ALICE Photo-Injector Ceramic Vacuum Joint Collaboration Daresbury Laboratory has pioneered the use of ‘bulk resistive’ ceramic for the high voltage insulator.

Slides:



Advertisements
Similar presentations
Seminar on Circuit Breaker
Advertisements

Structural and Functional Integration for Power Converters To investigate the application of advanced manufacturing techniques to the fabrication and automated.
HISTORY, EVOLUTION AND DESIGN OF THIN SEPTUM MAGNETS AT BNL Michael Mapes The 14 th ICFA mini-workshop on septa devices.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Severe Service Metal Seated Ball Valves
Concept Design Review (CoDR) Shore Station DC Breaker Cable model Transient Analysis Components.
Elasticity by Ibrhim AlMohimeed
Measurement of mobility of positive charge carriers in polyethylene J Zhao, G Chen and P L Lewin University of Southampton, Southampton, UK Positive charge.
GlueX Solenoid Recent progress and Coil cold tests Paul Brindza September 9, 2004.
1 Operating Experience and Reliability Update on the 5 kW CW Klystrons at Jefferson Lab Richard Walker & Richard Nelson Jefferson Lab, Newport News VA.
Electrical Performance of Dielectrics in High Voltage Transformers George Chen Energy Away Day, 22 May 2012.
Laser Machining of Structural Ceramics: An Integrated Experimental & Numerical Approach for Surface Finish Hitesh D. Vora and Narendra B. Dahotre Laboratory.
Designing for LED electrical safety Presentation at the Lighting Fixture Design Conference 6 th June 2013 By Ken Dale, Principal Engineer, Harvard Engineering.
© 2013 Toshiba Corporation Toshiba Electron Tubes & Devices Co., Ltd. November, 2013 Scope of Disclosure Owner Comparison of fabrication techniques in.
GaAs and CsKSb Photocathodes for DC Gun
Manufacturing technical objects. MATERIALS To decide which materials are suitable for making technical objects, manufacturers must first determine the.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
What ARE all those little things anyway?
WAO, Trieste, 24th - 28th September 2007 An Overview of the Reliability and the Fault Trends of the SRS Cheryl Hodgkinson Daresbury Laboratory Synchrotron.
Parallel dc Circuits.
Coil Cooling Workshop Summary June 10, Electrical Isolation: Cladding is isolated from the T by Kapton. The chill plates electrically connect at.
JAEA/KEK DC gun for ERLs
G.K.BHARAD INSTITUTE OF ENGINEERING DIVISION :D (C.E.) Roll Number :67 SUBJECT :PHYSICS SUBJECT CODE : Presentation By: Kartavya Parmar.
Requirements Engineering
1 Progress On The Design And Manufacture Of The New Stator Geoff Barber Imperial College.
Alpha Magnetic Spectrometer - 02 Flight Safety Review Phase II May , 2007 Analysis - Welding and Brazing Dan Rybicki – Materials Analysis Jacobs.
Vacuum Fundamentals High-Vacuum Technology Course Week 6 Paul Nash HE Subject Leader (Engineering)
High Current Electron Source for Cooling Jefferson Lab Internal MEIC Accelerator Design Review January 17, 2014 Riad Suleiman.
Contacting single bundles of carbon nanotubes with alternating electric fields Marcella De Carlo Danilo Zampetti.
18 th HAPL Meeting Santa Fe, NM April 8, 2008 Naval Research Laboratory Plasma Physics Division Washington, DC Presented by Frank Hegeler Work supported.
5 장 Dielectrics and Insulators. Preface ‘ Ceramic dielectrics and insulators ’ is a wide-ranging and complex topic embracing many types of ceramic, physical.
NCSX VACUUM VESSEL PL Goranson Thermal Insulation Final Design Review July 31, 2006 WBS12 NCSX.
PESP 2008 JLAB 1st-3rd Oct Photocathode Preparation System for the ALICE Photoinjector Keith Middleman Vacuum Science Group ASTeC, Daresbury UK.
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 RFBPM Windows Joining Effort Undulator System W. Toter, D. Bromberek, F. Depaola,
1 Progress of IR Vacuum Chambers Chen Peng May 11,2007.
GlueX Two Magnet Tagger G. Yang University of Glasgow Part 1, 3 D Tosca analysis. Part 2, Preliminary Drawings. Part 3, Proposed Assembly Procedures (i)
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
20 years of high average Fundamental Power Coupler designs at CERN CWRF workshop 2014, Trieste Eric Montesinos, CERN-RF, on behalf of many colleagues CWRF.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
The NLC RF Pulse Compression and High Power RF Transport Systems Sami G. Tantawi, G.Bowden, K.Fant, Z.D.Farkas, W.R.Fowkes J.Irwin, N.M.Kroll, Z.H.Li,
ESS WP 12 Project Management & Capabilities Overview Neil Bliss Projects & Mechanical Engineering Group Leader ESS PDR, Lund, 10 th November 2015.
Test Results on Sealing in Options A & E Dean Walters Argonne National Laboratory Michael MinotMinoTech Engineering Inc.
General remarks: I am impressed with the quantity and quality of the work presented here and the functioning of the organization. I thank ILC and FNAL.
 Brazing may be define as a techniques of joining two similar or dissimilar materials by additional of special filler metal.
Solenoid Status Paul Brindza Dec. 12, Status of work at IUCF Solenoid R&R is based on a MOU between JLAB and IUCF The MOU divides the work into.
MAP Assembly Investigation A project summary for discussion during 4/11/2014 meeting.
Andrew BurrillFall 2011 Project X Collaboration Meeting 650 MHz Developments at JLAB Andrew Burrill for the JLab Team.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
PXIE RFQ Engineering Design Steve Virostek Engineering Division Lawrence Berkeley National Laboratory April 10, 2012 Project X Collaboration
RFQ coupler S. Kazakov 07/28/2015. Requirements: Coupler requirements Expected problems: Heating (loop, ceramic window, etc.) Multipactor Solutions: Appropriate.
A PRESENTATION ON JOINTS & FITTINGS PREPARED BY GOLAKIYA JATIN GUIDED BY PROFF. AESHA J. MEHTA DEPARTMENT OF CHAMICAL ENGINEERING SHREE S’AD.
Cleanrooms Keith Middleman. Particulates and Clean rooms What is a particulate? Small discrete mass of solid or liquid. Human hair is microns in.
Welcome to the 13 th Annual TSA Conference, 2016.
ATLAS Internal ID Service Integration
Chapter 31 Solid-State Welding Processes
Organization of proposed cryolab collaboration with AEGIS
Op-Amp Basics & Linear Applications
ELLIPTICAL SCRF CAVITIES
Superconducting Cavities: Development/Production
Flexible lines assembly
Monday Meeting 24 – Narong Chanlek.
Action People Time [h] Shutting down the SR 2 1
-Honors Thesis Defense- In Situ Ellipsometry of Surfaces in an Ultrahigh Vacuum Thin Film Deposition Chamber Joseph Choi Department of Physics and Astronomy,
Actives Devices: Diodes, Transistors, Tubes
Status of 500-kV DC gun at JAEA
Center for Injectors and Sources
200 kV gun CST microwave studio simulations Shield modifications
200 kV gun CST microwave studio simulations Shield modifications
Pipe fitting Threads on pipe fittings are tapered and rely on the stress generated by forcing the tapered threads of the male half of the fitting.
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

