Global Design Effort BDS updates SLAC 1:30 Monday meeting Andrei Seryi November 5, 2007 Previous update – August 20, 2007.

Slides:



Advertisements
Similar presentations
Global Design Effort Goals and Introduction Andrei Seryi, SLAC, September 17, 2007.
Advertisements

Global Design Effort Beam Delivery System & Machine Detector Interface Andrei Seryi, SLAC Annual DOE HEP Program Review June 11-14, 2007.
Summary of wg2a (BDS and IR) Deepa Angal-Kalinin, Shigeru Kuroda, Andrei Seryi October 21, 2005.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
July 7, 2008 SLAC Annual Program Review Page 1 Andrei Seryi, SLAC American Regional Team leader for BDS Deputy of ATF Spokesperson for ATF2 Global Design.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
November 07, 2006 Global Design Effort 1 Beam Delivery System updates BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei Seryi Valencia GDE.
ATF2 Magnets Summary of the Session on Magnets, Movers and Magnet Installation. ATF2 5 th Project Meeting, at KEK Cherrill Spencer, Magnet Designer and.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
CES Status J.Osborne 6 November 2009 Status Report from Civil Engineering and Services Working Group J.Osborne GS/SEM for CES Working Group.
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
February 26, 2007 Global Design Effort 1 Most recent in Beijing BDS/IR talk, February 4, 2007:
Global Design Effort - CFS SiD Collaboration Meeting - SLAC 1 VERTICAL ACCESS ILC IR LAYOUT for SiD and ILD CONVENTIONAL FACILITIES AND SITING.
ATF2 Magnets ATF2 Magnets KEK, 19 Dec 2006Cherrill Spencer, SLAC ATF2 Mag Design & Production 1 Design and Production Status of New ATF2 Magnets Cherrill.
October 13, 2006 Global Design Effort 1 International Linear Collider Machine Detector Interface Materials for discussion at Engineering Forum: experiences.
February 4, 2007 Global Design Effort 1. February 4, 07 Global Design Effort IR&MDI: 2 Contents Will describe design of Beam Delivery System, focusing.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update November.
ATF2 Magnets ATF2 Magnets 3rd July 2007Cherrill Spencer, SLAC. Info on top of FD ATF2quad for D. Urner 1 Information on top of the QC3 style quads that.
ILC MDI Andrei Seryi JAI with input from many colleagues working on MDI IWLC
Global Design Effort Beam Delivery System design and EDR, Introduction Andrei Seryi, SLAC BDS Kick-Off meeting, October 11-13, 2007.
ILC experimental area - How to ‘develop’ CFS details for TDP (cavern size, number of shafts, HVAC, EL spec etc) ? - KEK site specific issues CFS V.Kuchler.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Thanks to Andrei for slides October 26, 一般報告 Hitoshi Yamamoto, Oct 26, 2006.
Philip Burrows SiD Meeting, Paris 11/02/081 Machine Detector Interface Issues Philip Burrows John Adams Institute Oxford University Thanks to: Tom Markiewicz.
IR Interface Document Draft Andrei Seryi SLAC for BDS design team and MDI-D representatives of Detector Concepts May 25-30, 2008, Budker INP, Novosibirsk,
1 GLD and GLDc Sep. 12, 2007 Y. Sugimoto KEK. 2 Compact GLD Option Motivation –GLD and LDC will write a common LoI –The detector design should have common.
ATF2 Magnets ATF2 Magnets 22 May 2007Cherrill Spencer, SLAC. Progress on New ATF2 Magnets 1 Progress Report on ATF2 New Magnets 22 nd May 2007 Cherrill.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
