1 Total Ownership Cost (TOC) and Cost as an Independent Variable (CAIV) Dr. Jeffrey Beach Naval Surface Warfare Center Carderock Division; Survivability,

Slides:



Advertisements
Similar presentations
Planning, Budgeting, Acquisition & Management of Capital Assets Capital programming is an integrated process within an agency for planning, budgeting,
Advertisements

Policies and Procedures for Proper Use of Non-DoD Contracts Revised April 19, 2005 Deidre A. Lee Director, Defense Procurement and Acquisition Policy Office.
© 2009 The MITRE Corporation. All rights Reserved. Evolutionary Strategies for the Development of a SOA-Enabled USMC Enterprise Mohamed Hussein, Ph.D.
Product Support Manager Conference Incentivizing Industry Panel Vice Chair, Logistics Division National Defense Industrial Association 15 January 2015.
A Navy Business Initiative Defense Daily OA Summit 12 November 2013 Nickolas H. Guertin, PE Director for Transformation DASN RDT&E
Ms. Nancy Dolan CNO N Human Systems Integration in DoD Acquisition.
2 Patricia Olsen Vice President, Contracts, Pricing & Estimating The Boeing Company – Integrated Defense Systems August 4, :00 PM Incentive Fee.
© 2013 PRICE Systems, LLC All Rights Reserved | Decades of Cost Management Excellence 1 Affordability Engineering for Better Alternative Selection and.
Department of the Navy AFCEA Small Business Brief Seán F. Crean, Director. Office of Small Business Programs 16 May 2013.
1 Achieving Total Systems Management (ATSM) Acquisition Strategies to Increase Reliability and Reduce Logistics Footprint PEO/SYSCOM Workshop November.
1 LBNL Enterprise Computing (EC) January 2003 LBNL Enterprise Computing.
DoD Systems and Software Engineering A Strategy for Enhanced Systems Engineering Kristen Baldwin Acting Director, Systems and Software Engineering Office.
Army Doctrine Publication (ADP) 3-37; and Army
The program work breakdown structure (WBS) establishes the essential
1 Navy Center for Earned Value Management (CEVM) January 2007.
Managing a Training Program Why train? Who will attend the training? What are the learning objectives? Strategies? Coverage? How will the training program.
Critical Role of ICT in Parliament Fulfill legislative, oversight, and representative responsibilities Achieve the goals of transparency, openness, accessibility,
Veterans in Business – Still Serving America Verification Assistance Program Part One Preparing for Verification.
Fall 2003 Auditing Update for Auditing and Assurance Services: An Integrated Approach.
Cost 101 for Life Cycle Logisticians R&D Cost: program costs primarily associated with the development of a new or improved capability to the point where.
“WHY AFFORDABILITY IS A SYSTEMS ENGINEERING METRIC” Quentin Redman Director – Solutions Architect PRICE Systems L.L.C.
1 Pipeline Measurement Process Review Committee Kickoff Session Paul Blackwell Office of the Deputy Assistant Secretary of Defense for Supply Chain Integration.
Certificate IV in Project Management Introduction to Project Management Course Number Qualification Code BSB41507.
1 Earned Value Management (EVM) Center ‘Moving Forward’ Presented by Mr. David Kester Director, Program Integration Division April 25, 2007.
DEPARTMENT OF THE NAVY THE NAVY ASN(RD&A) Acquisition and Business Management Recycled Paper SECTION 3.3 Acquisition Strategy Becomes more definitive as.
1 19 FEBRUARY 2013 MCSC OSBP PRESENTATION Procurement Achievement Reporting System Advisory Council Dave Dawson and Austin Johnson MARCORPSYSCOM Office.
1 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP.
Strategic Sourcing Thomas W. Essig Director, Program Analysis and Business Transformation DASN Acquisition Management April 25, 2006.
RIAAN VISSER GFIMFO Manager: Consulting Services SizweNtsalubaGobodo.
MEMORANDUM TO: The Defense Industrial Base FROM: Brett B. Lambert, Director, Industrial Policy July 13, 2010 “The Department is committed to working with.
RDA CHSENG, April 2009 DA HIEF YSTEMS NGINEER ASN (RDA) Chief Systems Engineer ASN (RDA) Chief Systems Engineer Naval Probability of Program Success (PoPS)
