SEPO Training - Code Review & Design Review by Amanda.

Slides:



Advertisements
Similar presentations
Site Visit Review Just-in-Time Training. Pre-work and Training Judging Examiner Evaluation Process Stage 1 Independent Review Stage 2 Consensus Review.
Advertisements

Connect Team Connect Team Outside Contrib Outside Contrib Unscheduled Backlog Bugs Feature Requests BA Review Requirement Docs Epic Large Tasks or Features.
Halton Housing Trust Customer Scrutiny Panel An introduction to our Service Reviews.
By Guy Yariv Project Closure – Finally…
SAP Jam Kickoff Meeting (your name here) April 11, 2013 © Copyright All rights reserved.
<<replace with Customer Logo>>
T Seminar on Network Security Today’s agenda 1.Seminar arrangements 2.Advice on the presentation.
Analysis Super User Discussion April 16, 2015 To dial in, use this phone number and participant code… Phone number: Participant code:
Effort in hours Duration Over Weeks Or Months Inception Launch Web Lifecycle Methodology Maintenance Phases Copyright Wonderlane Studios.
Change Management Demo for IT 11/06/2013 Change Management, IT Meeting 11/06/
Test Reporting Best Practices By Gabriel Rodriguez.
Training for Technical Session Organizers. Training for Technical Session Organizers Table of Contents 1.Understanding the Paper Development Process 2.Evaluating.
> Blueprint Kickoff >. Introductions Customer Vision & Success Criteria Apigee Accelerator Overview Blueprint Schedule Roles & Responsibilities Communications.
Kickoff Meeting Jam 11/18/2011 © Copyright All rights reserved.
© 2009 GroundWork Open Source, Inc. PROPRIETARY INFORMATION: Information contained herein is not for use or disclosure outside of GroundWork Open Source,
Welcome to MLEC Open House English II and VI Ms. Ramontal.
Implementing ISO 9001 Our project plan Copyright ©2008 The 9000 Store.
Library Services CDRS Requirements Report February 9, 2001.
Pass SOX security audits and Improve XA security CISTECH Security Solutions Belinda Daub, Senior Consultant Technical Services
Access Online Cardholder Transaction Approval Training 1 Client Logo.
T Seminar on Network Security Today’s agenda 1.Seminar arrangements 2.Advice on the presentation.
Reviewing the Eight-Step SWIS Process Florida’s Positive Behavior Support Project University of South Florida.
CSE Senior Design II Day 1: Getting Organized Spring 2015 Instructor: Manfred Huber.
Community Board Orientation 2- Community Board Orientation 7-1.
Agenda  Project Overview  Project Goal & Scope  Estimates  Deadline  Project Environment  Delivery Plan  Project Plan  Team Structure  Risk Analysis.
Management Software For Engineering Project Management
Inspection and Review The main objective of an Inspection or a Review is to Detect Defects. (Today -there may be some other goals or broader definition.
Good Audit Documentation Mike Bishop. What can go wrong What can go wrong How we might fix it How we might fix it Brainstorm Brainstorm.
Data Science for NIST Big Data Framework Dr. Brand Niemann Director and Senior Data Scientist/Data Journalist Semantic Community
ACP Finance DC FB 4.Appointment of Taskforce Team Taskforce Team 5.Environment Scanning Plan (ESP) 8.Potential & feasible? 7.Confirm the ESP Result 10.Detailed.
Reviews mae, fall 11. Review What: – Have skilled people assess your work –Requires that you have work product that is reviewable Why: – Find problems.
Unit Test Process Authors:Sergey Fedorov, Dmitry Balkin, Dmitry Korenkov June 2005.
Doc.: IEEE /0054r0 Submission March 2013 Mika Kasslin, NokiaSlide 1 TG1 Closing Report for March 2013 Notice: This document has been prepared.
Summer Institute Session Team Leaders Check-In April 10 th, 2013 Re Mute Your Computer!!! Welcome! We will begin at 10:00 am I will move you to panelist,
Copyright © 2014 Oracle and/or its affiliates. All rights reserved. | SLC User Group May 5th th 2015.
Introduction to Engineering Lab 1 – 3 Report & Project Notebook Agenda Complete & turn in Lab 1 Report Learn requirements for Project Notebook.
CSE Senior Design II Day 1: Getting Organized Spring 2012 Instructor: Mike O’Dell.
WELCOME BACK SENIORS!! AUGUST 27,
Page ADP PearsonAccess Proctor Training. Page Agenda Test Overview Testing Components Proctor Roles and Responsibilities Overview Administering the Test.
© Copyright 2008, Information Control Corporation. All rights reserved. Project Management Bytes Making WBS work for you! 1.
Day 1: Getting Organized Spring 2014
Documentation Guidelines
The Vertically-Integrated Projects (VIP) Program: Integrating Undergraduate Education and Graduate Research Bloom, B. S. (Ed.). (1956). Taxonomy of educational.
Testing Process Roman Yagodka ISS Test Leader.
Air Force Insurance Fund (NAF): How to File a Death Claim
doc.: IEEE <doc#>
Architecture Kickoff.
In submission for the USC CSCI 577b Individual Presentation
Online Performance Evaluation Tool
May 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Proposed Resolution To The FCC Part
Summer Institute Session Team Leaders Check-In
Day 1: Getting Organized Fall 2013
Inspection and Review The main objective of an Inspection or a Review is to detect defects. (Not for Giving Alternative Solutions) This activity and procedure.
Day 1: Getting Organized Spring 2013
Development Lifecycle
May 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Proposed Resolution To The FCC Part
<month year> doc.: IEEE ptc November 2012
<Project Name> Milestone Summary Report
QA Reviews Lecture # 6.
The Software Testing Life Cycle
Day 1: Getting Organized Spring 2011
平成31年4月 doc.: IEEE /424r1 November 2007
doc.: IEEE <doc#>
Submission Title: TG4m 4TV Closing Report for September 2013
Executive Project Kickoff
May 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Proposed Resolution To The FCC Part
Speaker’s Name, SAP Month 00, 2017
ONAP Release Planning DRAFT Proposal
Presentation transcript:

SEPO Training - Code Review & Design Review by Amanda

Confidential and proprietary Copyright 2011 / TELENAV GPS Navigator Always Find Your Way! /  Independent Code Review  Design Review by System Agenda

Confidential and proprietary Copyright 2011 / TELENAV GPS Navigator Always Find Your Way! / Process of Independent Code Review Assign Reviewer Owner: PJM Create Task on JIRA Owner: Reviewer Assign to DEV Lead Sign Reviewer’s Name on Release Note Owner: DEV Lead Code Ready Owner: DEV Lead Studio – Code Freeze Others – 1 st Submission Cross Component, Cross Team, Cross Group; Senior Engineer \\fs1\Program Office\Quality\Reviewers for Independent Code Review Accept and Review w/o Introduction Owner: Reviewer Review Comments Only (Necessary comments in the corresponding place; Refer to Coding Standard) Code Review Meeting Owner: Reviewer & DEV Lead Accept the build by Checking Release Note Owner: QA Resolved the Task by DEV Lead 1.Meeting is recommended, but not mandatory. 2.Reviewer shares thoughts with developers.

Confidential and proprietary Copyright 2011 / TELENAV GPS Navigator Always Find Your Way! / For PJM Assign Reviewer Owner: PJM Create Task on JIRA Owner: Reviewer Assign to DEV Lead Sign Reviewer’s Name on Release Note Owner: DEV Lead Code Ready Owner: DEV Lead Studio – Code Freeze Others – 1 st Submission Cross Component, Cross Team, Cross Group; Senior Engineer \\fs1\Program Office\Quality\Reviewers for Independent Code Review Accept and Review w/o Introduction Owner: Reviewer Review Comments Only (Necessary comments in the corresponding place; Refer to Coding Standard) Code Review Meeting Owner: Reviewer & DEV Lead Accept the build by Checking Release Note Owner: QA Resolved the Task by DEV Lead 1.Meeting is recommended, but not mandatory. 2.Reviewer shares thoughts with developers.

