Endesa Colombia Our Distribution System In Front Of The Development Of Colombia.

Slides:



Advertisements
Similar presentations
1 Smart Grid Vision Electric Grid Modernization Steering Committee Grid Facing Technology Subcommittee January 14, 2013.
Advertisements

DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
ADVANCED MANAGEMENT OF A CLOSED RING OPERATED MV NETWORK: ENEL DISTRIBUZIONE’S P4 PROJECT. Simone Botton, Roberto Calone, Luigi D’Orazio, Alessandro Fatica,
Washington DC October 2012 A Vision for an Advanced Supervision and Control System for the Electric Grid Ramón A. León XM S.A. E.S.P Colombia.
Dynamic Distribution Grids © 2012 San Diego Gas & Electric Company. All trademarks belong to their respective owners. All rights reserved. Neal Bartek.
Smart Urban Low Voltage Network Low Carbon Network Fund Tier 1 Project UK Power Networks & TE Connectivity.
Building A Smarter Grid Through Distribution Automation DOE Projects OE & OE April 2013 Copyright © 2012 Consolidated Edison Company of New.
1 Pacific Gas & Electric Company MTS: Evolution of the Electric Distribution System Manho Yeung, Senior Director, System Planning and Reliability PG&E.
Spencer Murray, Sr. Telecom Eng. Distribution Automation.
A Specific application of SCADA (Supervisory Control And Data Acquisition): Feeder Automation System for Medium Voltage Distribution Networks of Istanbul.
Smart Grids for Future City May Mln Clients 45 Mln Smart Meters 30 Countries 96 GW Installed Capacity 2.
© ABB Group June 10, 2015 | Slide 1 1MRS A self healing power system for the accurate fault location and zone concept T&D Smart Grids Europe 2012.
August 8, 2015ECI Confidential. AccessWave Smart Grid Market Trends& Applications Matthias Nass VP Field Marketing EMEA.
Greenbench: A Benchmark for Observing Power Grid Vulnerability Under Data-Centric Threats Mingkui Wei, Wenye Wang Department of Electrical and Computer.
12/10/14 Advanced Metering Infrastructure Smart Grid Boot Camp IIT Delhi Oct 12, 2014 bindoo srivastava.
Business Models and Scaling Up Successes Maintaining Interoperability By Open-Standards Design in The Power Distribution For Smarter Grid Khalid W. Darwish,
CITY OF LAKE WORTH, FLORIDA UTILITIES DEPARTMENT A Look at our Electric Utility A Plan For The Future.
Future of Smart Metering Kansas Renewable Energy & Energy Efficiency Conference September 26, 2007.
1 Some Issues about Big Data in Power Grid Gary Quan.
Module 5, Unit A Vocabulary Review Game. 2 pt 3 pt 4 pt 5pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2pt 3 pt 4pt 5 pt 1pt 2pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4pt.
Frankfurt (Germany), 6-9 June 2011 ROSA – PT – S3 – 0249 EDP DISTRIBUTION AUTOMATION (r)EVOLUTION.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
Medium Voltage products Energy reliability & revenue improvement Speaker: Jean-Yves Pocthier - Schneider Electric France Technical solution for improvement.
Electrical Distribution Training
Frankfurt (Germany), 6-9 June 2011 Smart Grid Protection in China Wu Guopei Guangzhou Power Supply Bureau Guangdong Power Grid, China.
© ABB PTMV - 1, ABB Overhead Distribution Systems.
Distribution Planning Use of SMART Distribution Automation Control System (DACS) Presented by: Ed Briggs, P.E. Created by: Ed Briggs & Greg Wickliffe
Assumption University Thailand EE4503 Electrical Systems Design Main Circuit 1.
