1 23 CFR 635.105 Supervising agency (c) When a project is located on a street or highway over which the STD does not have legal jurisdiction, or when special.

Slides:



Advertisements
Similar presentations
Alabama Primary Health Care Association
Advertisements

1 Balloting/Handling Negative Votes September 22 nd and 24 th, 2009 ASTM Virtual Training Session Christine DeJong Joe Koury.
Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
RECORD KEEPING Cooperative Development of Operational
for Cabin Safety Inspectors
Quality Education Investment Act of 2006 (QEIA) 1 Quality Education Investment Act (QEIA) of 2006 County Superintendents Oversight and Technical Assistance.
The Managing Authority –Keystone of the Control System
European Union Cohesion Policy
1 CREATING AN ADMINISTRATIVE DRAW REQUEST (OCC) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with.
Threshold System Presented by Jan Stanley, State Title I Director Office of Assessment and Accountability Fall Title I Directors Conference October 23-25,
August 6, To Understand: Budget Requirements Budget Template Budget Approval Process, Notifications and Timeframe To walk through the completion.
Metro Muncipal Agreement Program
Stewardship Oversight Committee Project Delivery Design & Construction Performance Measures May 2012.
2 HOME DELIVERED MEALS Waiver Workshop Presented by: Regional and Local Services (RLS) Access and Intake /Area Agency on Aging (A&I/AAA) May 27-28, 2009.
MATERIALS ACCEPTANCE. LPA Construction chapter -2 paragraphs on -Materials Quality Control -Materials Finalization -andAppendix J -LPA materials acceptance.
Got Federal-aid? Then you must have all the required contract provisions.
Construction Contract Administration LPA/ODOT
LPA Projects LPA projects Alum Creek Bike Trail $3,200,000 Parsons/Livingston $14,500,000 Riversouth Phase $9,900,000 Lane Avenue $1,700,000 Arcadia.
1 Florida Gulf Coast University Small Business Development Center (SBDC) Procurement Technical Assistance Center (PTAC) Reading Solicitations.
How Much Do You Know? Consultants -- Test Your Knowledge! Civil Rights Requirements on Federal-Aid Transportation Agreements How Much Do You Know?
Site Safety Plans PFN ME 35B.
Shared Work Employer Representative Orientation 1.
Change Order Missouri Local Programs How to Complete a Change Order & Get it Approved.
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
State Agency Contracts Considerations for Performance Reviews
NIH RESEARCH CONTRACTS
Human Capital Investment Programme Disability Activation Project (DACT) WELCOME Support Workshop Thursday 7 th February
VENDED PROGRAMS SFSP FY 05. What is a Food Service Management Company? Any organization (including commercial for profit companies, schools, or private.
Requirements for Federal Aid Project Contracts Kenneth Spear, Contracts & Estimates Engineer.
Spring 2008, King Saud University Cash Flow Analysis Dr. Khalid Al-Gahtani 1 Payment schedule Materials Mobilization Monthly payments Final Payment Contract.
Winocular Handbook Department of Human Resources Initiate Personnel Requisition Form Budget Holder Approval Special Ed Position? Supervisor of Budget Review.
Documenting Competitive Negotiation Procurement Procedures WisDOT – Consultant Services Lisa Stern, P.E. QBS Documentation Requirements.
Checking & Corrective Action
Functional Areas & Positions
GEtServices Services Training For Suppliers Requests/Proposals.
Training Monday, February 04, Saturday, October 11, Welcome to the Accounts Payable Invoice Processing Course.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
PSSA Preparation.
Proper Management of Federal Grants – Support for Salaries and Wages or Time & Effort Reporting 1.
MnDOT Metro District State Aid Construction Thursday February 19 th, 2015.

