ORC 5519.05 R/W to be Monumented and Preserved ORC 5519.05 requires ODOT to promptly monument the right of way that is acquired. ODOT shall definitely.

Slides:



Advertisements
Similar presentations
Section 12 Under Construction. Your role as the owner What to expect at the preconstruction meeting Dos and Dont during construction How to handle change.
Advertisements

January 28, 2008 ODOT Central Office – Room 1C Post-Construction BMPs Update Meeting.
Disputes/Claims 2009 Overview Division of Construction Management.
2010 C&MS Summary Division of Construction Management.
New Prebid Policy and Procedure Division of Construction Management.
James J. Viau, Administrator Office of Real Estate
John R. Kasich, GovernorJerry Wray, Director Ohio Department of Transportation Work Zone Speed Zones Dave Holstein/Reynaldo.
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
Presented By:Kathy Yarmey Tony DiTolve Office of Contract Administration
TRAFFIC MANAGEMENT Tender and Construction Phase
1 Cadastre of real estates of the Czech Republic = collection of data about real estates (a list of real estates and their description, geometric and positional.
CERTIFICATE 4 IN BUILDING BCGBC4004A. 18 week course First 10 weeks in classroom Following 8 in computer room 1.30pm pm (with 15 min break) Assessments.
Section 4(f) and Section 6(f) Updates questions to:
1 Ethekwini Municipality: Small Medium and Micro Enterprise (SMME) Fair: September 2010 Business Opportunities Presentation: by MEC for KZN Human.
Public School Concurrency Plat Implementation Process Broward County Environmental Protection and Growth Management October
Farmlands Office Of Environmental Services Managing the Environmental and Project Development Process Presented by the Ohio Department of Transportation.
4/23/2015 P.E.S.A.W.(public employees safe at work) 1 Safety Webinar: Hazard Communication and “Your Right to Know” Sponsored by the Georgia Department.
Responsible Charge—the case of Ed Turner and the city of Idaho Falls.
Standards of Practice Route Surveys Title 46 Professional and Occupational Standards Part LXI. Professional Engineers and Land Surveyors 1.
FDOT R/W Guidelines Use of License Agreements
On-Call Signal Contract Options for Discussion March 13, 2015 Cape Cod Joint Transportation Committee.
Acquisition of partial interest EASEMENTS. Does USPAP require a definition of the rights being appraised? Std Rule 1-2(e) Identify the characteristics.
Geothermal Alliance of Illinois February 28-29, 2012 Dave Johnson, P.E. Illinois Department of Public Health.
QLF Contract Quality Clauses Working Group QUALITY LEADERSHIP FORUM CONTRACT QUALITY CLAUSES WORKING GROUP Ken Crane MSFC September 24, 2002.
Circular A-110 Everything You Didn’t Want to Know.
Work Plan Development Steve Robinson Highway Utility Engineer, INDOT June 11, 2015.
City Council Meeting January 18, Background  Staff receiving increasing number of inquiries regarding installation of wireless telecommunications.
Valuations and interim certificates. Purpose Value the works taking account of: – the physical work done on site; – any extra work ordered by the client;
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
Road Map to a Green Tag Paperwork=Time=Money. Questionnaire If you could change any one major thing inside the Fire Community Services process what would.
Old Policy – which no one ever seem to have heard of.
Bridge Building Timelines Presented by The Richland County Engineers Office Thomas E. Beck, PE, PS 77 North Mulberry Street Mansfield, Ohio Jan.
Work Plan Development Aschalew Aberra Highway Utility Engineer, INDOT November 20, 2013.
GENERAL INFORMATION FOR ODOT ENVIRONMENTAL SITE ASSESSMENT INVESTIGATIONS.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
The City’s role. In real-property law and surveying, monuments are visible marks or indications left on natural or other objects indicating the lines.
Task Force on NCEES Model Law for Surveying Jim Plasker Task Force Facilitator Report and Slides Available at
Applicable Documents and KRS Statutes  FHWA Utility Relocation and Accommodation Guidelines  KRS  23CFR  23CFR  23CFR
Office of Traffic, Safety and Technology Module 5 Work Zone Plan Sets Module 5 Work Zone Plan Sets Traffic Control Plan Development Course.
Highway Utility Engineer, INDOT
Task Force on NCEES Model Law for Surveying Jim Plasker Task Force Facilitator Report and Slides Available at
Understanding Fire Sprinkler Systems (c) Nothing in this Act shall be construed to prevent a fire sprinkler contractor licensed under the Fire Sprinkler.
Chapter 16 Site Preparation. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify tasks required.
Bell Work Engineering New Products Read pages of Chapter 19 in the Manufacturing book.
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
Planning Team Facility Owner Local CTA/Facility Users Parks and Recreation Facility Manager/Tennis Professionals Facility Maintenance Design Professionals.
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director Real Estate Overview Matt Kouskouris, Division.
C U S T O M E R D R I V E N. B U S I N E S S M I N D E D. Department of Licensing & Regulatory Affairs Bureau of Construction Codes Keith E. Lambert, P.S.,
Position Statement on Sealed Truss Placement Diagrams for the 2012 or 2015 International Building Code Overview.
Position Statement on Sealed Truss Placement Diagrams for the State of California (including Los Angeles) Overview.
North Carolina General Statute May 2009 Gary Thompson, PLS work
BIDDING AS A DBE SUBCONTRACTOR ON UTAH DEPARTMENT OF TRANSPORTATION HIGHWAY CONSTRUCTION PROJECTS.
Environmental Site Assessments Hazardous Materials/ Regulated Substances Categorical Exclusion Training Class.
Guidelines for Land Clearing Presented By: SLC Environmental Resources Department.
Civil Engineering Surveying Roy Frank. Basic Route Survey and Design 1.Concept for Route 2.Reconnaissance Study 1.Small scale mapping of region (1”-500’
0 Design Change Construction & Completion Management (Outline and related procedures) Hanul NPP Engineering Center.
Monterey County Grading and Erosion Control Requirements and Enforcement Methods 1.
Different Types of Licenses for Engineers. P.Eng. License be at least 18 years old; be of good character (must submit character references); meet PEO's.
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only 1 UNIT 6 Fields, Careers, Work Skills.
Position Statement on Sealed Truss Placement Diagrams for the 2012 or 2015 International Residential Code Overview.
Professional Engineering Practice
Officer Screening Ohio Region 3.
Common Surveys Used For Commercial Real Estate Transactions
Temporary Works Co-ordination
Elaborating The Committee Charter:
(With anticipated expenses over the $25,000 property deductible)
Preparing a Right of Way Clearance Certification Request
Architects Registration Council Seminar – 5/5/2018
BEYOND DAVEY TREE (DAVEY RESOURCE GROUP)
The Florida Water Environment Association, through association with the Water Environment Federation (WEF), is a Registered Provider with the Florida Department.
Presentation transcript:

ORC R/W to be Monumented and Preserved ORC requires ODOT to promptly monument the right of way that is acquired. ODOT shall definitely and accurately ascertain and monument the roads and highways on the state highway system. All monuments shall be preserved or reset in their exact location. Non performing the setting or resetting of monuments is a violation of the ORC Specification Training

Memorandum of Understanding of newly acquired highway R/W Was established between the Board of Registration for P.E.s and P.S.s and ODOT Monuments are to be set or reset based on the right of way plan information. These monuments may be reset by any Professional Surveyor licensed in the State of Ohio Specification Training

Construction and Materials Specifications Protection and Restoration of Property 2008 Specification Training

Inventory of Monuments Set Requires coordination and communication between project engineer and construction contractors surveyor. Construction contractor makes reasonable effort to verify all R/W monuments shown in R/W plans before earthmoving activities. Contractors submits signed and sealed report, prepared by a professional surveyor, identifying all monuments within the project limits. The Report is necessary to protect the contractor. NO Report the Contractor is responsible for protecting and resetting ALL monuments as per the R/W plan at their expense Specification Training

Protection and Restoration of Property Any permanent Right-of-Way Monuments or property monuments on or outside the Right-of-Way limits and not enclosed within a temporary easement for the project will be the Contractors responsibility to protect. Upon completion of the final grading replace any Right-of-Way Monuments destroyed during or by construction activities. A quantity for replacement of Right-of-Way Monuments expected to be destroyed that are within a temporary easement will be paid under Item 604.

Monument Setting During construction the Contractor will construct the Monument Assemblies and Reference Monuments per item 604. Reference the latest revision of the Standard Construction Drawing RM-1.1 All R/W Monuments, Monument Assemblies and Reference Monuments are to be set under the direct supervision of a Professional Surveyor licensed in the State of Ohio. Contractors surveyor is required to submit a signed and sealed report identifying any monuments set or reset Specification Training

Monument Assembly, Reference and Right of Way 2010 Specification Training Brett Shearer