Frankfurt (Germany), 6-9 June 2011  PV in Spain: Basically Large plants connected to MV or HV Mainly in rural areas (generation exceeds consumption) 3,000.
Unit 5 CONTROL CENTERS AND POWER SYSTEM SECURITY.
A low - cost high performance MV RMU with circuit breakers for use in remote controlled MV / LV substations Fabio GIAMMANCO Luca GIANSANTE 1 1.
Oncor Electric Delivery Intelligent Grid at Oncor Electric Delivery SWEDE Conference Alan Bern – SCADA / Automation Manager May 1, 2008.
Situational Awareness UPDEA - Workshop. Awareness of the Situation 25,623 Alarms in 8 Hours 53 Alarms / min (average) 80% Are consequential Things to.
MV Network Operation and Control Barcelona May 2003 Eugenio Di Marino Italy Session 3 Alpha 1 Block 1.
Frankfurt (Germany), 6-9 June 2011 Louise Jakobsen, Danish Energy Association – Denmark – Session 3 – Paper 0811 Louise Jakobsen, Danish Energy Association.
Frankfurt (Germany), 6-9 June 2011 KOSTIAINEN– FI – S3– 0622 Paper 0622 TOWARDS SELF-HEALING POWER DISTRIBUTION BY MEANS OF THE ZONE CONCEPT  Antti Kostiainen,
Automation Presentation to KIB-TEK, Northern Cyprus (19/09/2007)
Utility Engineers, PC.  Generation  Transmission  Distribution.
Steady State Analysis Of A Microgrid Connected To A Power System
1 A Case Study of Extensive Automation in London Cliff Walton & Bob Jackson.
EECE 887 Distribution System Engineering CHAPTER 1 Power Delivery Systems.
Distribution Systems-General
MIT requirements from the TSO perspective MIDDLEWARE IMPROVED TECHNOLOGY (MIT) for increased resilience of Interdependent Critical Infrastructure ROME,
A SEMINAR ON 400 KV GSS(RRVPNL) BIKANER.
FOR OVER 100 YEARS…LIFE. POWERED BY EDISON. Southern California Edison Presentation to City of Palos Verdes Estates December 13, 2011 Marvin Jackmon, Regional.
Copyright © Central Lincoln PUD and SEL 2015 Communications-Capable Fault Indicators Improve Outage Response for Coastal Oregon Shamus Gamache Central.
Loop-Sectionalizing Automation Scheme Colin Hawthorne 4/26/2016.
Dr. Vidya Vankayala Director, Grid Modernization (604) Richard Guo
Distribution Automation The utilization of IEDs (Intelligent Electronic Devices) and advanced communications to unlock the benefits of operational efficiency.
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
This module will dig deeper into Smart Grid implementation issues. It will focus on two key issue of particular interest to the PNW: 1)How the Smart Grid.
Artificial Intelligence In Power System Author Doshi Pratik H.Darakh Bharat P.
Sub Station.
Introduction to the Electric System
Intelligent grid expansion – RheinEnergie AG, Germany
Overhead Distribution Systems
SHORT CIRCUIT MONITORING BY USING PLC & SCADA
Local Intelligent Circuit Breakers – A New Concept for the Refurbishment of Existing Distribution Network Pavel Novak – Germany – Session 1.
35kV Assessment SWEDE 2007 May 10, 2007.
Presented by: LADWP November 14, 2017
Oliver SCHROEDEL, Michael SCHWAN, Sven KOEPPE, Robert ROSENBERGER
Irvine Smart Grid Demonstration Distribution Volt / Var Control
University of Ljubljana, Faculty of Electrical Engineering - Slovenia
Sami Repo Tampere University of Technology FINLAND
Utilizing the ring operation mode of MV distribution feeders
Moxa Smart Grid Technology Portfolio
Pauli Partinen Mikael Aikio
Cyber Security of SCADA Systems Remote Terminal Units (RTU)
Distribution Automation Practices at
Presentation transcript:

Endesa Colombia Our Distribution System In Front Of The Development Of Colombia

00 Agenda Our Distribution System in front of the development of Colombia 1.Introduction 2.Background (The current situation in front of the development of the energy demand, current configuration outline and regulation requirements) 3.Plan of Action of Endesa Colombia (Approach on the development of the City-Region, reliability and quality service. Strategic focus to use of new technologies “Smart Grid”) 4. Experiences (Show some of the most important projects that had been made to guarantee the successfull of the Plan of Action. Examples EL DORADO INTERNATIONAL AIRPORT, ORION ….) 5. Conclusions

2. Background The Present Situation REGULATION REQUIREMENTS REGULATION REQUIREMENTS CUSTOMER INFRASTRUCTURE km Distribution network 898 Circuits customers INFRASTRUCTURE km Distribution network 898 Circuits customers 85 % overhead 15% Underground 34.5 kV - 9% Network 13.2 kV - 14% Network 11.4 kV - 77% Network Currents Laws and Resolutions: Quality, Reliability and Security CREG Resolution Reliability and Quality Service Timely attention to their needs Our Distribution System in front of the development of Colombia

02 2. Background Major Developments Connetion to NTS SE HV/MV North Guaymaral Florida Terminal Compartir Polígono USME Nelson Alonso Located in Tocancipá Located between Tocancipá and Sesquilé Nva. Esperanza Major areas of development Average rate of growth : 3,48%

3. Plan of Action Infrastructure Progress INFRASTRUCTURE REGULATION REGULATION CUSTOMER IN Recloser IN/OUT Recloser Switches New platform of communications IN/OUT Recloser Switches New platform of communications CREG043 Resolution CREG043 Resolution STRENGTHENING THE POWER SYSTEM AND GROWTH DISTRIBUTION SYSTEM Automation Manoeuver Devices Law 143/94, CREG 025/95: Quality Security and Reliabity, Res. MME y Res. CREG 097/08 Remote Control Devices Remote controlled Circuits Logic Operation and Automation Our Distribution System in front of the development of Colombia

3. Plan of Action Infrastructure Progress INFRASTRUCTURE REGULATION REGULATION CUSTOMER IN Recloser IN/OUT Recloser Switches New platform of communications IN/OUT Recloser Switches New platform of communications CREG043 Resolution CREG043 Resolution Automation Manoeuver Devices Remote Control Devices Remote controlled Circuits Logic Operation and Automation STRENGTHENING THE POWER SYSTEM AND GROWTH DISTRIBUTION SYSTEM Law 143/94, CREG 025/95: Quality Security and Reliabity, Res. MME y Res. CREG 097/08 Our Distribution System in front of the development of Colombia

I I R R I I R R Circuit 1 Circuit 2 SWITCH – LINK TO OPERATE WITH- OUT LOAD Infrastructure Progress Outline with Remote Control Devices I Overhead Underground 2 Hours –The Average Time for Detection and Isolation Fault Fault in 1 Open the main breaker of the substation. The recloser and the switches must be opened manually 1 1 Our Distribution System in front of the development of Colombia

3. Plan of Action Infrastructure Progress INFRASTRUCTURE REGULATION REGULATION CUSTOMER IN Recloser IN/OUT Recloser Switches New platform of communications IN/OUT Recloser Switches New platform of communications CREG043 Resolution CREG043 Resolution Automation Manoeuver Devices Remote Control Devices Logic Operation and Automatión Remote controlled Circuits STRENGTHENING THE POWER SYSTEM AND GROWTH DISTRIBUTION SYSTEM Law 143/94, CREG 025/95: Quality Security and Reliabity, Res. MME y Res. CREG 097/08 Our Distribution System in front of the development of Colombia

Infrastructure Progress overhead R R R R I R R RECLOSER OR SWITCH THAT SUPPLY OR A LINK BETWEEN TWO CIRCUITS R R CASE 1: CIRCUITS WITH EXIST RC´S R R SCADA/SAC Server VPN Net Operator GPRS Link GPRS in IEC 104 RTU SE 2 RTU SE 1 SCADA/SAC Front End IEC 104 Outline with Remote Control Circuits Our Distribution System in front of the development of Colombia Fault in 1 Open the main breaker of the substation and then open the recloser 1 near of the place where the fault occured. Also the center control operator send the signal to close the Recloser that link two circuits Telecontrol plus Activate Automation