District 4 Local Assistance
City of Eugene Certification Project Case Study. Why Did Eugene Get Certified? Can’t do fund exchange ODOT's Local Agency Program More project control.
Plans, Specifications and Estimate (PS&E) Kelli Sparkman Local Agency Liaison, Region 3 January 30, 2009.
Marcy Mealy Procurement Specialist CDBG Program
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Overview of the Federal Aid Process for Transportation Projects.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT August 21, 2014.
Mn/DOT AUDIT COUNTY HIGHWAY ACCOUNTANTS SINGLE AUDIT DISCUSSION.
Closing Out a Federal Aid Construction Project Missouri Local Programs How to Close-Out a Federal Aid Construction Project.
Kenneth D. Fenton P.S. Clark County Engineer’s Office.
Allen Hughes State Materials Office
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
STATEWIDE INITIATIVE TO BE CONSISTENT TO BE PREDICTABLE TO BE REPEATABLE.
Construction Contract Administration
Mock State Aid Project County Highway Accountant’s Conference 2015.
Genesee County Road Commission Fred Peivandi, P.E. County Highway Engineer MTPA July 15, 2011 TIP Project Administration.
ODOT’s Local Agency Certification Program Jill Pearson Certification Program Manager March 12, 2010.
IDM Chapter 104 Utility Coordination Gail Lee Utility and Railroad Engineer, INDOT June 10, 2015.
Trivia Certification Program Trivia Mark Foster ODOT Region 1 Liaison and Federal Aid Specialist March 12, 2010.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
LPA Program Federal-aid Issues for Local Agencies Mike Morrow – December 10, 2010.
OTC Pres: Bid & Award Phase 4 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Eryca McCartin, Office.
HOW TO DO BUSINESS WITH THE CITY OF ATLANTA Department of Procurement Presented by: Keith O. Brooks, CPPO.
Introduction to Procurement for Public Housing Authorities Getting Started: Basic Administrative Requirements Unit 1.
Construction Oversight
Understanding a Federal Audit
State Aid Construction
State Aid Construction
Presentation transcript:

1 23 CFR Supervising agency (c) When a project is located on a street or highway over which the STD does not have legal jurisdiction, or when special conditions warrant, the STD, while not relieved of overall project responsibility, may arrange for the local public agency having jurisdiction over such street or highway to perform the work with its own forces or by contract; provided the following…….. –Compliance with all applicable Federal and State requirements. –The local public agency is adequately staffed and suitably equipped to undertake and satisfactorily complete the work. –In those instances where a local public agency elects to use consultants for construction engineering services, the local public agency shall provide a full-time employee of the agency to be in responsible charge of the project. LOCALLY ADMINISTERED PROJECTS

2 Delegation of Activities, not Responsibilities 23 CFR Supervising agency…….. (a) The STD has responsibility for the construction of all Federal-aid projects, and is not relieved of such responsibility by authorizing performance of the work by a local public agency or other Federal agency. The STD shall be responsible for insuring that such projects receive adequate supervision and inspection to insure that projects are completed in conformance with approved plans and specifications. ODOT shall assume the responsibility and representation of FHWA. ODOT provides oversight for each activity to ensure conformance to plans and specifications and Federal requirements. LOCALLY ADMINISTERED PROJECTS

3 By written agreement with ODOT typical LPA activities include: Environmental studies Procurement of consultant services (ODOT oversight) Design Surveying Right of Way acquisition Work by railroads or utility companies Preparation of plans, specifications and estimates Preparation of bid proposal package Advertisement for letting Contracting (Bid Analysis, Award to lowest and Best) · Contract administration Inspection / Testing LOCALLY ADMINISTERED PROJECTS

4 Non-delegated activities: DBE Goals and Waivers (ODOT) Final Acceptance (ODOT) Sole Source and Proprietary Justification Approval (ODOT / FHWA) Labor Compliance Enforcement (ODOT) Rejection of Bids (ODOT) Project Cost Eligibility (ODOT / FHWA) Federal-aid Payments (ODOT) LOCALLY ADMINISTERED PROJECTS

5

6 National Review Best Practices Stewardship and Oversight Agreement for locally administered projects. Dedicated Staffing Oversight and Monitoring Program Qualification Program for Local Agencies Local Agency Guidance Manual LOCALLY ADMINISTERED PROJECTS

7 ODOT Identified Best Practices District LPA Training Construction Involvement with Participation Requirements Plan and Bid Document Review Gary QAR LOCALLY ADMINISTERED PROJECTS

8 Current Issues: DBE Monitoring Materials Management Participation Requirements Review for Local Agencies Prime Contractor Performance % District Communication & Resources LOCALLY ADMINISTERED PROJECTS

9 Current Efforts to Improve CM Meeting May 16th– Construction Contract Admin Chapter – LATP Manual NHI (FHWA) – Contract Administration Core Curriculum Local-let Invoicing – DBE & Prime Performance % Future DCE Meetings Materials Management Process - Appendix J LOCALLY ADMINISTERED PROJECTS

10

11 District-02 Construction Monitor Roles and Documentation Practices

12 Construction Monitor Responsibilities 1) Project Scope Meeting/Initial Project site visit 2) Pre- Bid Meeting 3) Pre-Construction Meeting 4) Online LPA Survey Reporting 5) Project Site Visits 6) Review and Approval of Invoice Reimbursements 7) Progress Meetings 8) Documentation Reviews 9) Initial Walkthrough Inspection 10) Final Inspection 11) Project Close Out and Final Documentation Review

13 1) Project Scope Meeting/Initial Project site visit The District -02 LPA Coordinator schedules and chairs this meeting usually held at the LPAs place of business, followed by a trip to the proposed project site. District attendees include representatives from Planning/Production, Real-estate, Environmental, and Construction. Provides an opportunity for the LPA and District to openly discuss all aspects of the project including administration requirements, eligibility, scheduling, and identification of potential issues.

