A.Kounine 13 Jan 2007Flight Software Status1 JSC 13 January 2007 Andrei Kounine / MIT.

Slides:



Advertisements
Similar presentations
Status of Tracker Power supply electronics Mauro Menichelli,Sandor Blasko,Lucio Accardo INFN Perugia.
Advertisements

TDR2 FM board tests D. Haas Test Setup Test Procedure Functional tests Results Test Schedule.
TRD DAQ (U) Software Status TIM CERN May.09 Chanhoon Chung, Mark Millinger, Andreas Sabellek IEKP - Universität Karlsruhe (TH)
Marco Cattaneo, 23rd February Status of the software migration  Migration strategy: Where we should be  Status: Where we are  Plans.
DAQ Status Report GlueX Collaboration – Jan , 2009 – Jefferson Lab David Abbott (In lieu of Graham) GlueX Collaboration Meeting - Jan Jefferson.
UG-crate status AMS TIM - CERN - 15/4/2008 A.Bartoloni, B.Borgia, F.R.Spada* INFN Roma.
LHC BLM Software revue June BLM Software components Handled by BI Software section –Expert GUIs  Not discussed today –Real-Time software  Topic.
Tracker meeting – July, 2006 TBS – TPSFE FM/FS tests Lucio Accardo, INFN Perugia.
1 October 2003Paul Dauncey1 Mechanics components will be complete by end of year To assemble ECAL, they need the VFE boards VFE boards require VFE chips.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
PACS SVR22/23 June 2006 Warm Electronics1 Warm Electronics: Components/Subsystems Test Results B. Voss PACS SVR.
TRD Electronics Flight Production Wim de Boer, Kai Gassmann, Florian Hauler, Andreas Sabellek, Mike Schmanau IEKP - Universität Karlsruhe (TH)
POCC activities AMS02 meeting at KSC October 11 th 2010.
Status Report toward the Beam Test Quick report on the MPPC mass check Other beam test related issues –Schedule –Participants –Jobs –etc … Satoru Uozumi.
AMS-02 JMDC On-Board Application Software Review Xudong CAI / M.I.T. Mar. 1, KSC.
Boot Code Readiness Review
AMS Summary 16:00 on Mon 26 Mar 2018 (GMT 085) To
16:00 on Tue 3 Apr 2018 (GMT 093) To 16:00 on Wed 4 Apr 2018 (GMT 094)
AMS Summary 16:00 on Thu 29 Mar 2018 (GMT 088) To
16:00 on Mon 2 Apr 2018 (GMT 092) To 16:00 on Thu 3 Apr 2018 (GMT 093)
AMS Summary 16:00 on Wed 24 Oct 2018 (GMT 297) To
AMS Summary 16:00 on Mon 29 Oct 2018 (GMT 302) To
AMS Summary 16:00 on Wed 31 Oct 2018 (GMT 304) To
AMS Summary 16:00 on Mon 22 Oct 2018 (GMT 295) To
AMS Summary 16:00 on Mon 19 Nov 2018 (GMT 323) To
AMS Summary 16:00 on Thu 15 Nov 2018 (GMT 319) To
AMS Summary 16:00 on Fri 16 Nov 2018 (GMT 320) To
AMS Summary 16:00 on Wed 21 Nov 2018 (GMT 325) To
AMS Summary 16:00 on Wed 14 Nov 2018 (GMT 318) To
AMS Summary 16:00 on Tue 20 Nov 2018 (GMT 324) To
AMS Summary 16:00 on Fri 05 Oct 2018 (GMT 278) To
16:00 on Thu 8 Nov 2018 (GMT 312) To 16:00 on Fri 9 Nov 2018 (GMT 313)
AMS Summary 16:00 on Fri 9 Nov 2018 (GMT 313) To
16:00 on Fri 2 Nov 2018 (GMT 306) To 16:00 on Mon 5 Nov 2018 (GMT 309)
16:00 on Tue 6 Nov 2018 (GMT 310) To 16:00 on Wed 7 Nov 2018 (GMT 311)
AMS Summary 16:00 on Fri 23 Nov 2018 (GMT 327) To
AMS Summary 16:00 on Thu 22 Nov 2018 (GMT 326) To
16:00 on Wed 5 Dec 2018 (GMT 339) To 16:00 on Thu 6 Dec 2018 (GMT 340)
AMS Summary 16:00 on Mon 12 Nov 2018 (GMT 316) To
AMS Summary 16:00 on Fri 30 Nov 2018 (GMT 334) To
AMS Summary 16:00 on Wed 23 Jan 2019 (GMT 023) To
AMS Summary 16:00 on Mon 28 Jan 2019 (GMT 028) To
AMS Summary 16:00 on Wed 9 Jan 2019 (GMT 009) To
AMS Summary 16:00 on Fri 11 Jan 2019 (GMT 011) To
AMS Summary 16:00 on Mon 14 Jan 2019 (GMT 014) To
AMS Summary 16:00 on Thu 24 Jan 2019 (GMT 024) To
AMS Summary 16:00 on Wed 13 Feb 2019 (GMT 044) To
AMS Summary 16:00 on Mon 18 Feb 2019 (GMT 049) To
AMS Summary 16:00 on Fri 15 Feb 2019 (GMT 046) To
AMS Summary 16:00 on Tue 19 Feb 2019 (GMT 050) To
AMS Summary 16:00 on Thu 14 Feb 2019 (GMT 045) To
AMS Summary 16:00 on Thu 10 Jan 2019 (GMT 010) To
AMS Summary 16:00 on Tue 26 Feb 2019 (GMT 057) To
AMS Summary 16:00 on Mon 25 Feb 2019 (GMT 056) To
AMS Summary 16:00 on Fri 22 Feb 2019 (GMT 053) To
AMS Summary 16:00 on Fri 12 Apr 2019 (GMT 102) To
AMS Summary 16:00 on Mon 15 Apr 2019 (GMT 105) To
AMS Summary 16:00 on Thu 11 Apr 2019 (GMT 101) To
LHC BLM Software audit June 2008.
AMS Summary 16:00 on Thu 18 Apr 2019 (GMT 108) To
AMS Summary 16:00 on Tue 30 Apr 2019 (GMT 120) To
16:00 on Fri 3 May 2019 (GMT 123) To 16:00 on Mon 6 May 2019 (GMT 126)
Bad Runs Alberto Oliva, July 2012.
AMS Summary 16:00 on Fri 10 May 2019 (GMT 130) To
AMS Summary 16:00 on Mon 13 May 2019 (GMT 133) To
AMS Summary 16:00 on Tue 14 May 2019 (GMT 134) To
AMS Summary 16:00 on Wed 22 May 2019 (GMT 142) To
AMS Summary 16:00 on Thu 11 Jul 2019 (GMT 192) To
16:00 on Mon 8 Jul 2019 (GMT 189) To 16:00 on Tue 9 Jul 2019 (GMT 190)
AMS Summary 16:00 on Thu 04 Oct 2018 (GMT 277) To
Presentation transcript:

A.Kounine 13 Jan 2007Flight Software Status1 JSC 13 January 2007 Andrei Kounine / MIT

A.Kounine 13 Jan 2007Flight Software Status2 DAQ Architecture xDR, JINF, JINJ  data acquisition  slow control USCM  slow control JMDC  data acquisition  slow control  avionics interface

A.Kounine 13 Jan 2007Flight Software Status3 Two types of memory to store SW: PROM memory –Programmed once during production –Not changeable during flight –Contains “ROM Monitor” program –SW must meet specific time deadlines FLASH Memory –Can be rewritten any time –Contains “DAQ” programs –Contains Data Sets Persistent storage for programs

A.Kounine 13 Jan 2007Flight Software Status4 xDR, JINF, JINJ Software

A.Kounine 13 Jan 2007Flight Software Status5 xDR, JINF, JINJ software responsibilities Framework – A.Kounine LV1 Trigger – A.Kounine, C.H.Lin Tracker – D.Haas, C.Zurbach TRD – A.Sabellek RICH – G.Martinez ECAL – S.DiFalco TOF & ACC – A.Kounine

A.Kounine 13 Jan 2007Flight Software Status6 ROM Monitor –4 types for 310 nodes (xDR, LV1/SDR, JINF, JINJ) –Only minor changes since 2003 –Tested in the lab and in the beam tests –Initial release for FM production on –Final ROM monitor version frozen on DAQ programs –T,U,R,E,LV1 – passed intensive tests, fine tuning; –JINF,JINJ – passed intensive tests, fine tuning; –S – tests in progress, modifications of HW and FW, development of TOF-specific data processing. Status of xDR, JINF, JINJ software

A.Kounine 13 Jan 2007Flight Software Status7 Problems observed during tests Functionality of ACTEL chips TDR FM production – 2 ACTELs have broken functions (AMSwire RX, sequencer) despite correct checksum. Detailed functional tests during production needed to spot this type of problems. Corrupted sector in FLASH memory One JINFv2 QM has FLASH memory with a sector (1 of 11) that can not be erased. If discovered early – replace, otherwise live with it.

