Managing Processes and Capabilities CHAPTER THREE.

Slides:



Advertisements
Similar presentations
EMBA-2, BUP Major Asad EO Chapter 5: Process Analysis.
Advertisements

Managing Processes and Capabilities CHAPTER THREE McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 3 Managing Processes and Capacity McGraw-Hill/Irwin.
TOPIC :CAPACITY AND FACILITIES
Process Design and Analysis
PROCESS DESIGN AND ANALYSIS Chapter Eleven Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
11–1. 11–2 Chapter Eleven Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
MBA 8452 Systems and Operations Management
Just-In-Time and Lean Systems
Chapter 4 Process design Shenval. Alamy.
Just-In-Time “Eliminate Waste”.
Managing Process Flows
Facility Layout 1. General Observations Facility Planning includes planning for: (1) the number of facilities and general facility type, (2) facility.
Operations Management
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
Business Process A logically related sets of tasks or activities geared toward some business outcome. 1. Primary (value-added) 2. Support 3. Developmental.
Chapter 6, Process-Flow Analysis
Irwin/McGraw-Hill 1 Process Analysis Terms Process: Is any part of an organization that takes inputs and transforms them into outputs. Cycle Time: Is the.
1 Chapter 7 Dynamic Job Shops Advantages/Disadvantages Planning, Control and Scheduling Open Queuing Network Model.
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
Wegmans Frozen Cookie Capacity Increase Final Project Presentation Richard Latham, Bridget Eggers, Tyler Brent, Valeria Gonzalez.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
© OpStat Group Inc. All rights reserved. 1 A Lean Analysis Methodology Using.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Chapter 6 Process Analysis.
1 © The McGraw-Hill Companies, Inc., 2004 Introduction (from Chase) Process Analysis.
1-1 1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved.
The Simulation Project. Simulation Project Steps a.- Problem Definition b.- Statement of Objectives c.- Model Formulation and Planning d.- Model Development.
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
Chapter 3 Network and System Design. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand.
ALL MCQS
Introduction to the Theory of Constraints (TOC) & Critical Chain Project Management (CCPM) Major Mark McNabb.
LOGISTICAL OPERATIONS INTEGRATION l When LM is highly integrated and positioned as a core competency, it can serve as a standpoint for gaining a competitive.
COPYRIGHT © 2008 Thomson South-Western, a part of The Thomson Corporation. Thomson, the Star logo, and South-Western are trademarks used herein under license.
Process Analysis process  A process is a set of tasks to be performed in a defined sequence  Process analysis describes how a process is doing and can.
1 Slides used in class may be different from slides in student pack Chapter 5 Process Analysis  Process Analysis  Process Flowcharting  Categories of.
Topics To Be Covered 1. Tasks of a Shop Control Manager.
Process Analysis CHAPTER 5. Learning Objectives 1. Recognize three basic types of processes: a serial flow process, parallel processes (such as what happens.
Process Analysis I Operations -- Prof. Juran.
Flow Rate and Capacity Analysis
© 2013 South-Western, a part of Cengage Learning. All rights reserved. Chapter 8 | Slide 1 Production, Operations Planning, Quality Chapter8.
1 Session 18 Implementation of TOC at Tosoh, SMD Laura Blum Production and Inventory Control Manager.
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
Operations Fall 2015 Bruce Duggan Providence University College.
S7 - 1 Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10 th Edition. By Jay Heizer & Barry.
1 Mix Model for Executives FMS 200 Series FBP-FMS288A.
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Operations & Logistics Management Lesson 7- Process Design & Lesson 8- Capacity & Buffering Operations.
5 © The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin 5 5 Slide 5-1 Target Costing,Theory of Constraints, and Life-Cycle Cost.
Definition: The physical positioning of processes, departments, equipment and work areas to optimize an organization’s effectiveness in achieving its operating.
Chapter 7: Manufacturing Processes
Introduction to the Theory of Constraints (TOC) & Critical Chain Project Management (CCPM) Major Mark McNabb.
Lean operations and JIT
Strategic Capacity Management
Chapter 5 Process Analysis. Chapter 5 Process Analysis.
Interactive Factors in Manufacturing
An introduction to Factory Physics
Analytical Tools for Process Analysis and Improvement
Process Design and Analysis
Constraint Management
FACILITY LAYOUT Facility layout means:
Value Stream Mapping (VSM) Training
Chapter 5 Process Analysis.
Capacity Planning For Products and Services
Capacity Planning For Products and Services
Operations Management
Process Analysis “If you cannot describe what you are doing as a process, you do not know what you are doing.” W.E. Deming.
Capacity Planning For Products and Services
Chapter 5 Process Analysis.
1. 2 Operational Efficiency and Business process Performance Operational Efficiency and Business process Performance Just in Time Systems (J I T) Reductions.
Presentation transcript:

Managing Processes and Capabilities CHAPTER THREE

What is a process? A system of structured activities that use resources to turn inputs into valuable outputs. Process thinking views activities in an organization as a collection of processes Processes consist of: –Activities –Inputs/Outputs/Flows –Process structures –Management policies 3–2

Activities of a process Operations change inputs Transportation moves an input from place to place Inspection verifies the results of an activity Delay unintentionally stops the flow of an input Storage is the formal inventorying of an input 3–3

Process Flowchart

Process Capacity Capacity: amount of input that can go into or the amount of output that can be created by a process, at a given level of resources over a given time period 3–5

Process Capacity Definitions Maximum capacity: highest achievable level under ideal conditions, for a limited time Effective capacity: achievable level under normal conditions, for an extended time Utilization: how much available capacity is actually used Efficiency: how well a resource is used compared to set standards Yield: usable output from input 3–6

Process Capacity Definitions Maximum capacity = 200,000 units per day Effective capacity =120,000 units per day Actual orders = 150,1000 units per day Utilization of maximum capacity = (150,000/200,000) x 100% = 75% Utilization of effective capacity = (150,000/120,000) x 100% = 125% 3–7 Example 3-1

Yield rate If 100 items began to process, and only 80 were successfully completed, Then yield rate is 80%. 3–8

Expanding Process Capacity Increase Utilization –Increase up-time –Reduce changeovers and set-up times –Improve scheduling) Improve Efficiency –Improve layout –Break bottlenecks –Reduce or buffer variation –Increase labor productivity Increase Yield –Voice of the customer –Poka-Yoke –Increase process capability and control –Improve in-coming materials quality 3–9 Creativity Before Capital

Theory of Constraints (TOC) 1.Every process has a constraint 2.Every process has variance that consumes capacity 3.Every process must be managed as a system 4.Process measures are crucial to the process’s success 5.Every process must continually improve 3–10

Expanding Process Capacity Increase Utilization –Increase up-time –Reduce changeovers and set-up times –Improve scheduling) Improve Efficiency –Improve layout –Break bottlenecks –Reduce or buffer variation –Increase labor productivity Increase Yield –Voice of the customer –Poka-Yoke –Increase process capability and control –Improve in-coming materials quality 3–11 Creativity Before Capital

1. Every process has a constraint Serial/Sequential Structure: processes occur one after another Parallel Structure: two or more processes occur simultaneously 3–12 Figure 3-1 and Example 3-2 ABCD Finished Item 325 items400 items275 items375 items per hour per hour per hour per hour Bottleneck

1. Every process has a constraint 3–13 Figure 3-2 and Example 3-3 ABCD Finished Item 325 items90 items275 items375 items per hour per hour per hour 400 items per hour E F 180 items 130 items

1. Every process has a constraint wMhttp:// wM 3–14

1. Every process has a constraint (cont’d) Measures of process flow: – Manufacturing lead time: The time it takes one unit of product to go through the entire empty assembly line from start to finish –Flow time: time for one unit to get through a process, i.e. processing time plus waiting time 3–15 Example 3-4

