Realizing Green ICT Dream with TTA WiMAX Forum and Status - For information - LIM, Euntaek CJK IMT 28 Xi’an (西安), China June 2 ~ 3, 2011 CJK-IMT28-xxx_TTA
2 2/7 CJK IMT 28, Xi’an, China WiMAX Overall Timeline Q1Q2Q3Q Q1Q2Q3Q Q1Q2Q3Q Q1Q2Q3Q4 Letter Ballot Sponsor Ballot Rel2.0 System Profile PICS RCT/PCT/IOT OR1b Profile Dev. OR1c Profile Dev. TE Val. IEEE802.16m WiMAX Rel2.0 WiMAX Rel1.0/16e Enhancement 16m Spec. Completion Rel2.0 Profile Completion Rel2.0 Certification (TBD) OR1b Certification OR1c Profile Completion PICS: Protocol Implementation Conformance Statements Pro forma RCT: Radio Compliance Test / PCT: Protocol Compliance Test / IOT: Inter-Operability Test Procedure OR: Open Retail TE: Test Equipment
3 3/7 CJK IMT 28, Xi’an, China WiMAX Status Release 2.0 TWG Rel2.0 System Profile released: March, 2011 Under development of Rel2.0 PICS document: March ~ July, 2011 To develop Certification Test Procedures (RCT/PCT/IOT/RRT): July, 2011 ~ Release 1.0 / 16e Enhancement OR1b Profile OR1b Profile Development completed: December, 2010 Completion of OR1b TE Validation / Start of OR1b Certification: 2Q, 2011 Key Features: UL Coverage Enhancement, Load Balancing, Enhanced HARQ Categories OR1c Profile OR1c Candidate Feature Discussion (ad-hoc): ~ May, 2011 OR1c Feature Selection: July ~ December, 2011 Ad-hoc Recommended Features: PHY: UL 64QAM, UL 2Tx MIMO-STC, BS 4Tx DL BeamForming, Static FFR MAC: Mandatory HO Request (Load Balancing), Sleep 3
4 4/7 CJK IMT 28, Xi’an, China IEEE p: M2M Current status –Amendment draft updates based on technical discussion Amendment on IEEE (i.e., 16e based) Amendment on IEEE m-2011 (i.e., 16m based) –Project timeline (see next slide) Main features –Low power consumption in device Enhanced power saving methods –Very large number of devices Access control mechanisms Group communication –Very small burst transmission Small size burst –Security Secured group communication Usage scenarios –Smart meter –Health care –Fleet management –Vending machine –Application on consumer device 4
5 5/7 CJK IMT 28, Xi’an, China IEEE p project timeline (expected) IEEE p p Amendment System Requirements Jan ‘11 Letter Ballot Sponsor Ballot Jan ’12 Nov ’10 Q3Q3Q4Q4Q1Q1Q2Q2Q3Q Q4Q4Q1Q1Q2Q2Q3Q3 JulAug Sep OctNov Dec JanFeb Mar AprMay Jun JulAug Sep OctNov Dec JanFeb Mar AprMay Jun Jul July ’12 Jul ’11 Working Doc Amendment Ready for Sponsor Ballot Amendment Ready for RevCom submission TG started Evaluation Methodology Sep ‘11 Aug Sep Sep ’12 Amendment Spec release 5
6 6/7 CJK IMT 28, Xi’an, China IEEE n: GRIDMAN Current status –Amendment draft updates based on technical discussion Amendment on IEEE (i.e., 16e based) Amendment on IEEE m-2011 (i.e., 16m based) –Project timeline (see next slide) Main features –High reliable data transmission –Multimode operation HR-BS acting as HR-RS HR-MS acting as HR-RS or HR-BS –Standalone network –Direct Communication between HR-MSs –Enhanced Multicast/Priority Access Service Usage scenarios –PPDR(Public Protection and Disater Relief) –SmartGrid 6
7 7/7 CJK IMT 28, Xi’an, China IEEE n project timeline (expected) 7
8 8/7 CJK IMT 28, Xi’an, China IEEE maintenance Current status –Two PARs: Partially approved by Nescom (NEw Standards COMmittee) PAR Revision: Approved PAR M: Not approved. To be resubmitted with new name(i.e. PAR ) to NesCom on Ju ne –Base document development For two PARS, two separate document will be prepared by editor group before July meeting Work expected before July meeting –Consensus Separate two database for two documents IEEE revision and IEEE M Keep checklists for separate two documents –Base document development Approval of PARs Editorial activity –Merge 16j, 16h, 16m and IEEE into one document –Split the merged document into IEEE revision and IEEE M Base documents ready for July meeting Conduct working group letter ballot following July session During working group ballots, submit comments marked by “ready for ballot” in database IEEE maint-09/0007rX but not already included as a result of the merge 8