Infrastructure Progress I OUTLINE OF 1.5 Ring Main Unit (RMU) with fault indicator and remote control Ring Main Unit with remote control that link two circuits Fault in 2 Open the main breaker of the substation and then the switch with fault indicator sense the fault and send a signal to center control to given the order to open switch 2 and 3. these operation is done by a center control operator. 2 1 Fault in 1 Open the main breaker of the substation and then open the switch 1 in the RMU near of the place where the fault occured. Also the center control operator send the signal to close the RMU that link two circuits X< 5 minutes -The Average Time for Detection and Isolation Fault (control center operator) 30% Improve Quality Services – Less Affected customers Outline with Remote Control Circuits Our Distribution System in front of the development of Colombia Switch 1Switch 2Switch 3 Underground

3. Plan of Action Infrastructure Progress INFRASTRUCTURE REGULATION REGULATION CUSTOMER IN Recloser IN/OUT Recloser Switches New platform of communications IN/OUT Recloser Switches New platform of communications CREG043 Resolution CREG043 Resolution Automation Manoeuver Devices Remote Control Devices Logic Operation and Automation Remote controlled Circuits STRENGTHENING THE POWER SYSTEM AND GROWTH DISTRIBUTION SYSTEM Law 143/94, CREG 025/95: Quality Security and Reliabity, Res. MME y Res. CREG 097/08 Our Distribution System in front of the development of Colombia

R R R R I R DISTRIBUTION AUTOMATION SYSTEM (SAD) R R SCADA/SAC IEC 104 Telecontrol Plus Automation Activation RTU SE 2 RTU SE 1 Fault in 1 Send message to the SCADA system 300A 200A 100A 200A 100A pre fault Conditions, analysis and does the math for supply capacity Send the order to isolate and re-establishment the area without fault. R R R R R R Adjustment Group Of protection Note: Automation Algorism begins after the cicle reclose on the main breaker and the recloser VPN Network Server GPRS Operator Infrastructure Progress Automation outline overhead Our Distribution System in front of the development of Colombia

I OUTLINE OF 1.5 Ring Main Unit (RMU) with fault indicator and remote control Ring Main Unit with remote control that link two circuits 2 1 Fault in 1 Open the main breaker of the substation and the Distribution Automation System send the signal to open the switch in the RMU near of the place where the fault occured. Also the SAD send the signal to close the RMU that link two circuits Underground Outline with Remote Control Circuits Infrastructure Progress X < 1 Minute - The Average Time for Detection and Isolation Fault DISTRIBUTION AUTOMATION SYSTEM (SAD) Our Distribution System in front of the development of Colombia Fault in 2 Open the main breaker of the substation and then the switch with fault indicator sense the fault and send a signal to center control to given the orden to open switch 2 and 3. these operation is done by the Distribution Automation System. 60% Improve Quality Services –less Affected customers Underground

4. Experience Pilot Projects ORION Enlargement and Remodeling of the El Dorado International Airport Ciudad Verde Our Distribution System in front of the development of Colombia

4. Experience Pilot Projects ORION Outline close ring 34,5 kV fed by two high voltage substations (MUÑA & SAUCES) Our Distribution System in front of the development of Colombia

4. Experience Pilot Projects Enlargement and Remodeling of the El Dorado International Airport Outline close ring 34,5 kV fed by two substations (FLORIDA & FONTIBÓN) Our Distribution System in front of the development of Colombia

4. Experience Pilot Projects 11 Ciudad Verde Outline open ring 11,4 kV fed by two substations SAN MATEO & COMPARTIR. Using RMU and fault indicator with remote control. Our Distribution System in front of the development of Colombia

5. Conclusions 1.CODENSA has been working to cover the energy demand growth of the CITY- REGION. 2.CODENSA turns its system of distribution in to an SMART SYSTEM (dynamic and timely). 3.CODENSA place the Distribution System to the service of a SMART COMUNITY that focuses on the development of the region and the COUNTRY. 1.CODENSA has been working to cover the energy demand growth of the CITY- REGION. 2.CODENSA turns its system of distribution in to an SMART SYSTEM (dynamic and timely). 3.CODENSA place the Distribution System to the service of a SMART COMUNITY that focuses on the development of the region and the COUNTRY. Our Distribution System in front of the development of Colombia

13