarking ➢ Mechanical ●Motor Mount & Baseplate ●Modular Cart.
A Preliminary Design of the Rotator for the DES Simulator Stand February 28, 2008 Edward Chi Fermilab/PPD/MD.
1.4b Charging System 1. Charging System Function of the charging system 2 Convert mechanical energy into electrical energy Recharge battery Provide higher.
Drill Press Operations
Systems Level Design Review UL Vibration Test Apparatus January 11, 2013 KGCOE Room # :00AM-12:00PM Est.
Sponsor/Customer: Dr. Ferat Sahin Multi Agent Bio-Robotics Lab Faculty Guide: Prof. George Slack Team Members: Matthew LeStrange – Electrical Engineering.
Power Generation for the Better Water Maker: Subsystems Design Review October 29, 2013.
Mini 10-Hour Course Standards You Need To Know. OSHA’s Philosophy An effective workplace culture should value safety and health Employers should establish.
Lockout Tagout Tryout (LOTO)
Modern Automotive Technology PowerPoint for by Russell Krick
NCSX Modular Coil Turning Fixture FDR. Background Modular Coil winding forms are cast structures which provide the foundation on which the coils are constructed.
P14471 Vibration Testing Application. Team Introductions NameRoleMajor Brett BillingsTeam LeaderIndustrial Engineer Nick GrecoLead EngineerMechanical.
TEAM 14 John Armitage Douglas DeVoto Brian Polkowski Marykate Wioncek SOUTHCO Vibration Fatigue Tester.
Flat Saw Training. Flat Saw Sizes –Low Horsepower Blade diameters range from 8” (200mm) to 18” (450mm) Power ranges from 4 to 25 horsepower.
Preliminary Detailed Design Review P15080 Flow Culture System November 13, 2014.
Flex Cam – Training This shows one version of a complete FlexCam system including Power Unit HCP and Compact Cam CC for piercing operation.
P16221 – FSAE Shock Dynamometer System Level Design Review September 29, 2015.
SAND SAMPLING APPARATUS Eglin Air Force Base Gina Teofilak Richard Klimas Dan Mortensen Ruben De Sousa.
Drop Testing Apparatus Team Members: Deatly Butler Mark Clouse Chris Dux Kris Honas Shaun Scott Drew Stephens Client: Itron, Inc. Brian Priest Technical.
January 11, 2013UL Vibration Test Apparatus1 Final Design.
P13458: Dresser-Rand Compressor Assembly Line Team Members: Lauren Kraft –Project Manager, Nick Feng – IE Cole Bowden – ME, Shawn Moseley – ME Jordon Boggs.
P16221 – FSAE Shock Dynamometer Preliminary Detailed Design Review November 13, 2015.
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
Gates automation. Summary  Choosing the appropriate model  Faac Product Range (Sliding Gates)
Luminaire Vibration Test Apparatus: P14471 Team MemberMajor Brett Billings, Team LeadIndustrial and Systems Engineering Nicholas Greco, Lead Mechanical.
January 16, 2009Senior Design I - System Level Design Review System Level Design Review Senior Design I Low Energy Printing Project P09505.
MSD II System Demonstration P15044 – Intelligent Mobility Cane4/16/2015.
14471 Vibration Test Apparatus: Systems Design Review Team Lead: Brett Billings Lead Engineer: Nicholas G Scribe: Ashley W EDGE: Claire Kobal Team Members:
P15311 Customer Requirements vs Results Customer Rqmt. #ImportanceDescriptionP14311 StatusP15311 Status CR13 Capable of routing traces for finer pitched.
P14471 Vibration Testing Apparatus II Subsystems Design Review 10/29/2013 Brett Billings Jacob Gardner Nick Greco Ron Jimbo Claire Kobal Ryan Selig Ashley.
NASA Great Moonbuggy Race 2012 SpacePokes Design Lesley Young Leader Davis FayRecorder Alisa FrohbieterProject Engineer Ryan WilliamsProject Engineer.
P08452: Reciprocating Compressor Install, Revamp, and Interface Dr. Margaret BaileyFaculty Guide Garry StudleyProject Manager Dave Rigolo Lead Engineer.
P14471 Vibration Testing Apparatus II Integration Demo 4/15/2014 Brett Billings Jacob Gardner Nick Greco Ron Jimbo Claire Kobal Ryan Selig Ashley Waldron.
1  2008 Kaeser Compressors, Inc., USA (V2.2) “Specifications are subject to change without notice” Presenting... Kaeser Omega Blowers.
P14471 Vibration Testing Application. Team Introductions NameRoleMajor Brett BillingsTeam LeaderIndustrial Engineer Nick GrecoLead EngineerMechanical.
ENM208 INTRODUCTION to MACHINING ANADOLU UNİVERSITY Industrial Engineering Department.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
R16601: Glass Fab Wire Saw Integration/Roadmap. “Glass Fab, Inc. is currently looking to replace their wire glass cutting saw with a smaller, more efficient.
Counterweight Fly Systems
P10203 LV1 MOTOR CONTROLLER FINAL REVIEW MAY 14, 2010 Electrical: Kory Williams, Adam Gillon, Oladipo Tokunboh Mechanical: Louis Shogry, Andrew Krall.
CNC FEED DRIVES Akhil Krishnan G M.Tech 1. CONTENTS 1.Introduction 2.Requirements of CNC feed drives 3.Servo motor 3.1 Servo drive control 3.2 Components.
Instrument Clusters Topics covered in this presentation:
CNC FEED DRIVES.
Teknologi Dan Rekayasa
Automotive Engines Theory and Servicing
ENGINE MODE CODES.
C Air Compressor Up-fit and Plumbing Guide For LDI B3
P08002-Automated Parallel Bars
MSD P15280 RIT HOT WHEELZ TEST BENCH
Detailed Design Presentation
Automotive Engines Theory and Servicing
Presentation transcript:

P14471 Vibration Testing Apparatus II Detailed Design Review 12/10/2013 Brett Billings Jacob Gardner Nick Greco Ron Jimbo Claire Kobal Ryan Selig Ashley Waldron 1

Agenda Project Summary Selected Design Preliminary Analysis Frame Motor Electrical / Control System Safety Improvements from P13471 Test Plan BOM Project Plan Concerns/Issues Appendix 2

Project Summary 3

Problem Statement Update company’s vibration test apparatus Meet UL 844 Standard Continue progress started by Team Done: the eccentric drive mechanism Still needs: Frame Motor Control system 4

5

House of Quality Engineering Metrics Customer Requirements Customer Weights Displacement of luminaire Vibration of luminaire Duration of vibration test Low sound Machine won't operate if moving parts are exposed Completely stop machine with Emergency Stop Minimize pinch points Minimize number of operators Voltage of motor Mount pendant configuration Mount stanchion configuration Mount yoke configuration Mount trunnion configuration Visually display settings and status of test Operation documentation Steps required for Set-up Isolate motor from oil spills Maintenance documentation Max weight of mounted luminaire Total materials cost Time to Set up Machine footprint Adherence to UL844 testing standard5555 Apparatus is safe Motor must be compatible with available voltage Ability to test multiple configurations Easy to use Easy to maintain Visually display test information/feedback to operator Ability to test a range of luminaire weights Cost under $ Long service life Similar dimensions to existing machine1 5 Technical Targets (Specifications) 1/32 in cycles/min 35 hours < 85 dBA yes < 10 seconds < 3 ≤ 2 < 240 V AC Yes 80% via survey (easy to follow) < 10 steps Yes 80% via survey (easy to follow) > 150 lbs < $4000 < 120 seconds < 34X48 in 2 Raw score Relative Weight 11% 2%4% 2%3%4%6%1% 3%5%3%7% 3%2%3%1% 6

Engineering Requirements NumberRequirement Raw Score Units Ideal Measure 1 Displacement of luminaire69in1/32 2 Vibration of luminaire69cycles/min Duration of vibration test69hours35 4 Isolate motor from oil spills45BinaryYes 5 Maintenance Documentation44Survey (easy to follow)80% 6 Mount pendant configuration35BinaryYes 7 Operation Documentation33Survey (easy to follow)80% 8 Machine won't operate if crankshaft enclosure is open25BinaryYes 9 Completely stop machine with Emergency Stop25seconds< Maximum voltage of Motor25V AC Minimize number of operators21people2 12 Max weight of mounted luminaire20lbs> Visually display settings and status of test18BinaryYes 14 Steps to set up16steps< Setup Time16seconds< Low Sound15dBA< Minimize pinch points15Count< 3 18 Total materials cost15$< 4, Mount stanchion configuration7BinaryYes 20 Mount yoke configuration7BinaryYes 21 Mount trunnion configuration7BinaryYes 22 Machine footprint5in 2 < 34X48 7