Confidential and proprietary Copyright 2011 / TELENAV GPS Navigator Always Find Your Way! / For DEV Lead Assign Reviewer Owner: PJM Create Task on JIRA Owner: Reviewer Assign to DEV Lead Sign Reviewer’s Name on Release Note Owner: DEV Lead Code Ready Owner: DEV Lead Studio – Code Freeze Others – 1 st Submission Cross Component, Cross Team, Cross Group; Senior Engineer \\fs1\Program Office\Quality\Reviewers for Independent Code Review Accept and Review w/o Introduction Owner: Reviewer Review Comments Only (Necessary comments in the corresponding place; Refer to Coding Standard) Code Review Meeting Owner: Reviewer & DEV Lead Accept the build by Checking Release Note Owner: QA Resolved the Task by DEV Lead 1.Meeting is recommended, but not mandatory. 2.Reviewer shares thoughts with developers. 3.Reviewer calls it.

Confidential and proprietary Copyright 2011 / TELENAV GPS Navigator Always Find Your Way! / For Reviewer Assign Reviewer Owner: PJM Create Task on JIRA Owner: Reviewer Assign to DEV Lead Sign Reviewer’s Name on Release Note Owner: DEV Lead Code Ready Owner: DEV Lead Studio – Code Freeze Others – 1 st Submission Cross Component, Cross Team, Cross Group; Senior Engineer \\fs1\Program Office\Quality\Reviewers for Independent Code Review Accept and Review w/o Introduction Owner: Reviewer Review Comments Only (Necessary comments in the corresponding place; Refer to Coding Standard) Code Review Meeting Owner: Reviewer & DEV Lead Accept the build by Checking Release Note Owner: QA Resolved the Task by DEV Lead 1.Meeting is recommended, but not mandatory. 2.Reviewer shares thoughts with developers.

Confidential and proprietary Copyright 2011 / TELENAV GPS Navigator Always Find Your Way! / For QA Assign Reviewer Owner: PJM Create Task on JIRA Owner: Reviewer Assign to DEV Lead Sign Reviewer’s Name on Release Note Owner: DEV Lead Code Ready Owner: DEV Lead Studio – Code Freeze Others – 1 st Submission Cross Component, Cross Team, Cross Group; Senior Engineer \\fs1\Program Office\Quality\Reviewers for Independent Code Review Accept and Review w/o Introduction Owner: Reviewer Review Comments Only (Necessary comments in the corresponding place; Refer to Coding Standard) Code Review Meeting Owner: Reviewer & DEV Lead Accept the build by Checking Release Note Owner: QA Resolved the Task by DEV Lead 1.Meeting is recommended, but not mandatory. 2.Reviewer shares thoughts with developers.

Confidential and proprietary Copyright 2011 / TELENAV GPS Navigator Always Find Your Way! / Design Review by System Ask for Review Mail to Rong Xing Owner: PJM Introduction and Q&A Meeting Owner: PJM / DEV / System / QA FSD/Design Doc Ready Owner: DEV Rong Xing will schedule the meeting. Reviewed Content: 1.Architecture Review 2.Finalize Key Function Point Studio – Review before Coding Others – At least ONCE in 3 months For Studio Project, like 7.1, 7.2, Main Components are enough. Assign 2 Reviewers for each Component Owner: Rong Xing Slides Preparation Owner: DEV Sign Reviewers’ Name and Review Date on Release Note Owner: DEV Lead Accept the build by Checking Review Date is within 3 months Owner: QA (from Apr 1 st ) Create Task on JIRA Owner: System Assign to DEV Lead Resolved the Task by DEV Lead

