Ventura County Levee Systems Levee Certification Compliance Efforts Presentation to the Ventura County Watershed Protection District Board of Supervisors.

Slides:



Advertisements
Similar presentations
In coordination with FEMA Kickoff Meeting Riverside County, CA May 27, 2010.
Advertisements

Levee Is Not A Four Letter Word…but Levee Is Not a Four Letter Word, But… Natural.
FEMA PROGRAMS II Session Name: FEMA Programs II Coastal Hazards Management Course Amends the Stafford Act Establishes a Pre-Disaster Mitigation Program.
Flood Map Modernization and FEMA Levee Policy February 2008 Doug Bellomo Director, Risk Analysis Division Mitigation Directorate, FEMA.
Levee Decertification & CRS: How a Catch-22 Can Catch You! ASFPM 2011 National Conference Louisville, KY Wednesday, May 17, 2011 ASFPM 2011 National Conference.
US Army Corps of Engineers BUILDING STRONG ® Public Law 84-99, Rehabilitation and Inspection Program Mike deMasi Chief Emergency Management, PL Program.
 WELCOME  Welcome to the home page for the Louisiana Mapping Project (LaMP). The LaMP effort is being undertaken by Department of Homeland Security’s.
Using Mitigation Planning to Reduce Disaster Losses Karen Helbrecht and Kathleen W. Smith United States: Federal Emergency Management Agency (FEMA) May.
Accelerated Post-Fire Flood Analyses Hydraulics URS Group Inc ASFPM National Flood Conference May 19, 2010.
Overview of FEMA Actions and Accomplishments Doug Bellomo July 13, 2009 National Flood Risk Management Summit.
R7Levees.org Presented by: William Zung, PMP, CFM May 24, 2012.
Sacramento District Regional Vegetation Variance Paige Caldwell, P.E. Emergency Manager.
FloodSAFE – how one local agency works to keep its levees and public safe Ann Draper, Assistant Operating Officer National Levee Safety Summit, St. Louis.
International Boundary and Water Commission United States Section Engineering Services Division November 18, 2014 Levee Rehabilitation Projects Lower Rio.
> > > > Association of State Floodplain Managers.
Flood Risk Mapping Project Identifying the Risk Editorial Board Meeting [COMMUNITY NAME] Flood Risk Mapping Project.
Flood Map Modernization Levee Certification Status in FEMA Region VI USACE Red River Levee Meeting Texarkana, Arkansas SW Arkansas Electric CO-OP January.
In coordination with FEMA Scoping Meeting Lake County, California February 19, 2010.
August 2005 Certified Floodplain Manager Program (CFM ® ) Association of State Floodplain Managers (ASFPM)
FEMA’s Role in National Water Policy Supporting National Water Resource Policy Introduction Sandra K. Knight National Waterways Conference September 22-24,
NC Floodplain Mapping Program North Carolina Floodplain Mapping Program Becoming a Cooperating Technical State.
Hydraulic Screening and Analysis Needed for USACE Review
Osceola County Floodplain Program
Using Digital Flood Hazard Data in the National Flood Insurance Program FGDC Coordination Working Group Scott McAfee Paul Rooney April 5 th, 2005.
Flooding & Drainage Committee May 16,  Participate in the National Flood Insurance Program (NFIP)  Participate in the Community Rating System.
USACE Levee Safety Program Presented by Tammy Conforti ASFPM Conference May 2008.
Prepared by National Flood Services Flood Insurance It’s more than just a lender requirement – don’t get left behind… 1.
ASFPM – May 24, 2012 CASE STUDY – 408 PERMITTING AND LEVEE ACCREDITATION FOR WATERLOO, NEBRASKA ASFPM MAY 24, 2012 Presented by Randy Behm, PE, CFM Lalit.
By: Carol Martineau, Acting Assistant Manager, Aircraft Maintenance Division, AFS-301 Date: June 7, 2015 Federal Aviation Administration ASA Conference.
Proposed Benefit Assessment District Overview Three Rivers Levee Improvement Authority (TRLIA) TRLIA.ORG March 10,
Sustainable, Nonstructural Flood Protection for Buildings and Communities Actions and Plans for National Risk Reduction and the Importance of Nonstructural.
An update from the National Committee on Levee Safety Presented to the TWCA by Karin M. Jacoby, PE, Esq. June 17, of 14An Involved Public and Reliable.
Virginia Department of Conservation & Recreation Virginia Dam Safety & Floodplain Programs William G. Browning, Director Dam Safety & Floodplain Management.
Oconee County Hazard Mitigation Plan Update Kickoff Meeting Brian Laughlin Hazard Mitigation Planner Georgia Emergency.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