14 ODOT B USINESS P LAN 1) Project Scope Meeting/Initial Project site visit

15 2) Pre- Bid Meeting Preliminary information sent to the LPAs Project Engineer by Pre-con packet, Agenda items, links to the LPA homepage, OMM, and LPA Manual of Procedures, etc. Similar to ODOT Administered projects: Give a short overview of ODOT expectations and requirements with an emphasis on inspection documentation and materials. Assist the LPA in answering administration questions, policies, and procedures specific to the contract. Record general project information on the Pre-Award Checklist. *Send out pre-con information to FHWA, Central Office and District 02 personnel.

16 ODOT BUSINESS PLAN

17

18

19 3) Pre-Construction Meeting Ensure all applicable agenda items are covered from Appendix A Gather LPA and Contractor submittals per the Precon Packet. Review LPA process and expectations of ODOT/FHWA oversight. Assist with policy and procedural items. Coordinate regular interval Progress meetings. Record information on Precon Form.

20

21 4) Online LPA Survey Reporting Required entry for all project site visits: Pre-cons Regular visits Progress meetings Documentation reviews Final Inspections.

22

23 5) Project Site Visits Monitor contract work and inspection practices. Discuss project issues, provide assistance and direction regarding materials, testing and contract administration. Identify deficiencies and opportunities for improvement. Review change order requests in the field and determine necessity. Provide CM Concurrence on Significant Change Orders

24

25 6) Review and Approval of Invoice Reimbursements Keep up to date with the project status. Monitor work in progress and work items completed. Compare Invoices with LPAs regular pay estimates. Review and approval of the Local Let Summary and Payable Invoices for: A) Construction Contract Work B) Construction Engineering and Inspection Work including Testing. Inquire and follow up on any discrepancies or unusual pay quantities. Watch for LPAs who simply pay Estimated Plan Qtys. (Verify)

26 7) Progress Meetings Progress meetings required every two weeks or monthly depending on complexity and track record of the project personnel. Follow applicable agenda items per Appendix B in the LPA Manual. Fill out Local Let Progress Report form.

27

28 8) Documentation Reviews Usually held after a scheduled progress meeting with the LPAs Inspector and or Engineer at the project field office. Review and audit of all documentation requirements: Refer to LPA Manual Appendix C and J Daily Diaries Reference item summaries Pay Quantities Materials, Testing, and support documentation Change Orders DBE, EEO, and PW requirements Claims, etc.

29 REFERENCE/PAY FILES Individual folder for each pay item of work Field Documentation Inspection Forms Seven identifiers Project Number, Item Number, Plan Reference Number, Work Description, Location, Date, Signature Plan quantity, field measurements, calculations, pay quantity Summarized final quantity Funding splits. (Also summarized on the L.L.S.P. Invoice) Non-performed items require documentation

30 MATERIALS ACCEPTANCE Systematic approach to managing materials ODOTs Office of Materials Management (OMM) Project Bill of Materials (PBOM) Appendix J OMM inspection of precast/pre-stressed concrete beams OMM inspection of structural steel Contractor/LPA should be familiar with Appendix J prior to bid ODOT District asphalt plant monitoring

31 MATERIALS ACCEPTANCE Any and all materials incorporated into the Work need documentation. Use C&MS Section 700 for documentation guidance Many Frequently used links from OMM website: Sampling and testing Manual, QPL, Certified Suppliers, Approved Lists, Approved Plants, Welders, Aggregates, etc. etc. Temporary materials are to be documented in this manner as well.

32

33 9) Initial Walkthrough Inspection Typically done when substantial work is complete. Coordinated By LPA with Contractor, Consultants and CM. Generate and record final punch list items. LPA distributes copies to all attendees. LPA specifies punch list completion deadline in writing to the Prime Contractor.

34 10) Final Inspection Finalization Per C&MS Ensure all contract requirements are complete including punch list items and LPA approval. Issuance of the ODOT Final Inspection report (Appendix U)

35 11) Project Close Out and Final Documentation Review Approval of Final Invoices for Const. and CE&I. LPA Final Report (Appendix P) Certification of Payroll Affidavits. Affidavit of DBE or EDGE subcontractor payments. ODOT Final Inspection Report (Appendix U) ODOTs LPA Project Evaluation Form. Final Package reviewed and sent by CM to the office of Local Programs, FHWA and District reps. Also posted on the O Drive: O:\Local Programs\LPA Final Program Reports