2015 Summer Shoulder-Peak Near-Term Assessment of Transmission System Performance ~ Board of Directors Meeting September 30, 2010 Presented by Jeff Mitchell.

Slides:



Advertisements
Similar presentations
Overview Seams Coordination Process. 2 Introduction Midwest ISO Non-profit organization that manages the reliable flow of electricity across much of the.
Advertisements

RES-E Impact on Transmission Grid and Power System Reserves
Big Stone II Study Update SPG Meeting October 19, 2006.
NTTG Economic Study and Biennial Study Update NTTG Economic Study and Biennial Study Update NTTG Study Cycle.
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
1 Dale Osborn Midwest ISO March 17, 2008 Detroit, Michigan Great Lake Regional Wind Institute Introduction to the Midwest ISO.
Transmission Transporting Energy by Wire Matthew Stoltz Basin Electric Power Cooperative 1 1.
System Voltage Planning Brian Moss PD / Transmission Planning Transmission Planning Overview October 30, 2007.
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
1 Dale Osborn Midwest ISO February 27, Wisconsin Renewable Energy Summit Transmission Expansion Opportunities with Wind Energy.
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems Prof. Hao Zhu Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
Valley Import Overview Jeff Billo Regional Planning Group Meeting July 22, 2014 Preliminary1.
California Energy Commission Workshop Nuclear Power Plant Issues
2001 South First Street Champaign, Illinois (217) Davis Power Consultants Strategic Location of Renewable Generation Based on Grid Reliability.
1 Voltage Stability and Reactive Power Planning Entergy Transmission Planning Summit New Orleans, LA July 8, 2004 Entergy Transmission Planning Summit.
SPP.org 1. 2 Aggregate Transmission Service Study (ATSS)
FRCC Seasonal Transmission Assessment & Operational Seasonal Study Winter 2012.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
NW Transmission System Bottlenecks and Impacts of 2005 Summer Operation BPA Transmission Business Line Mike Viles January 2006.
PJM©2012 Offshore Wind Integration Studies at PJM September 13, 2012 Steven Herling Vice President, Planning PJM Interconnection.
NERC Congestion Management Congestion Management Option 3 Vendor Meeting Julie Pierce – NERC IDCWG Chair.
Need for Transmission Investment 2010 Mid-American Regulatory Conference AEP.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
Small Generation Interconnection Standards - IOU Dennis Reed Westar Energy Topeka, KS September 26, 2007.
April 16, 2010 RPG Meeting ERCOT Five-Year Transmission Plan Update Jeff Billo.
1 The Costs of Participating in Restructured Wholesale Markets American Public Power Association February 5, 2007 William M. Bateman Robert C. Smith.
John Dumas Director of Wholesale Market Operations Jeff Billo Manager of Mid Term Planning Dan Jones Director with Potomac Economics, the ERCOT IMM Board.
Page 1© 2009 Quanta Technology LLCPage 1 November 2007 BGE January 4, 2008 Strategic Midwest Area Renewable Transmission (SMART) Study October 06, 2009.
SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,
SM April Peak Week Operations Review Presentation to ISO Business Issues Committee May 22, 2002.
MISO Northwest Exploratory Study Presented to National Wind Coordinating Committee Participants in study – MISO, Various utilities in Minnesota, North.
EE590 Capacity Planning David Duebner, Expansion Planning October 8, 2008.
RELIABILITYFIRST CORPORATION Long Term Resource Assessment 2010 – 2019 Board of Directors Meeting September 30, 2010 Presented by Jeff Mitchell.
Local Area Study Local Area Study Mitigation Plan Update and Uncertainty Scenarios
Review of SONI Power System Operations Alex Baird Grid Operations Manager Real Time.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
© ABB Group August 23,2010 | Slide 1 MBPC Study – 1 st Load Pocket Preliminary Results for Discussion only Entergy Regional State Committee (ERSC) Southwest.
Big Stone II – Delivery Study Phase 6 and Supplemental #2 For Northern MAPP SPG Meeting 4/3/07 Elk River Richard Dahl Missouri River Energy Services.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
ISO New England State of the Markets Report May April 2002 Robert Ethier, Ph.D. Manager, Market Monitoring and Mitigation ISO New England June 26,
1 TAG Meeting May 9, 2008 NCEMC Office Raleigh, NC.
ERCOT CSC – Vote “Yes” to 3b Jan A. Bagnall Sr. Director Transmission, Reliability & Compliance October 2008.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
Transmission Voltage Management Ross Owen Oncor Electric Delivery.
© 2000 PACIFICORP | PAGE 1 –Main Transmission Sources  kV Transformers. Terminal, Mid Valley, 90 th South and Oquirrh –Generation: Gadsby (~350.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
Coordinated Planning Concept (For Discussion Only) revised 11/30/04 07/01/04.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
A new Nomogram Development POM- based tool - Application results in the Idaho Power System. Orlando Ciniglio, IPC Marianna Vaiman, V&R Energy WECC TSS.
THE POWER OF POSSIBILITY AESO current limits for Alberta-BC transfers Jeff Palermo – KEMA/AESO.
SERC Reliability Corporation 1 SERC RELIABILITY CORPORATION MID-AMERICA RELIABILITY CONFERENCE June 21, 2006 COLUMBUS, OHIO.
Consumer Cost Effectiveness of Carbon Mitigation Policies in Restructured Electricity Market Jared Moore and Jay Apt (adviser) CMU Engineering and Public.
ISO Confidential Overview of California’s Current Drought and its Effects on the Energy System Dede Subakti, P. E. Director, Operations Engineering Services.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
RA workshop presentation Karl Meeusen, Ph.D. Senior Advisor – Infrastructure Policy CPUC Resource Adequacy Workshop February 18, 2016.
October 15, 2012 PV & Storage Workshop ERCOT’s Interconnection Process John Adams Principal Engineer.
ERCOT – LP&L Study Status Update For Regional Planning Group Ben Richardson March 22, 2016.
Wind Management at MISO
PJM & Midwest ISO Market-to-Market Coordination (APEx Conference 2007)
Michael I. Henderson ISO New England Inc.
DEC System Voltage Planning - June 2018
Appendix: 2017 RTEP Report Key Graphics and Information
Local Area Planning Update to TRANSAC – September 26, 2018
TVA RC 2017 Summer Outlook TVA RC July 27, 2017.
Agenda Provide a recap of primary northern route alternatives for the MPRP Describe basis for selected route N5 Overview of analyses performed Description.
Jim Mcintosh Director, Executive Operations Advisor California ISO
Big Stone II Study Update
Presentation transcript:

