1 Long Term Monitoring JPSS Algorithm Team Presented by Date.

Slides:



Advertisements
Similar presentations
Software Quality Assurance Plan
Advertisements

PROJECT TITLE Project Leader: Team: Executive Project Sponsor (As Required): Date: Month/Day/Year 110/17/2014 V1.
Stoimen Stoimenov QA Engineer SitefinityLeads, SitefinityTeam6 Telerik QA Academy Telerik QA Academy.
Project Management.
OHT 6.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Development plan and quality plan objectives The elements of the development.
Calibration Working Group L1b Cal/Val Update 1 Presented by Changyong Cao NOAA/NESDIS/STAR GOES-R Calibration Working Group January 9, 2014.
OHT 6.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Development plan and quality plan objectives The elements of the development.
Investment Request Insert Name of Project Executive Sponsor(s): Insert name(s) Project Owner: Insert name.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
1 Validated Stage 1 Science Maturity Review for {JPSS Algorithm} Presented by Date.
NPOESS Data Quality Monitoring (DQM) Interface Functionality at DoD Centrals Update COPC Action Item Jim Vermeulen 13 November 2008.
Best Practices By Gabriel Rodriguez
Copyright 2010, The World Bank Group. All Rights Reserved. Statistical Work Plan Development Section B 1.
Sentinel-3 Validation Team (S3VT) Meeting ESA/ESRIN, Frascati, Italy, th November 2013 General Presentation Template for S3VT meeting Project name.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
1 SPSRB Decision Brief on Declaring a Product Operational Instructions / Guidance This template will be used by NESDIS personnel to recommend to the SPSRB.
Project Status Report Presenter Name Presentation Date.
CS 3610: Software Engineering – Fall 2009 Dr. Hisham Haddad – CSIS Dept. Chapter 2 The Software Process Discussion of the Software Process: Process Framework,
GOES Users’ Conference IV May 1-3, 2006 Broomfield, CO Prepared by Integrated Work Strategies, LLC 1 GOES USERS’ CONFERENCE IV: Discussion Highlights Algorithm.
JPSS Common Ground System IDPS NPP Algorithm Operability Verification – Launch Build Characterization Tentative Agenda IDPS OAA 5/10/11.
Some Thoughts on Transitioning to NPP Paul Menzel (with input from Jeff Myers) Issues Continuing MODIS through NPP/NPOESS and beyond Preparing for VIIRS.
GOES Users’ Conference III May 10-13, 2004 Broomfield, CO Prepared by Integrated Work Strategies, LLC GOES USERS’ CONFERENCE III: Discussion Highlights.
KS3 Phase4 Client Server Monitoring System October 1, 2008 by Stephen, Seema, Kam, Shpetim.
Example Template for Project Presentation
Fleming College Quality and Risk Management Review Summary February 2, 2006.
Objectives: Develop a solution to either enhance or replace the FasTrak tool Scope/Why is this important?: Increase the transparency for issues that are.
1 Fault-Based Analysis: Improving IV&V Through Requirements Risk Reduction '02 Jane Hayes Rama Bireddy D.N. American SAIC Department of Computer Science.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
Module 1: Introducing Windows Server 2003 Network Infrastructure Planning, Tools, and Documentation.
Validate Scope What we have: Requirement Traceability Matrix Verified Deliverables What we do: Inspection What we get: Accepted Deliverables.
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Cal/Val Tasks Status 13 January 12 Kris Robinson (781)
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Preparing the Proposal Designing and Supporting Computer Networks – Chapter 9.
EO Dataset Preservation Workflow Data Stewardship Interest Group WGISS-37 Meeting Cocoa Beach (Florida-US) - April 14-18, 2014.
GOES-R Hurricane Intensity Estimation (HIE) Winds-HIE Application Team Chris Velden & Tim Olander (CIMSS) Jaime Daniels (STAR)
Joint Polar Satellite System (JPSS) Common Ground System (CGS) Rapid Algorithm Updates Kerry Grant, JPSS CGS Chief Engineer Raytheon Intelligence and Information.
1 ERCOT Retail Release Overview. 2 How Are Changes Managed? Retail Testing Business Teams Development Teams Release Management Management of: Migration.
Thomas Jefferson National Accelerator Facility Page 1 Overview Talk Content Break-out Sessions Planning 12 GeV Upgrade Software Review Jefferson Lab November.
1 GOES-R AWG Product Validation Tool Development Hydrology Application Team Bob Kuligowski (STAR)
N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N NPP DATA ACCESS Mitch Goldberg JPSS Program Scientist June 21, 2012.
SDR/EDR Overview Template Name of the Product: (SDR/EDR) Product Contributors: (SDR/EDR) Team Date: August xx, 2015.
V-Shaped Software Development Life Cycle Model. Introduction: Variation of water fall model. Same sequence structure as water fall model. Strong emphasis.
JPSS Common Ground System Operational Algorithm Status – Launch Build Characterization Tentative Agenda IDPS OAA 4/5/11.
User readiness for the next generation of meteorological satellites Stephan Bojinski, Mikael Rattenborg World Meteorological Organization (WMO) Space Programme.
Sample Fit-Gap Kick-off
Participating SDR Team Members Cross-track Infrared Sounder
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
NESDIS-JMA AHI Collaboration
Enterprise Algorithm Change Process
JTAMS PRE-MILESTONE B ANALYSIS
Presenter Name | Company Name
Aqua MODIS Reflective Solar Bands (RSB)
CPMGT 300 Competitive Success/snaptutorial.com
CPMGT 300 Education for Service/snaptutorial.com.
CPMGT 300 Teaching Effectively-- snaptutorial.com.
Phase 1 Tollgate Review Discussion Template
Insert subhead here Project Status.
GOES-R AWG Product Validation Tool Development
Presenter Name | Company Name
GSICS MW products and a path forward.?
Cell Deployment Process
Presenter Name | Company Name
Recent Activities of Ocean Surface Topography Virtual Constellation (OST-VC) Remko Scharroo (EUMETSAT)
Recent activities of OCR-VC
Presenter Name | Company Name
Full Title of Research Proposal
Recent activities of the OSVW-VC
Presenter Name | Company Name
Preparing the Proposal
Presentation transcript:

1 Long Term Monitoring JPSS Algorithm Team Presented by Date

2 OUTLINE Products (1 slide) Algorithm Cal/Val Timeline (1 slide) Monitoring Methods/Strategies (1-2 slides) Monitoring Tools (4-5 slides) Resources (1 slide) Further Enhancements and Schedules (1-2 slides) Summary (1 slide)

Products Provide a list of products and their specifications (spatial and temporal resolution, coverage). 3

Algorithm Cal/Val Timeline Four Phases of Cal/Val: 1.Pre-Launch; all time prior to launch – Algorithm verification, sensor testing, and validation preparation 2.Early Orbit Check-out (EOC) – System Calibration & Characterization 3.Intensive Cal/Val (ICV) – Algorithm Calibration & Validation 4.Long-Term Monitoring (LTM); through life of sensors after ICV (Validated) – Sensor Stability & Data Product Quality monitoring Algorithm Cal/Val Timeline 4 LTM Pre_Launch EOCICV Launch BetaProvisionalValidated

Monitoring Methods/Strategies Highlight/summarize monitoring methods/strategy of your products Identify monitoring tools that are needed and being developed 5

Monitoring Tools Describe and illustrate the monitoring tools that your team have or are developing Address the following: – Capabilities (in their final state) – Web-based/offline applications – Data Source, where/how these are obtained – Visualization software tools used for monitoring – Product performance measures – NRT monitoring capabilities 6

What computer resource are you using? Dependencies on data input Risk related to monitoring & mitigation External contributors 7 Resources

Planned further improvements/enhancements Planned LTM activities / milestones 8 Further Enhancements and Schedules

9 Summary