Global Design Effort Critical Interaction Region Issues, Report from the IR engineering workshop Andrei Seryi, SLAC October 24, 2007.
1 BDS and Detector schedules for discussion at MDI meeting August 15, 2006 Andrei Seryi with input from Martin Gastal, Yasuhiro Sugimoto et al.
Global Design Effort SLAC contribution to ATF2 for discussions at S4 expanded meeting April 10, 2007.
A. Hervé - 17 Oct CLIC-Workshop CLIC Workshop: 17 Oct. 07 Interaction Region Engineering at ILC Push-Pull Option A. Hervé/CERN.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
Interaction Region & IR integration EDR Planning Tom Markiewicz/SLAC SLAC BDS Kick-Off-Meeting 13 October 2007.
October 20, 2006 Global Design Effort 1 ILC Interaction regions : The GDE perspective Talk based on several talks presented by BDS area leaders Andrei.
November 07, 2006 Global Design Effort 1 Beam Delivery System / Machine Detector Interface BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei.
Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007.
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
A. Hervé - 17 Sept ILC-IRENG IRENG07 Workshop: 17 Sept. 07 Various Possibilities for disposition of Experimental Area A. Hervé/CERN.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.
Global Design Effort CLIC-ILC BDS & MDI work Materials for discussion Daniel Schulte, Rogelio Tomas and Emmanuel Tsesmelis for CLIC team Andrei Seryi for.
Global Design Effort Working Group C Conventional Facilities Parallel Session IRENG07 V. Kuchler, A. Enomoto, J. Osborne September 19, 2007.
Taikan SUEHARA, IN2P3-KEK collaboration meeting on ATF2, Annecy, 2007/10/15 Shintake Monitor: Installation and Commissioning Schedule Taikan SUEHARA, The.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
GLD experimental hall and detector assembly Y.Sugimoto KEK 27 Sep
Global Design Effort Progress and Plans of the Beam Delivery Systems and Machine Detector Interface WG Daniel Schulte (CERN), Brett Parker (BNL), Andrei.
ATF2 Magnets ATF2 Magnets 14 Sep 2007Cherrill Spencer, SLAC. Cooling Solid Wire Sextupoles 1 Report of the effort to cool an old FFTB solid wire sextupole.
Global Design Effort Working Groups A & C Parallel Session Summary IRENG07 A. Herve, T. Markiewicz, T. Sanuki, Y. Sugimoto V. Kuchler, A. Enomoto, J. Osborne.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
ATF2 Magnets ATF2 Magnets 24 October 2006Cherrill Spencer, SLAC October 2006 Annecy Mtg 1 Report on special ATF2 meeting held to “kick- off” France participation.
MEA Machine and Experiment Assembly Norbert Meyners, MEA 12. July 2007ILC IRENG07 WG-A1 LDC Engineering Design (Status) Introduction General Design Detector.
Philip Burrows SiD Monthly Phone Meeting, 4/10/071 IR Issues from IRENG07 Philip Burrows John Adams Institute Oxford University.
Implication of gamma-gamma on 14mr tunnels discussion (questions for discussion with WG-C and WG-A) Valery Telnov Budker INP IRENG07, Sept.19, 2007, SLAC.
Octobre LAL Orsay Report from the IRENG07 workshop at SLAC W. Lohmann, DESY from Septembre 17 – 21, ~ 100 participants - plenary and parallel sessions.
S-BPM Support Issues to be discussed with LAPP and KNU
Experimental Hall in Mountain Regions
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
ILC Interaction Region and Machine Detector Interface
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
CLIC-ILC BDS & MDI work.
Tom Lackowski Revised 10/12/2011
Extract from today’s talk given to DCB
RDR Baseline Layouts for Interaction Region
Presentation transcript:

Global Design Effort BDS updates SLAC 1:30 Monday meeting Andrei Seryi November 5, 2007 Previous update – August 20, 2007

Global Design Effort BDS: 2 Nov 5, 2007 What’s new since Aug.20 ATF2 construction –photos from constructions (thanks to N.Toge) –preparation for December trip –magnets preparation IRENG07 ALCPG07 –put together work packages

Global Design Effort BDS: 3 Nov 5, 2007 ATF2 construction slide show

Global Design Effort BDS: 4 Nov 5, 2007 ATF hall before ATF2 construction

Global Design Effort BDS: 5 Nov 5, 2007 ATF hall emptied Photos from ATF2 construction, N.Toge

Global Design Effort BDS: 6 Nov 5, 2007 Photos from ATF2 construction, N.Toge Build pillars for reinforced floor

Global Design Effort BDS: 7 Nov 5, 2007 Photos from ATF2 construction, N.Toge Build pillars for reinforced floor

Global Design Effort BDS: 8 Nov 5, 2007 Photos from ATF2 construction, N.Toge Building the reinforced floor

Global Design Effort BDS: 9 Nov 5, 2007 Photos from ATF2 construction, N.Toge Finishing the reinforced floor for ATF2

Global Design Effort BDS: 10 Nov 5, 2007 Photos from ATF2 construction, N.Toge Finished reinforced floor for ATF2

Global Design Effort BDS: 11 Nov 5, 2007 Photos from ATF2 construction, N.Toge Prepare ATF2 shielding construction

Global Design Effort BDS: 12 Nov 5, 2007 Photos from ATF2 construction, N.Toge Shielding construction at ATF2

Global Design Effort BDS: 13 Nov 5, 2007 Photos from ATF2 construction, N.Toge Shielding construction at ATF2 Magnets for ATF2 beamline installed

Global Design Effort BDS: 14 Nov 5, 2007 Photos from ATF2 construction, N.Toge Shielding construction at ATF2

Global Design Effort BDS: 15 Nov 5, 2007 Magnet status FD quads –shims inserted to increase aperture –reassembled –buttons to correct 12 pole manufactured –preparing for iterative magnetic measurements and optimization of button size and position Sextuples for FD –cooling circuits (2 nd improved version) being manufactured Integration of FD –will being done by Annecy Bends for FF –manufactured in IHEP, measurements analyzed

Global Design Effort BDS: 16 Nov 5, 2007 Shims added at split plane Modification of QC3 for ATF2 FD Cherrill Spencer Next: measurements & correction of 12 th pole with buttons

Global Design Effort BDS: 17 Nov 5, 2007 Modification of sextupoles for FD Water cooling circuit was added and tested It is being modified now to increase thermal contact with the coil Second cooling circuit then will be also made, for second FD sextupole (Sextupoles are at KEK and planned to be shipped to Annecy for FD integration) Cherrill Spencer

Global Design Effort BDS: 18 Nov 5, 2007 Integration of FD in Annecy Integration of ATF2 Final Doublet will be done in LAPP, Annecy Trying to fit to schedule to make it possible to ship QC3s to LAPP Assembled FD to be sent to KEK in May- June 2008 A.Jeremie, B.Bolzon, N.Geffroy, LAPP

Global Design Effort BDS: 19 Nov 5, 2007 December trip to KEK Ring BPM electronic work – with FNAL Extraction line emittance measurements – with many European colleagues TBT orbit data and analysis Mover software checks …

Global Design Effort BDS: 20 Nov 5, 2007 IRENG07 motivations CFS EXP: ~30% of BDS cost  GOAL: review requirements, perform value engineering

Global Design Effort BDS: 21 Nov 5, 2007 detector B may be accessible during run accessible during run Platform for electronic and services. Shielded. Moves with detector. Isolate vibrations. Concept of single IR with two detectors detector A Motivation #2: Goal: evolve from “Power Point engineering” to real engineering design Slide as of ~Oct 2006

Global Design Effort BDS: 22 Nov 5, 2007 IRENG07 Workshop Graphics logo based on generic IR design made by John Amann, SLAC

Global Design Effort BDS: 23 Nov 5, 2007 WG-A: Overall detector design, assembly, detector moving, shielding. –Including detector design for on-surface assembly and underground assembly procedures. Beamline pacman & detector shielding… Conveners: Alain Herve (CERN), Tom Markiewicz (SLAC), Tomoyuki Sanuki (Tohoku Univ.), Yasuhiro Sugimoto (KEK) WG-B: IR magnets design and cryogenics system design. –Including cryo system, IR magnet engineering design, support, integration with IR, masks, Lumi & Beamcals, IR vacuum chamber... Conveners: Brett Parker (BNL), John Weisend (SLAC/NSF), Kiyosumi Tsuchiya (KEK) WG-C: Conventional construction of IR hall and external systems. –Including lifting equipment, electronics hut, cabling plant, services, shafts, caverns, movable shielding; solutions to meet alignment tolerances... Conveners: Vic Kuchler (FNAL), Atsushi Enomoto (KEK), John Osborne (CERN) WG-D: Accelerator and particle physics requirements. –Including collimation, shielding, RF, background, vibration and stability and other accelerator & detector physics requirements… Conveners: Deepa Angal-Kalinin (STFC), Nikolai Mokhov (FNAL), Mike Sullivan (SLAC), Hitoshi Yamamoto (Tohoku Univ.) WG-A, conveners meeting, July 5 WG-D, conveners meeting, July 11 WG-A, group meeting, July 12 WG-B, conveners meeting, July 13 WG-C, group meeting, July 17 WG-B, group meeting, July 23 WG-C, group meeting, July 24 WG-A, group meeting, July 30 WG-C, group meeting, July 31 WG-D, group meeting, August 1 WG-B, group meeting, August 2 WG-A, group meeting, August 6 WG-C, group meeting, August 7 WG-A, group meeting, August 13 WG-D, group meeting, August 15 WG-B, group meeting, August 16 WG-A, group meeting, August 20 WG-C, group meeting, August 21 WG-A, group meeting, August 27 WG-C, group meeting, August 28 Conveners and IPAC mtg, August 29 WG-B, group meeting, August 30 WG-B, group meeting, September 13 Work in preparation for IRENG07