Selected Design 8

Interchangeable Conduits Motor with V-belt VFD Digital Dial Gauge Encoder LCD, Microcontroller Polycarbonate Guards E-stop Paint for Rust Protection 9

Preliminary Analysis 10

Maintaining Displacement ER #1: Displacement must be 1/32’’ Clamping force: Provided by 2 x A574 screws - 5/8’’-11 M = torque on screws = M ft -1 Frictional force: 2 possible locations: = 33.8 M ft -1 (worst case) Maximum force applied: 1.68 ft-lbs. (motor) at 1/32’’ = 645 lbs. Required screw torque: = 38 ft-lbs. (Safety factor of 2) Max recommended A574 torque = 220 ft-lbs *Detailed calculations in Appendix

Engineering Analysis: Forces ER # 12 – Maximum Luminaire Weight Force on collar/conduit = N ( lbf) Force from connecting rod = N ( lbf) Calculated friction forces Worst case = N ( lbf) Torque on connecting rod = Nm (1.575 lbft) Torque on block = 2.399Nm (1.769 lb ft) Torque on crankshaft = 2.399Nm(1.769 lb ft) *Refer to Appendix 12

Engineering Analysis: Fatigue Conduit σ a = psi so σ m =0psi σ a < 0.5* σ 0 Therefore Infinite Life Factor of Safety σ ar =15,5229psi < 0.5* σ 0 Infinite life C-Channel Max stress = psi = σ a σ a < 0.5* σ 0 Infinite Life Refer to appendix σ 0 =35,000psi; σ u =58,000psi 13

Engineering Analysis: Fatigue/Buckling Extension Rod: Buckling: P cr = lbf lbf < lbf No buckling Fatigue: σ a = psi σ a < 0.5* σ 0 Infinite Life Threaded Connector Buckling: P cr = lbf lbf < lbf No buckling Fatigue: σ a = psi σ a < 0.5* σ 0 Infinite Life Refer to appendix σ 0 =35,000psi; σ u =58,000psi 14

Frame 15

Final Frame Design 16

Frame Halve Views Front and Back Views of Full Assembly Front and Back Views of Crankshaft 17

Analysis Overview 18

Frame Analysis at in. Displacement 19

Frame Analysis at in. Displacement 20

Motor 21

Motor Selection ER #2 – Vibration of Luminaire ER #10 – Max Motor Voltage ER #12 – Maximum Luminaire Weight 22

Motor Performance Data: Baldor M3545 Updated cost from Volland Electric Equipment Corp: $ *This is a saving of almost $ from the original estimate We chose a 1 HP motor with a full-load torque of 1.5 LB-FT 23

V-Drive Selection All information was gathered from the Dodge catalog For the given gear ratio of 1.75, Type A, 1-Groove Driver Datum Diameter: 3.4” Outer Diameter= 3.4”+.37”= Approx. 3.75” Driven Datum Diameter: 6.2” Outer Diameter= 6.2”+.37”= Approx. 6.55” Driver Taper Lock Bushing (1210),.5” Shaft Diameter Driven Taper Lock Bushing (1610), 1” Shaft Diameter Distance from center shaft to center shaft using donated belt guard: 9.5” *Unable to locate actual Dodge belt. A very similar belt will be purchased through AutoZone. ER #2 – Vibration of Luminaire ER #4 – Isolate Motor from Oil Spills 24

Motor Mount to Frame 25

Encoder Placement The current shaft has to be machined down to a smaller size at the very end to add a coupling for the encoder. *Encoder to be discussed further in electrical systems 26

Electrical / Control System 27

Component Placement at CCH 28

Flow Diagram 29

Power Connection Schematic 30

Power Supply VGS Watt 5V AC-DC converter 5A max delivered current 3.1 x 1.11 x 2.03 inches *Refer to appendix for power calculations 31

Encoder TRD-N1024-RZWD ER #2 – Vibration of Luminaire ER #13 – Display System Status Resolution: 1024 Pulses Per Revolution (PPR) Max frequency: 100 kHz Max RPM detection: 100 kHz / 1024 PPR * 60 = 5859 RPM 32