2015 Summer Shoulder-Peak Near-Term Assessment of Transmission System Performance ~ Board of Directors Meeting September 30, 2010 Presented by Jeff Mitchell

Sept. 30, 2010Board Meeting2 Near-Term Transmission Assessment Conclusion: The transmission system within the ReliabilityFirst footprint is planned to perform well over a wide range of operating conditions for the 2015 summer shoulder-peak conditions. Observation: Identified constraints are similar to those that are experienced in present day operations, either during shoulder operations, when particular generators are off-line; or particular pumped storage units are in pumping mode.

Near-Term Transmission Assessment Sept. 30, 2010Board Meeting Summer Shoulder-Peak Assumptions: Wind generation modeled at 90% of nameplate, which is slightly above the upper limit of observed actual wind generation output Pumped storage modeled in pumping mode System load level modeled at 55-65% of summer peak

Near-Term Transmission Assessment Sept. 30, 2010Board Meeting4 Location of Wind Generators Study AreaGeneration (MW) PJM East481 PJM South0 PJM West1351 PJM_NI2181 WUMS1391 LAKES414 MISO South0 MRO7715 SERC225 Location of Modeled Wind Generators The majority of wind generation is in the west (MRO, PJM_NI, WUMS, PJM_W)

Sept. 30, 2010Board Meeting5 Near-Term Transmission Assessment Thermal analyses included: 1.Loading under system normal (NERC Category A) and first contingency (NERC Cat. B) conditions 2.Loading under system normal (NERC Category A) and first contingency (NERC Category B) conditions for changes in generation dispatch 3.Ability of the transmission system to support simulated non-simultaneous power transfers in many directions 4. Generation re-dispatch analysis 5. FCITC analysis of pass-through transfers 6. FCITC analysis of source transfers

Sept. 30, 2010Board Meeting6 Near-Term Transmission Assessment Each of these constraints can be mitigated to varying degrees with the re-dispatch of wind or fossil generation Identified Transmission Constraints

Sept. 30, 2010Board Meeting7 Near-Term Transmission Assessment No low voltages under the following conditions: - Base case - First contingencies - Increased transfers - Power-Voltage curves for transfers

Sept. 30, 2010Board Meeting8 Near-Term Transmission Assessment Transfer Scenario FCITC Without Redispatch (MW) Test Transfer (MW) Decreased Generation in Export Areas (MW) Increased Generation In Import Areas (MW) New FCITC (MW) Northwest to LAKES WUMS to RFC West Northwest to PJM West North to PJM NI MRO to RFC West Midwest ISO to PJM West Far West to PJM East MINN to RFC West MISO to PJM West to PJM NI IOWA to RFC West Northwest to PJM East SPP to RFC West Summary of Re-dispatch Analysis

Sept. 30, 2010Board Meeting9 Near-Term Transmission Assessment Suggestions for Improvement to Similar Future Studies of This Type: - Difficulty of converting a Summer model to Shoulder-peak conditions: - Interchange - Generator dispatch - Capacitors in-service & whether switched - Perform high voltage analyses

Sept. 30, 2010Board Meeting10 Near-Term Transmission Assessment Action Today Reliability Committee unanimously endorsed the report on its September 2 conference call. *** Request the Board of Directors approve this report for public distribution. *** Thank you!