Hazard Mitigation Planning and Project Funding. Agenda Objectives Overview of Hazard Mitigation Hazard Mitigation Planning Mitigation Project Funding.
Central Valley Flood Protection Board August 9, 2013 Presented by: Michael Mierzwa California Department of Water Resources DWR’s Involvement in Flood.
Overview of Flood Program April Doug Bellomo, Director Risk Analyses Division Mitigation Directorate, FEMA.
Emergency Action Plans for Dams in Texas An EMC’s Role With The EAP Presented By: Megan Dutton, P.E. TCEQ Dam Safety Program.
Flood Map Modernization Flood Map Modernization Mapping the Risk Editorial Board Meeting October 2005 HILLSBOROUGH COUNTY FLOOD MAP MODERNIZATION V
Flood Map Modernization Flood Map Modernization Mapping the Risk Editorial Board Meeting [date] V [COMMUNITY NAME] FLOOD MAP MODERNIZATION.
Developing a National Levee Safety Program Mike Stankiewicz - NCLS Arizona Floodplain Management Association November 3, Update on the National.
FEMA FLOOD INSURANCE STUDY UPDATES City Council Workshop July 7, 2008.
Our Mission MITIGATIONS. MEANING OF MITIGATION MITIGATION IS THE PERMANENT REDUCTION OF THE RISK OF DISASTER MITIGATION IS THE PERMANENT REDUCTION OF.
The Status of NFIP Reform and Floodplain Mapping Mayors’ Water Summit December 8, 2010.
National Levee Safety Act, Title IX, WRDA 2007 Update for Levee Summit Eric Halpin, P.E. Special Assistant for Dam and Levee Safety Headquarters, US Army.
In coordination with FEMA Kickoff Meeting Ventura County, CA April 29, 2010.
Central Connecticut Region Multi-Jurisdictional Hazard Mitigation Plan Advisory Committee Meeting November 17, 2014.
Rediscovering Water Resources and Responsibilities NAFSMA Annual Meeting Flood Management General Session – Levee Safety Luis Rodriguez, Chief, Engineering.
Millbrook Dam Environmental Assessment Study Dan Marinigh CAO/Secretary-Treasurer Otonabee Region Conservation Authority October 20, 2015 Otonabee Conservation.
Polk County Preliminary Digital Flood Insurance Rate Maps City of Windsor Heights Public Meeting Polk County Preliminary Digital Flood Insurance Rate Maps.
Presented to: Central Valley Flood Protection Board August 23, 2013 Sacramento Area Levee Accreditation Key Results from Encroachment Analysis.
US Army Corps of Engineers BUILDING STRONG ® Emergency Response Policy Revision Update ( ER & EP ) Jeffrey Jensen CECW-HS USACE Flood Risk Management.
Montana and the National Flood Insurance Program Marijo Brady, P.E., CFM FEMA Region VIII
Floodplain Management Ordinance Public Hearing September 22, 2009 Floodplain Management Ordinance Public Hearing September 22, 2009.
U.S. Army Corps of Engineers Levee Safety Program US Army Corps of Engineers BUILDING STRONG ® December 2013 Update for the NAFSMA Annual Meeting.
How Katrina Impacted the Corps, and Implications for Those Living Near Water1 Slide1 Examples in Quantifying Flood Risk Presentation to National Flood.
Conservation Development and Planning Department Code Compliance Flow Chart for County Code (Zoning & Land Use) Violations COMPLAINT RESEARCH AND PRIORITIZE.
West Sacramento Area Flood Control Agency November 10, 2011 Update on Current Levee Construction Projects and on the Southport Sacramento River Levee Early.
Polk County Preliminary Digital Flood Insurance Rate Maps City of Clive Public Meeting Polk County Preliminary Digital Flood Insurance Rate Maps November.
City Council Workshop March 27, 2014 Debbie Vascik, CFM Cahoon Consulting.
NAPA COUNTY Conservation Development and Planning Department Code Compliance Flow Chart Building Code Violations 1 COMPLAINT Written complaint (form, letter,
All-Hazard Mitigation Plan Update Susquehanna County Kick-Off Meeting April 28, 2016.
US Army Corps of Engineers BUILDING STRONG ® Huntington District Floodplain Management Services Dan Bailey, CFM Huntington District August 2012.
City of Stockton Levee Flood Protection Status Report January 29, 2008 Agenda Item 4.03.
Prince George’s County Flood Forum March 23, 2017
FLOODPLAIN ADMINSTRATOR DAILY GRIND Roles, Process, Review
Central Valley Flood Protection Plan Senate Bill 5 Amendments
Flood Hazard Area, Flood Insurance and Stormwater Management
FEMA FLOOD INSURANCE STUDY UPDATES
Presentation transcript:

Ventura County Levee Systems Levee Certification Compliance Efforts Presentation to the Ventura County Watershed Protection District Board of Supervisors Tuesday, December 04, Hours Ventura County Government Center A Joint Venture of URS, Dewberry, Schaaf & Wheeler, Airborne 1 and Terrapoint Levees on Santa Paula Creek

Agenda Introductions of District Project Team Present National Flood Insurance Program (NFIP) FEMA Levee Certification Requirements –44 CFR Part Federal Regulatory Standards –Process Guidance FEMA Procedural Memorandum 34 –Process Guidance FEMA Procedural Memorandum 43 Overview of District Levee Certification Efforts Confirmation of FEMA’s Receipt of PAL Agreement Letters on November 28, 2007 District Levee Certification Action Items during the Next Days

What is a Levee ? A levee IS a man-made structure, usually an earthen embankment, designed and constructed in accordance with sound engineering practices to contain, control or divert the flow of water so as to provide protection from temporary flooding. Levees also include floodwalls. A levee is NOT a dam, a detention basin, or a road or railroad embankment Source: FEMA Publication: “PM 43 – Guidelines for Identifying Provisionally Accredited Levees”

Federal Requirements - National Flood Insurance Program: – –National Flood Insurance Act of 1968 – –Flood Disaster Protection Act of 1973 – –Flood Insurance Reform Act of 1994 Current accurate flood maps are critical to: – –Reduce potential loss of life & property through sound floodplain management – –Reduce NFIP & disaster costs – –Protect natural & beneficial values of floodplains Accurate and up to date flood maps are vital for the successful implementation of all floodplain management strategies. Why Update Flood Maps?

Flood Mapping Inventory Ages: Ventura County vs. National Trends

FEMA Levee Certification Requirements FEMA has long been concerned with levee FEMA has long been concerned with levee certifications certifications Initiated Levee Policy Committee to develop Initiated Levee Policy Committee to develop recommendations to NFIP before Katrina in 2005 recommendations to NFIP before Katrina in 2005 “Accreditation” vs. “Certification” “Accreditation” vs. “Certification” FEMA certify levees. Levee owners do. FEMA does not certify levees. Levee owners do. FEMA certified levees on effective FEMA accredits certified levees on effective DFIRMs. DFIRMs.

(44 CFR 65.10), which was adopted on August 25, 1986 For the purpose of NFIP maps, FEMA will only recognize levee systems that meet and continue to meet design, operational and maintenance criteria of the Code of Federal Regulations, Title 44, Section (44 CFR 65.10), which was adopted on August 25, 1986 Certification Criteria broken down into 6 key components: – –Operations and Maintenance Plan – –Freeboard – –Closures – –Embankment and foundation stability – –Interior Drainage – –Other Design Criteria Code of Federal Regulations (44 CFR 65.10)

FEMA Procedural Memorandum 34 “Interim Guidance for Studies Including Levees” PM 34 PM 34 issued on August 22, 2005 (before Katrina) Nationwide there are thousands of levee structures with inadequate, missing, or outdated certification documentation PM 34 was issued as part of the larger Map Modernization effort PM 34 Provides flowchart for identifying and mapping levees depending on certification

PM 34 - Levee Certification Paths

FEMA PM 34 – Interim Guidance for Studies Including Levees needs FEMA’s bottom line: If a levee is shown on a FIRM map as providing protection from the base flood, then it needs to be certified. Unrealistic! Original FEMA time table required local levee owners to submit certification documentation - 30 days. Unrealistic! Local Communities and levee owners objected strenuously. Local Communities and levee owners objected strenuously. In response, FEMA issued Procedural Memorandum 43 on September 26, 2006 In response, FEMA issued Procedural Memorandum 43 on September 26, 2006