Confidential and proprietary Copyright 2011 / TELENAV GPS Navigator Always Find Your Way! / For PJM Ask for Review Mail to Rong Xing Owner: PJM Introduction and Q&A Meeting Owner: PJM / DEV / System / QA FSD/Design Doc Ready Owner: DEV Rong Xing will schedule the meeting. Reviewed Content: 1.Architecture Review 2.Finalize Key Function Point Studio – Review before Coding Others – At least ONCE in 3 months For Studio Project, like 7.1, 7.2, Main Components are enough. Assign 2 Reviewers for each Component Owner: Rong Xing Slides Preparation Owner: DEV Sign Reviewers’ Name and Review Date on Release Note Owner: DEV Lead Accept the build by Checking Review Date is within 3 months Owner: QA (from Apr 1 st ) Create Task on JIRA Owner: System Assign to DEV Lead Resolved the Task by DEV Lead

Confidential and proprietary Copyright 2011 / TELENAV GPS Navigator Always Find Your Way! / For DEV Ask for Review Mail to Rong Xing Owner: PJM Introduction and Q&A Meeting Owner: PJM / DEV / System / QA FSD/Design Doc Ready Owner: DEV Rong Xing will schedule the meeting. Reviewed Content: 1.Architecture Review 2.Finalize Key Function Point Studio – Review before Coding Others – At least ONCE in 3 months For Studio Project, like 7.1, 7.2, Main Components are enough. Assign 2 Reviewers for each Component Owner: Rong Xing Slides Preparation Owner: DEV Sign Reviewers’ Name and Review Date on Release Note Owner: DEV Lead Accept the build by Checking Review Date is within 3 months Owner: QA (from Apr 1 st ) Create Task on JIRA Owner: System Assign to DEV Lead Resolved the Task by DEV Lead

Confidential and proprietary Copyright 2011 / TELENAV GPS Navigator Always Find Your Way! / For System Ask for Review Mail to Rong Xing Owner: PJM Introduction and Q&A Meeting Owner: PJM / DEV / System / QA FSD/Design Doc Ready Owner: DEV Rong Xing will schedule the meeting. Reviewed Content: 1.Architecture Review 2.Finalize Key Function Point Studio – Review before Coding Others – At least ONCE in 3 months For Studio Project, like 7.1, 7.2, Main Components are enough. Assign 2 Reviewers for each Component Owner: Rong Xing Slides Preparation Owner: DEV Sign Reviewers’ Name and Review Date on Release Note Owner: DEV Lead Accept the build by Checking Review Date is within 3 months Owner: QA (from Apr 1 st ) Create Task on JIRA Owner: System Assign to DEV Lead Resolved the Task by DEV Lead

Confidential and proprietary Copyright 2011 / TELENAV GPS Navigator Always Find Your Way! / For QA Ask for Review Mail to Rong Xing Owner: PJM Introduction and Q&A Meeting Owner: PJM / DEV / System / QA FSD/Design Doc Ready Owner: DEV Rong Xing will schedule the meeting. Reviewed Content: 1.Architecture Review 2.Finalize Key Function Point Studio – Review before Coding Others – At least ONCE in 3 months For Studio Project, like 7.1, 7.2, Main Components are enough. Assign 2 Reviewers for each Component Owner: Rong Xing Slides Preparation Owner: DEV Sign Reviewers’ Name and Review Date on Release Note Owner: DEV Lead Accept the build by Checking Review Date is within 3 months Owner: QA (from Apr 1 st ) Create Task on JIRA Owner: System Assign to DEV Lead Resolved the Task by DEV Lead

Confidential and proprietary Copyright 2011 / TELENAV GPS Navigator Always Find Your Way! /  amoffice/Independent+Code+Review amoffice/Independent+Code+Review  amoffice/Design+Review+by+System amoffice/Design+Review+by+System Official Wiki

Thanks!