A.Kounine 13 Jan 2007Flight Software Status8 ROM Monitor frozen: –Identical to that of JLV1, tested on SDR2 –All basic functions (FLASH operations, AMSWire communication, …) are tested. DAQ program development: –LeCroy bus functionality verified; –Sequencer – ongoing tests; –TOF control commands – under tests; –Data collection from SFEC, SFET boards – under tests; –Data collection from SFEA board – not yet started, pending availability of the board. Status of S-crate software

A.Kounine 13 Jan 2007Flight Software Status9 S-crate comprises: –1 SDR2 board –4 SFET2 boards; –1 SPT2 board (with 2 SFEC boards connected); –1 SFEA2 board. Test setup consist of: –½ of SDR2 board; –½ of SFET2 board with limited functionality; –½ of SPT2 board with 1 SFEC board connected. Software development goes along with FW development and HW verification. Status of S-crate software

A.Kounine 13 Jan 2007Flight Software Status10 Status of the xDR, JINx Software V6205 released on ROM Monitor – frozen, used in JLV1, TDR, JINJ FM (this corresponds to about 60% of DSP-based FMs) V6B18 – current DAQ development version SDR code – under development (HW, FW, SW); Fine tuning of DAQ programs. TOF electronics – design frozen, verification in progress. TOF electronics – qualification by fall 2007

A.Kounine 13 Jan 2007Flight Software Status11 JMDC Software

A.Kounine 13 Jan 2007Flight Software Status12 Status of the JROM Flight software V661E – programmed 4 FM JSBC (RHPROM): JSBS FM/FS production finished mid-August SW bugs identified, MUST be corrected for flight (ECO will be issued). 1 corrupted RHPROM (JMDC2, addr 0xFFF100D2). (NCR will be issued). V6C01 – version with the known bugs fixed. In-depth tests are still being conducted. Used in ESS tests along with v661E

A.Kounine 13 Jan 2007Flight Software Status13 Problems observed during tests Reliability of RHPROM chips JCBS (95009F) – 1 bit was wrongly programmed; JIM-CAN (94004F) – bit flipped during thermal test; JSBC (95008F) – abnormal behavior at -20 o C, may be related to RHPROM, to be verified. Programming procedure must be observed Baking at 200 o C for 64hours – was not performed; Burn-in at 150 o C for 64hours – was not performed; Post burn-in verification to be performed.

A.Kounine 13 Jan 2007Flight Software Status14 J-crate schedule Dec 2006 – ESS acceptance tests of the 1 st J- crate, to be completed in January January-February 2007 – TVT acceptance of the 1 st J-crate. June 2007 – replace 4 JBU boards by JBUX. Real deadline for replacing RHPROMs. Assembly of the 2 nd J-crate. Summer and fall 2007 – acceptance tests for 2 nd J-crate, re-qualification of the 1 st J-crate.

A.Kounine 13 Jan 2007Flight Software Status15 Status of the JROM Flight software 28 RHPROMs available for programming: 24 needed for programming of 6 FM/FS JSBC. 2(4) FM/FS JSBC will be equipped with Boot FLASH. Further tests: Conduct J-crate ESS with v661E, gain experience. SW backdoor for last-minute changes in ROM Mon (for ESS tests v6C01 is actually used). Replace RHPROMs when JBUX available. Time frame – April-May 2007.

A.Kounine 13 Jan 2007Flight Software Status16 Conclusions xDR, JINF, JINJ software. ROM Monitor is frozen, used for JLV1, TDR, JINJ FM; S-crate HW/FW, is on the critical path. JMDC software. ROM Monitor V661E used for FM production; Prudent iteration on ROM Monitor needed; JOS is frozen, no modifications are foreseen; JAP is under tests and development.