FEMA Procedural Memorandum 43 “Guidelines for Identifying Provisionally Accredited Levees (PAL)” PM 43 was issued September 25, 2006 and revised March 16, 2007 Those levees that require additional time for owners to compile the certification documentation will be designated by FEMA as “Provisionally Accredited” Two Year PAL Letter –FEMA provided the District with a 90 day window to sign and return PAL agreements indicating the full 44 CFR documentation will be provided within 24 months of the signed agreement

FIRM Levee Note: The following note must be applied at several locations, point to the levee, and be placed landward of the levee in or near the Zone X (shaded) area: –WARNING: Provisionally Accredited Levee. For explanation, see the Notes to Users. FIRM Notes to Users: –WARNING: This levee, dike, or other structure has been provisionally accredited and mapped as providing protection from the 1-percent- annual-chance flood. To maintain accreditation, the levee owner or community is required to submit documentation necessary to comply with 44 CFR Section by (September 01, 2009). Because of the risk of overtopping or failure of the structure, communities should take proper precautions to protect lives and minimize damages n these areas, such as issuing an evacuation plan and encouraging property owners to purchase flood insurance. Notes for PAL Levees Shown on FIRMs

FEMA PM 43 – Guidelines for Identifying Provisionally Accredited Levees (PAL) Flood Insurance Mapping Consequences of failure to meet the certification standards of 44 CFR 65.10: –If a levee fails to meet the criteria in 44 CFR 65.10, or a levee owner fails to meet the PAL requirements, then the levee and the area landward of it will no longer be eligible for the PAL designation or accreditation. FEMA will remove the PAL designation from the levee, and will remap the area landward of the levee as being a Special Flood Hazard Area (Zone A in most cases).

Provisionally Accredited Levee (Scenario A) Process Scenario A applies to levees that are not in the US Army Corps of Engineers Rehabilitation and Inspection Program.

PAL Agreement Letter (Scenario A1) FEMA Letter dated August 31, 2007 PAL Letters to FEMA Nov. 27, 2007 Certification completion date for Scenario A1 levees is September 01, 2009

Maintenance Correction Period (Scenario A2) FEMA Letter dated August 31, 2007 Letters to FEMA Nov. 27, 2007 PAL Letter to FEMA NLT Nov. 29, 2008 Certification completion date for Scenario A2 levees is November 29, 2010.

FEMA Originally Identified 60 Levees and/or Levee-Like Situations Data from FEMA letter dated August 31, 2007

FEMA’s Consultant Issued Revised List ( ) Nine “Blue” Levee Like Situations Removed

Map of District Levee Inventory

District Levee System Inventory List

Map of Seventeen District Levees: PAL Agreements or Maintenance Correction Period Request to FEMA on

List of Seventeen District Levees: PAL Agreements or Maintenance Correction Period Request to FEMA on

Levees Not Submitted by District for Certification

PAL Agreement Letter (Scenario A1)

Maintenance Correction Period Letter (Scenario A2)

Estimated Fiscal Impacts of Levee Certification Efforts on District’s Budgets by Watershed Zone

District’s Levee Certification Action Items Completed Action Items –PAL Agreement Letter signatures All PAL letters were signed by District and local reps by 26 November 2007 –Maintenance Issue Correction Period Request signatures Maintenance Correction period requests signed by District on 20 November 2007 –PAL package preparation & compilation PAL packages were completed by and submitted to FEMA Region IX’s Office in Oakland on 27 November 2007 via FedEX Priority Overnight –FEMA Region IX’s Acknowledgement of Receipt of District’s Agreement Packages FEMA acknowledged receipt of District PAL packages forwarded on 28 November 2007  Certification Action Items in Next Days -RFQ scope preparation and issue -Estimated within next 45 calendar days -Consultant selection -Estimated within next 90 calendar days -Board Approval of Professional Services Contract -Estimated within next 120 Days

Questions Contact Information: Contact Information: Gerard Kapuscik Special Projects Manager (805) Joseph Lampara, Engineer III Advanced Planning Section Watershed Protection District (805) Calleguas Creek