33 ER # 10 – Max voltage of Motor

Enclosure AMP1426CCLF Polycarbonate enclosure with metal snap latch 14 x 12 x 6 inches 34

Control System Pseudo Code Initial delay to allow sufficient startup time for motor Repeat (loop) the following until Timer_A value reads 35 hrs Wait for appropriate delay time to avoid overworking MCU CPU Use Timer_A capture from pin 11 of MCU to retrieve digital encoder signal Read and store timer value upon rising edge of signal into var "A" Read and store timer value upon next rising edge into var "B" Period = B - A Frequency = 1 / Period Resolution = 1024 Speed of vibration in RPM = Frequency / Resolution * 60 ; Dimensions = (rev / min) = (pulses/sec) / (pulses/rev) * (60 sec/min) Send RPM and elapsed time (also from Timer_A) to LCD display via pinouts if RPM exists above safety threshold (2000 RPM + threshold) exit loop with error code set high Update VFD with new RPM information to step up or down accordingly Send signal to alert VFD to bring motor to a complete stop if error code set high Write "Test Ended Abruptly: High RPM" to LCD display else Write "Test Completed Successfully" to LCD display 35

Launchpad and Display Encasing ER # 3 – Duration of Vibration Test ER #13 – Display System Status 36

Safety 37

Polycarbonate Guards ER # 8 – Crankshaft Enclosure is Guarded ER # 17 – Minimize Pinch Points Top and rear guard Clear, Polycarbonate ½’’ Excellent impact resistance Warning labels Replace existing top guard Move mounting holes away from edge Increases strength, but slight overhang Modify rear guard Add access hole to decrease setup time 38

Belt Guard ER # 17 – Minimize Pinch Points Protects operator from 2000 RPM belt Donated Modifications required: Convert to “split” type Weld existing halves together Cut guard in half in other direction Change existing mounting brackets 39

Lock Out, E-stop ER # 8 – Crankshaft Enclosure is Guarded Lock out during maintenance On electrical box, after power is isolated Lock out procedure to be written in MSDII ER # 9 – Completely Stop Machine with E-Stop E-stop Located on machine Manually cuts power immediately 40

Engineering Analysis: Sound ER # 16 – Low Sound Hearing Protection / Engineering Intervention To be determined in MSD II with Test Plan Based on sound “dosage” Dosage Calculation: L = dBA Sound Level T = 8 hour exposure limit C = actual exposure hours  D = 100 * (C1/T1 + C2/T2 + C3/T3 +…)  D > 50% requires hearing protection  D > 80% requires engineering intervention

Safety Checklist ER # 8 – Machine Guarding ER # 9 – Emergency Stop ER # 16 – Low Sound 42

Improvements from P

Setup Improvements ER # 11 – Minimize number of operators ER # 14 – Steps to set up ER # 15 – Setup time 44

Setup Improvements Current setup procedure: 1. Measure displacement with dial gauge 2. Lockout machine 3. Remove top guard (8 screws) 4. Remove rear guard (4 screws) 5. Remove collars (2) 6. Remove connecting plate 7. Loosen locking bolts (2) 8. Adjust set screw 9. Perform 2-7 in reverse 10. Repeat 1-9 until 1/32’’ reached ~ 5x Approximately 60 minutes to setup 10 minutes 2x 45

Setup Improvements Displacement adjustment without removing rear guard, collars, or connecting plate Also, U-bolt prevents block from rotating Changes required: Add 2 access holes to connecting plate Add 4 holes total for u-bolt Add 1 access hole to rear guard Doesn’t impact safety,.2’’ 46

Setup Improvements Finer set screw Before: 11 threads per inch 1 turn = 290% of displacement! After: 100 threads per inch 1 turn = 33% of displacement Changes required: Machine new set screw plate Requires threaded bushing for set screw 47

Set Up Improvements Set screw Account for excess space between conduit and collar Flange Dimensioned to be placed in same location every time Blocks on the C channel Flange Collar – crankshaft connection Collar – set screws ER # 11 – Minimize number of operators ER # 6, – Mount 4 configuration types ER # 13, 14 – Setup time, number of steps 48