1. Every process has a constraint (cont’d) Measures of process flow: –Cycle time: time it takes to process one unit at an operation (or station) in the overall process –Throughput rate or a capacity of a process: is a reciprocal of the cycle time at the bottleneck operation 3–16 Example 3-4

Example: Bread making process 3–17 Example 3-4 Initial Assumption 1) Two parallel baking lines, each equipped with a mixer, a proofer, and an oven. 2) The two baking lines share a single packaging line. 3) 8-hour work day

Bread making lines

Which process is the bottleneck within each baking line? What is the cycle time of the 1 st baking line? The 2 nd ? Bread making lines

What is the cycle time for the entire baking line operation? What is the cycle time for the entire bread-making process? Bread making lines

What is the overall daily capacity of the bread-making operation? Bread making lines

2. Variance consumes capacity Variance occurs in a process’s inputs, activities and outputs. Increased complexity and uncertainty makes it difficult to create plans to efficiently and effectively use resources. 3–24 B A Wait time 0%100% Capacity utilization Process B has greater variability than process A

2. Variance consumes capacity (cont’d) 3–25 c a = coefficient of variation (standard deviation/average) of job arrival times c p = coefficient of variation of job processing times u = utilization of the work center t p = average processing (cycle) time for jobs

2. Variance consumes capacity (cont’d) 3–26 c a = 2 c p = 1.5 u = 85% t p = 3 minutes Example 3-5

2. Variance consumes capacity (cont’d) Variability in: –Products: changeovers –Schedules: batching creates complex, moving bottlenecks –Quality: rework, scrap, starving –Resource availability: downtime –Process speed: blocking / starving –Input deliveries: starving 3–27

3. Processes managed as systems Changing one element of a process may impact other elements, sometimes in unexpected ways. Process elements are interdependent –Activities –Inputs/Outputs/Flows –Process structures –Management policies 3–28

4. Measuring processes for success Metrics should address aspects of performance that are important to both customers and the organization. –They should be verifiable and quantifiable. –They should align with standards and rewards. –They should support strategy and priorities. –They provide the basis for monitoring, controlling and improving processes. 3–29

5. Continuous improvement of processes Kaizen: focused, incremental improvement efforts small + small + small + small + … + n = LARGE –Team focus: utilize the knowledge and experience of the people associated with the process –Short term and focused: quick, local improvement –Action-oriented: quick implementation –Repetitive: regular events 3–30

Homework for this chapter will be bread making lines and XYZ component operations Homework (Three problems)

Now the bakery is considering replacing some of its existing equipment with more advanced and faster equipment. The choice is between option 1) replacing two new baking ovens that are each capable of baking a batch of 100 loaves in 3/4 hour (instead of 1 hour) or option 2) replacing the packing station with one capable of packaging a batch of 100 loaves in 1/2 hour. Homework (Problem1: Bread making lines)

1) Which option would allow the greater increase in the bakery’s overall capacity 2) What is the new overall daily capacity with a new option? 3) What is the percentage increase in daily capacity? Homework (Bread making lines)

3–34 Homework (Problem 2: XYZ component operation) Consider XYZ component operation below

3–35 Assumptions One worker is needed to operate each machine in the molding dept. The molding dept. has 6 machines and currently 6 workers in the molding dept. Each molding machines produce 25parts/hour. The purchased parts operation has virtually unlimited capacity. 15 workers in final assembly. Assembly line moves 150 parts per hour as the 15 workers work together. Work 8- hour work day and 5-day work week. Homework (XYZ component operation)

3–36 1)What is the weekly capacity of the molding operation? 2)What is the weekly capacity of the assembly operation? 3)What is the weekly capacity of the entire operation? Homework (XYZ component operation)

3–37 Do problem 8 on page 75 of the text Homework (Problem 3)

3–38 Do the case of “American Vinyl products” on page 77 of the text Case analysis with Homework