Global Design Effort BDS: 24 Nov 5, 2007

Global Design Effort BDS: 25 Nov 5, 2007 Explore optimization of IR arrangements during IRENG07 workshop RDR version Optimization was possible due to work of IRENG07 participants, conveners, CFS group and in particular CERN’s Alain Herve, John Osborne and their colleagues address safety– passages around address safety and interference – offset the shafts

Global Design Effort BDS: 26 Nov 5, 2007 Single detector access shaft Was considered as value engineering exercise. Was found in principle possible. However it would create disadvantages for one of experiments and severe interference between them.

Global Design Effort BDS: 27 Nov 5, 2007 To be considered as an alternative for IR layout during EDR: Two shafts offset from the main cavern on the diagonal, to address interferences (in safety and schedule) between loading/unloading areas and working areas

Global Design Effort BDS: 28 Nov 5, 2007 Optimization of surface buildings Considering common or independent building for surface assembly of two detectors. Shared or independent rented gantry cranes, shared shaft cover, etc.

Global Design Effort BDS: 29 Nov 5, 2007 Moving the detector Air-pads at CMS – move 2000k Concept of the platform, A.Herve, H.Gerwig J.Amann View from the bottom

Global Design Effort BDS: 30 Nov 5, 2007 Alain Herve et al Details of the Push-Pull configuration and of the platform

Global Design Effort BDS: 31 Nov 5, *100ton gantry cranes (plus 10tons) Width to be determined GLDc IREN07 : Experimental Cavern Criteria Min distance from beamline to underside of hook = 6.9m+4m = 11m From GLDc min hook coverage = 23m Converging on required coverage and capacity of the crane: one of the drivers of the hall size

Global Design Effort BDS: 32 Nov 5, 2007 Post-IRENG07 optimizations: Cross-section optimized for CERN geology Alain Herve, John Osborne et al

Global Design Effort BDS: 33 Nov 5, 2007 Post-IRENG07 optimizations:

Global Design Effort BDS: 34 Nov 5, 2007 Cross-section optimized for FNAL geology, Tom Lackowskiet al Post-IRENG07 optimizations: 400t 100t 3m wider The RDR 400t crane configuration is planned to be replaced by ~100t version

Global Design Effort BDS: 35 Nov 5, 2007 Cryo, shielding & QD0 design  practical design of integr. cryo system is needed

Global Design Effort BDS: 36 Nov 5, mSv/h Shielding the IR hall Self-shielding case Shielding the “4 th “ with walls, curtain wall and additional concrete around detector Practical design of IR hall shielding, especially for the 4 th concept is needed. (interference of movable wall & curtain walls with cranes)

Global Design Effort BDS: 37 Nov 5, 2007 IR magnets and cryo connections

Global Design Effort BDS: 38 Nov 5, 2007 Vacuum, FD movers, L*… (old location) Vacuum: possibly, need a pump in IR region. Depend on IR pressure requirements (  backgrounds) and detailed design of chamber, its coating, etc. Movers: need to allocate space for FD movers (in addition to other supporting structures). At start, could consider space previously allocated for antisolenoid L*: certain (seems always increasing) value. Final focus length ~proportional to L* => justification is important

Global Design Effort BDS: 39 Nov 5, 2007 ALCPG07 and after At ALCPG: put together 10 GWP, with FTE, etc and submitted to PM Submitted to PM an interim technical leadership structure for BDS area PMs approved this interim structure on Nov 3 GWP leaders and deputies will start the work –… to optimize the EDR deliverables and schedule for each package; to organize the groups work and the reporting structure and to launch their activities to fulfill the EDR goals…