Realizing Green ICT Dream with TTA WiMAX Forum and 802.16 Status - For information - LIM, Euntaek CJK IMT 28 Xi’an (西安), China June.

Slides:



Advertisements
Similar presentations
1 IEEE m-09/ Work Plan for IEEE m Standard & IMT-Advanced Submission.
Advertisements

Doc.: IEEE /0778r0 Report June 2014 Dorothy Stanley (Aruba Networks) Slide 1 P802.11REVmc Status and Overview Date: Authors:
1 IEEE m-07/001r Work Plan for IEEE m Standard & IMT-Advanced Submission.
1 IEEE m-09/0019r Work Plan for IEEE m Standard & IMT-Advanced Submission.
IEEE/EMB/11073 Status Report for Combined Working Group Meeting, Vancouver, 14 May 2012 Kathryn M. Bennett, Program Manager, Technical Programs Development.
Proposal for IMT-Advanced Development Work Plan for m Document Number: IEEE C /030 Date Submitted: Source: Jose Puthenkulam
1 Session # n GRIDMAN TG Closing Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE n-11/0029 Date Submitted:
Session # Maintenance Task Group Closing Plenary Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE maint-11/0015r1.
xxx July, 2007Peretz Feder IEEE MEDIA INDEPENDENT HANDOVER DCN: xxx Title: Liaison Report – Work Related to.
Doc.: IEEE /169r0 Submission December 1999 Ian Gifford, M/A-COM & Tom Siep, TISlide 1 IEEE P Working Group for Wireless Personal Area Networks.
Session # TGn Opening Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE n-11/0019 Date Submitted:
Doc.: IEEE Submission November 2004 Robert F. HeileSlide rd Session of meetings of the IEEE Working Group for Wireless.
Doc.: IEEE / Submission March 2004 Larry Taylor (Staccato)Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /177r0 Submission January 2000 Ian Gifford, M/A-COM, Inc.Slide 1 IEEE P Working Group for Wireless Personal Area Networks TG1.
Proposal for TGm SDD Call for Proposal Topics Schedule Document Number: IEEE C802.16m-08/256 Date Submitted: Source: Jose Puthenkulam
Doc.: IEEE /1394r0 Submission November 2008 Jose Puthenkulam (Intel)Slide 1 Summary of m Development Process Date: Authors:
Doc.: IEEE /0775r0 Submission July 2009 Bruce Kraemer, MarvellSlide 1 TGn Closing Report - July 16 ‘09 Date: 2009-July-09 Authors: 5488 Marvell.
Doc.: IEEE /1130r3 Submission November 2009 Dorothy Stanley, Aruba NetworksSlide 1 IEEE TGv November Agenda Date: Authors:
1 Session # n GRIDMAN TG Closing Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE n-11/0020 Date Submitted:
Project Planning Committee (PPC): Session #68 Closing Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE ppc-10/0010.
November, 2010Peretz Feder IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: Liaison Report – Work Date Submitted:
Submission January 2016 doc.: Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [ e Closing.
Doc.: IEEE /073r0 Submission March 2003 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
TGm Work Plan Adhoc Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-09/0747r1 Date Submitted: Source:
TGm Work Plan Adhoc Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-09/1181 Date Submitted: Source:
Submission May 2016 doc.: Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [ e Status Report.
Doc.: IEEE /0031r1 Submission January 2010 Dorothy Stanley, Aruba NetworksSlide 1 IEEE TGv January 2010 Agenda Date: Authors:
Updates Required for the m Work Plan IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-09/0741 Date Submitted:
Suggestion to update Work Plan for IEEE m Standard
IEEE TGv March 2010 Agenda Date: Authors: March 2010
IEEE TGa Project Timeline
IEEE Working Group for Wireless Personal Area Networks™
Work Plan for IEEE m Standard & IMT-Advanced Submission
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
Submission Title: ULP TG Closing Report Beijing, China
<month year> <Sept 2018>
TGn Overview Portland, Oregon, US July 2004
July 2014 doc.: IEEE /25/2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
IEEE MEDIA INDEPENDENT HANDOVER
Liaison Report Date: Author: Jan 2008 Month Year
Submission Title: [TGn Liaison Report] Date Submitted: [20Jan2006]
Submission Title: ULP TG Closing Report Los Angeles, CA
July 2014 doc.: IEEE /17/2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: f Task Group Closing Report for San Francisco,
Session # Maintenance Task Group Closing Plenary Report
<month year> doc.: IEEE < e> <November 2018>
P802.16q Closing Report for Session #89
Submission Title: [Proposed project timeline]
Session # GRIDMAN Opening Report
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
IEEE IMT-Advanced Review Process
<month year> doc.: IEEE < e> <July 2018>
IEEE SGa Project Timeline
GRIDMAN Task Group Opening Presentation Session #81
IEEE P Wireless RANs Date:
IEEE TGmc Mar 2013 Agenda Date: Authors: March 2013
September 2009 Closing Report
Timeline for the Light Communications TG
November 2010 Closing Report
TGn Overview Portland, Oregon, US July 2004
July 2014 doc.: IEEE /29/2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
TGn Closing Report – September 24 ‘09
doc.: IEEE /xxxr0 Mika Kasslin liaison to
P802.16q Closing Report for Session #89
PAR Extension Motions Date: Authors: July 2016 Name Company
March 2005 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IEEE b timeline] Date Submitted:
TGbd Closing Report – Vietnam
Presentation transcript:

Realizing Green ICT Dream with TTA WiMAX Forum and Status - For information - LIM, Euntaek CJK IMT 28 Xi’an (西安), China June 2 ~ 3, 2011 CJK-IMT28-xxx_TTA

2 2/7 CJK IMT 28, Xi’an, China WiMAX Overall Timeline Q1Q2Q3Q Q1Q2Q3Q Q1Q2Q3Q Q1Q2Q3Q4 Letter Ballot Sponsor Ballot Rel2.0 System Profile PICS RCT/PCT/IOT OR1b Profile Dev. OR1c Profile Dev. TE Val. IEEE802.16m WiMAX Rel2.0 WiMAX Rel1.0/16e Enhancement 16m Spec. Completion Rel2.0 Profile Completion Rel2.0 Certification (TBD) OR1b Certification OR1c Profile Completion PICS: Protocol Implementation Conformance Statements Pro forma RCT: Radio Compliance Test / PCT: Protocol Compliance Test / IOT: Inter-Operability Test Procedure OR: Open Retail TE: Test Equipment

3 3/7 CJK IMT 28, Xi’an, China WiMAX Status  Release 2.0  TWG Rel2.0 System Profile released: March, 2011  Under development of Rel2.0 PICS document: March ~ July, 2011  To develop Certification Test Procedures (RCT/PCT/IOT/RRT): July, 2011 ~  Release 1.0 / 16e Enhancement OR1b Profile  OR1b Profile Development completed: December, 2010  Completion of OR1b TE Validation / Start of OR1b Certification: 2Q, 2011  Key Features: UL Coverage Enhancement, Load Balancing, Enhanced HARQ Categories OR1c Profile  OR1c Candidate Feature Discussion (ad-hoc): ~ May, 2011  OR1c Feature Selection: July ~ December, 2011  Ad-hoc Recommended Features: PHY: UL 64QAM, UL 2Tx MIMO-STC, BS 4Tx DL BeamForming, Static FFR MAC: Mandatory HO Request (Load Balancing), Sleep 3

4 4/7 CJK IMT 28, Xi’an, China IEEE p: M2M Current status –Amendment draft updates based on technical discussion Amendment on IEEE (i.e., 16e based) Amendment on IEEE m-2011 (i.e., 16m based) –Project timeline (see next slide) Main features –Low power consumption in device Enhanced power saving methods –Very large number of devices Access control mechanisms Group communication –Very small burst transmission Small size burst –Security Secured group communication Usage scenarios –Smart meter –Health care –Fleet management –Vending machine –Application on consumer device 4

5 5/7 CJK IMT 28, Xi’an, China IEEE p project timeline (expected) IEEE p p Amendment System Requirements Jan ‘11 Letter Ballot Sponsor Ballot Jan ’12 Nov ’10 Q3Q3Q4Q4Q1Q1Q2Q2Q3Q Q4Q4Q1Q1Q2Q2Q3Q3 JulAug Sep OctNov Dec JanFeb Mar AprMay Jun JulAug Sep OctNov Dec JanFeb Mar AprMay Jun Jul July ’12 Jul ’11 Working Doc Amendment Ready for Sponsor Ballot Amendment Ready for RevCom submission TG started Evaluation Methodology Sep ‘11 Aug Sep Sep ’12 Amendment Spec release 5

6 6/7 CJK IMT 28, Xi’an, China IEEE n: GRIDMAN Current status –Amendment draft updates based on technical discussion Amendment on IEEE (i.e., 16e based) Amendment on IEEE m-2011 (i.e., 16m based) –Project timeline (see next slide) Main features –High reliable data transmission –Multimode operation HR-BS acting as HR-RS HR-MS acting as HR-RS or HR-BS –Standalone network –Direct Communication between HR-MSs –Enhanced Multicast/Priority Access Service Usage scenarios –PPDR(Public Protection and Disater Relief) –SmartGrid 6

7 7/7 CJK IMT 28, Xi’an, China IEEE n project timeline (expected) 7

8 8/7 CJK IMT 28, Xi’an, China IEEE maintenance Current status –Two PARs: Partially approved by Nescom (NEw Standards COMmittee) PAR Revision: Approved PAR M: Not approved. To be resubmitted with new name(i.e. PAR ) to NesCom on Ju ne –Base document development For two PARS, two separate document will be prepared by editor group before July meeting Work expected before July meeting –Consensus Separate two database for two documents IEEE revision and IEEE M Keep checklists for separate two documents –Base document development Approval of PARs Editorial activity –Merge 16j, 16h, 16m and IEEE into one document –Split the merged document into IEEE revision and IEEE M Base documents ready for July meeting Conduct working group letter ballot following July session During working group ballots, submit comments marked by “ready for ballot” in database IEEE maint-09/0007rX but not already included as a result of the merge 8