Test Plan 49

Test Plan Displacement Test Date Completed: ______________________ Performed By: _______________________________ Engr. Spec. # Specification (description) Unit of Measure Marginal Value ToleranceComments/Status 1 The total displacement of the Luminaire must be 1/32" inches 1/32+/- 2% 1,2 The adjustment screws must be tightened to the proper torque ft-lbs>=38- 50

Test Plan Vibration Test Date Completed: ______________________ Performed By: _______________________________ Engr. Spec. # Specification (description) Unit of Measure Marginal Value ToleranceComments/Status 2 Vibration of Luminaire must be 2000 rpm rpm2000+/- 2% 13 Vibration measurement is sent back to the display binaryYes- 12 Apparatus will sufficiently vibrate a large weight luminaire lb>=150- 3Vibrates for 35 hourshours>= Motor power is sufficient to fully run the test hp>=1- 51

Test Plan Dimensional Test Date Completed: ______________________ Performed By: _______________________________ Engr. Spec. #Specification (description)Unit of Measure Marginal Value Comments/Status 11Conduits fit the framebinaryYes 22 Footprint difference compared to old apparatus ft^2<=2 52

Test Plan Configuration Test Date Completed: ______________________ Performed By: _______________________________ Engr. Spec. #Specification (description)Unit of Measure Marginal Value Comments/Status 6Apparatus works while pendant mountedbinaryYes 19 Apparatus works while stanchion mounted binaryYes 20Apparatus works while yoke mountedbinaryYes 21 Apparatus works while trunnion mounted binaryYes 53

Test Plan Ease of Use Test Date Completed: ______________________ Performed By: _______________________________ Engr. Spec. # Specification (description) Unit of Measure Marginal Value Tolerance Comments/Status 13 Display shows rpms and running time binaryYes 14,15 Closed loop feedback keeps rpms in check rpm2000 +/- 2% 11,14,15 Survey given says apparatus is easy to operate %>=80 4Motor is isolated from oil spillsbinaryYes 5 Survey given says apparatus is easy to maintain %>80 54

Test Plan Safety Test Date Completed: ______________________ Performed By: _______________________________ Engr. Spec. # Specification (description) Unit of Measure Marginal Value Comments/Status 8 Machine will not run during LOTO binaryYes 17Pinch points are covered# exposed0 16Noise is below 85 decibelsdB<=85 9 Emergency Stop cuts all power to the apparatus binaryYes 7Complete Safety Checklist# fail0 55

Bill of Materials 56

Bill of Materials ER # 18 – Total cost <= $4,000 Total Overall Price: $2,

Project Planning 58

Engineering Requirements to be addressed in MSDII 59 ER # 5 – Maintenance Documentation ER # 7 – Operation Documentation

Completed Action Items from DDRs Update CAD drawings for machine shop Perform additional vibration simulations Perform additional torque analysis Check VFD effect on motor poles Check voltage, current, and load requirements 60

Risk Assessment *Highest risk items only, refer to Appendix for full list 61

MSD II Schedule 62

MSD II Schedule 63

Concerns/Issues Where to place display? Modifying apparatus once shipped to CCH for testing? 64

Questions? 65

Appendix 66

Full Risk Analysis 67

Engineering Analysis: Displacement 68

Engineering Analysis: Displacement 69

Engineering Analysis: Forces 70

Engineering Analysis: Fatigue 71

Engineering Analysis: Machine Guarding General Industry (29 CFR 1910)29 CFR (d)(44) "Pinch point" means any point other than the point of operation at which it is possible for a part of the body to be caught between the moving parts of a press or auxiliary equipment, or between moving and stationary parts of a press or auxiliary equipment or between the material and moving part or parts of the press or auxiliary equipment (a)(1) Types of guarding. One or more methods of machine guarding shall be provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks. Examples of guarding methods are-barrier guards, two-hand tripping devices, electronic safety devices, etc. Plus specifics for Electrical Markings, Lubrication Access, Belts, and more 72

Power Calculations 73

Bolt Torque Guide 74

Morph Table 75

Architecture Central System Power supplyMotor system Sensors Display/user interface Luminaire connection Crankshaft connection Safety features 76

Alternatives Considered: Consider Systems Level 77

Alternatives Considered: 78

Alternatives Considered: 79

Alternatives Considered: Consider Systems Level 80