ALICE Photo-Injector Ceramic Vacuum Joint Collaboration Daresbury Laboratory has pioneered the use of ‘bulk resistive’ ceramic for the high voltage insulator used to isolate the ALICE Cathode assembly, which must be brought to around -400kV DC potential. The bulk resistive properties give the ceramic a resistive effect equivalent to around 60 GΩ, which divides the applied DC voltage across its length, and protects the ceramic against bombardment of electrons from any field emitters on the Cathode assembly. The Daresbury Pioneered Bulk Resistive Ceramic and the photo-injector assembly pre-installation. The bulk resistive ceramic proved itself to be a great success electrically. Its voltage division properties are ideal for the application. Based upon Daresbury’s experience, both Cornell University and Jefferson Laboratories FEL projects in the USA have ordered identical bare ceramics to DL’s design from the UK manufacturer Morgan Crucibles American subsidiary WESGO in the USA. The major issue with the ceramic has been with the ceramic to metal joints at each end, where the flange is attached. The sheer size of this ceramic has resulted in difficulties in obtaining a durable vacuum joint, capable of being repeatedly baked to 230 C, which is essential if pressures as low as 3 x mB are to be achieved within the injector. The original internal copper ring jointing technique applied was developed by Cornell University and CPI, a commercial klystron manufacturer. CPI Type Internal Copper Ring Joint, and its Failure Mechanism Showing Ceramic Delamination. This joint failed on all three of DL’s ceramics. As part of the failure investigation, the copper joint ring and metallisation were removed. The findings were that the stresses during bakout at the ceramic/metallisation boundary were so great that the ceramic was being literally torn off. A better solution was urgently required. Ceramic Abutment face Flange to Ceramic Flange Copper ring Braze History With Daresbury, JLAB and Cornell requiring a viable solution to the sealing problem, a collaboration between the laboratories and CPI was set up in order to pool knowledge and experience and produce a reliable design. It was decided to progress two techniques. A modified external taper braze kovar and a monel butt joint. Daresbury Designed External Kovar tapered braze joint and detail of attachment to the 14” Flange This joint is at the most advanced stage and CPI have completed the most difficult part of the procedure. Having recovered a failed Daresbury ceramic and re-worked it by grinding a fine taper onto each end, they have now successfully brazed on the kovar rings, and these have tested vacuum tight. The flanges must now be welded on and the complete assembly returned to DL for repeated bakout testing. Collaboration Designed Butt braze joint showing detail of attachment to the 14” Flange This joint is well advanced and the collaborators have agreed the design with CPI. Another of Daresbury’s ceramics has been re-claimed and has been ground as shown. A disk of the ceramic has been cut off to provide the backing ring required to support the monel sandwich during the brazing process. Following completion of the taper joint above, this butt joint ceramic will then enter into CPI’s brazing process and should be completed by the end of April This joint will again be tested at DL by repeated baking to prove its durability. Developments