Department of Navy Logistics Community Update to Logistics FIPT 28 January 2004 DoN Log. Community = 25 Job Series & 11,458 people.
Stuart A. Hazlett Deputy Director, OUSD(AT&L) Defense Pricing Defense Procurement and Acquisition Policy A Presentation to NCMA Pentagon 8 September 2011.
2 William P. McNally Assistant Administrator for Procurement NASA Procurement Tenets August 4, 2008 NCMA Conference.
2.2 Acquisition Methodology. “Acquisition methodology” – the processes employed and the means used to solicit, request, or invite offers that will normally.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
1 Twelfth PEO/SYSCOM Commanders Conference The NAVSEA Perspective On Full Service Partnering Mr. John Goodhart Assistant Deputy Commander Fleet Logistics.
Army Contracting: One Community Serving Our Soldiers, Serving Our Nation U.S. Army Research, Development & Engineering Command Acquisition Center James.
Earned Value Management Presented By: Steve Krivokopich May , 2006.
CAPT Joe Spruill Office of Deputy Assistant Secretary of the Navy (Logistics) September 29, 2005 Managing Obsolescence within a Performance Based Logistics.
ASN(RDA) DASN M&B EVM 31 JAN – 1 FEB New in RDA –Assistant Secretary of the Navy (RDA) Dr. Delores M. Etter –RDA Chief of Staff John S. Thackhah.
Business, Cost Estimating, and Financial Management Presented by Ms. Sharon Jackson September 14, 2007.
Verification and Validation — An OSD Perspective — Fred Myers Deputy Director, Test Infrastructure Test Resource Management Center November 4, 2009.
Earned Value Management Update Nancy L. Spruill Director, Acquisition Resources and Analysis Office of the Under Secretary of Defense (Acquisition, Technology.
1 Discussion Brief on the Center for Earned Value Management (CEVM)
1 NASA Office of Procurement NASA Procurement Tenets April 15, 2008 SMC Brief Bill McNally Assistant Administrator for Procurement.
1 Department of the Navy Life Cycle Logistics Assimilation Update 4 November 2003 Jean Szutenbach Office of the Director,
Life Cycle Cost Savings by Improving Reliability Dr. Charles E. McQueary Director, Operational Test and Evaluation January 15, 2009.
| 1 Weapon System Acquisition Reform- Product Support Assessment DAU SYMPOSIUM 13 April 2010 Presented by: Basil Gray Where Innovation.
Appendix B of RMG 1-5 Project Tasks for Mid Term Exam Provide items listed below in briefing chart format. 1. Project introduction/background/orientation.
Small Business Programs Tatia Evelyn-Bellamy Director Small Business Division Small Business Center February 2016.
Power to the Edge A Net-Centric DoD NII/DoD CIO IT Acquisition Management Transformation Rapid Improvement Team (RIT) Principals Meeting November 18, 2003.
Ready. Resourceful. Responsive!. 2 Secretary of Defense Secretary of the Navy Naval Facilities Command (NAVFAC) Naval Air Systems Command (NAVAIR) Naval.
Torbay Council Partnerships Review August PricewaterhouseCoopers LLP Date Page 2 Torbay Council Partnerships Background The Audit Commission defines.
Environment, Safety, and Occupational Health Opportunities in DoD Business Transformation May 4, 2006.
BBP Mar 13 Better Buying Power 2.0 Achieve Affordable Programs Mandate affordability as a requirement Institute a system of investment planning to derive.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
Advanced Planning Brief to Industry (APBI) Philip Matkovsky Veterans Health Administration November 6, 2013.
Role Responsibilities
DoD Template for Application of TLCSM and PBL
SERVICES ACQUISITION REFORM ACT OF 2003 A STATUS REPORT
Life Cycle Logistics.
ENVIRONMENTAL, SAFETY, & HEALTH (ESH)
MDD to Milestone A Requirements Management Activities
Identify the Risk of Not Doing BA
Requirements and Acquisition Management
ENVIRONMENTAL SAFETY & HEALTH DEPARTMENT OF THE NAVY RESPONSIBILITIES
Commercial Item Group Overview.
MDD to Milestone A Requirements Management Activities
Blue Mountain Community College Non-Academic Program Review
Presentation transcript:

1 Total Ownership Cost (TOC) and Cost as an Independent Variable (CAIV) Dr. Jeffrey Beach Naval Surface Warfare Center Carderock Division; Survivability, Structures and Materials Directorate

2 2. Definitions: TOC Total Ownership Cost (TOC) – Total Ownership Cost includes all costs associated with the research, development, procurement, operation, logistical support and disposal of an individual weapon system including:  the total supporting infrastructure that plans, manages, and executes that weapon system program over its full life,  and the cost of requirements for common support items and systems that are incurred because of introduction of that weapon system, ….but excludes indirect, “non-linked” Navy infrastructure costs that are not affected by individual weapon systems’ development, introduction, deployment or operations. (Source: ASN(RDA) Total Ownership Cost Strategic Goal Management Board) TOC is a Noun

3 Definition: “Total Ownership Cost includes all costs associated with the research, development, procurement, operation, logistical support and disposal of an individual weapon system including the total supporting infrastructure that plans, manages and executes that weapon system program over its full life.” Total Ownership Cost (TOC) “Total Navy” Such as: System Training Site, Navy Resource Sponsor, SYSCOM, Contracts Office, etc. Such as: Cornet Player in Navy Band, # of Shore Based Hospitals, Etc. Such as: Development Cost, Procurement Cost, Operating and Support Cost, SYSCOM PM Staff, Etc. TOC is an Inclusive Concept of the Totality of Costs Associated with a Weapon System. And : But: “ The cost of requirements for common support items and systems that are incurred because of introduction of the weapon system.” “Excludes indirect “non-linked” Navy infrastructure costs that are not affected by individual Weapon systems’ development, introduction, deployment or operations.” TOC DIRECT COST + INDIRECT COST (Linked to Weapon Sys) INDIRECT COST (Not Linked to Weapon Sys) 2. Definitions: TOC

4 + common support items $ + common support systems $ 2. Definitions: TOC + infrastructure $ for planning, managing, operating, and executing + research $ + development $ + procurement $ + operation $ + logistical support $ + disposal $ + research $ + development $ + procurement $ + operation $ + logistical support $ + disposal $ Linked - Indirect Direct Cost Life Cycle Cost TOC TOC is More than LCC For the TOC Element Structure, see

5 Cost as an Independent Variable (CAIV) – CAIV is a strategy for acquiring and supporting defense systems that entails setting aggressive, realistic cost objectives (and thresholds) for both new acquisitions and fielded systems, and managing to those objectives. The cost objectives must balance mission needs with projected out-year resources, taking into account anticipated process improvements in both DoD and defense industries. This concept means that once the system performance and objective(s) are decided (on a basis of cost-performance trade-offs), the acquisition process will make cost more of a constraint, and less of a variable while obtaining the needed military performance. (Source: NAVSEA TOC / CAIV PAT) 2. Definitions: CAIV CAIV is a Management Strategy from which Affordable, Executable Programs can Emerge.

6 THE ASSISTANT SECRETARY OF THE NAVY MEMORANDUM FOR THE SECRETARY OF THE NAVY UNDER SECRETARY OF THE NAVY FROM: John W. Douglass, Assistant Secretary of the Navy (RD&A) SUBJECT:COST AS AN INDEPENDENT VARIABLE (CAIV) POLICY GUIDANCE – ACTION MEMORANDUM PURPOSE:The Department of the Navy’s CAIV policy guidance is submitted for Secretary of the Navy signature DISCUSSION: Change three to the DoD 5000 series (currently out for Service concurrence with a January 1998 deadline) places significant added requirements on the Program Manager to implement CAIV (i.e., CAIV- based objectives in the Acquisition Program baseline). There are widely varying definitions and understandings about what constitutes CAIV and what needs to be done to execute CAIV. This policy guidance was developed by an IPT comprised of representation from OPNAV, PEOs, SYSCOMs, PMs, and Marine Corps. Its purpose is to establish a singular and comprehensive statement on what constitutes CAIV in the Department of the Navy. The next step in the DoN CAIV implementation is to revise and restate our processes for what needs to be done to properly execute CAIV. These process changes are in development. Presently, there is a need to establish a consistent understanding within the Department on exactly what CAIV is and what it is not. This policy guidance serves that purpose…. 2. Definitions: CAIV Policy Guidance ASN (RDA) Weighs-In with Advice for Implementing CAIV.

7 2. Definitions: CAIV Policy Guidance CAIV is a Verb; It Has Seven Tenets. 1.CAIV is a DoN strategic management process. 2.CAIV is a top-down, bottom-up, continuous, and comprehensive process. 3.CAIV recognizes that limited resource availability drives TOC target. 4.CAIV employs a hierarchy of cost reduction activities, expanding the potential trade space. 5.CAIV recognizes that carefully structured contracting incentives can offer great leverage in achieving CAIV objectives. 6.CAIV requires risk management (due to aggressive, realistic cost objectives). 7.CAIV is a cradle to grave process.

8 2. Definitions: CAIV Policy Guidance 1.CAIV is a DoN strategic management process.  Establish mission area resource allocations for each sponsor community  Determine operational requirements to meet mission needs  Estimate TOC to satisfy requirements  Project long-range availability of resources, by appropriation, by priority  Assess cost, schedule, and performance relationships  Establish aggressive cost targets  Identify cost reduction opportunities and trade-offs to meet aggressive targets  Develop plans, metrics, and provisions for managing program execution 2.CAIV is a top-down, bottom-up, continuous, and comprehensive process.  Top-down – Effectiveness optimized within constraints of available and projected resources  Bottom-up – Government-industry IPTs empowered to recommend cost saving initiatives  Continuous – From affordability constraint determination, to AoA cost targets, and throughout development, production, operation and support, and disposal The Seven Constituent Tenets of CAIV; Pay Particular Attention to #1.

9 2. Definitions: CAIV Policy Guidance 3.CAIV recognizes that limited resource availability drives TOC target.  Management to the sum of resources required to execute a program within the projected affordability limit, by appropriation, by year 4.CAIV employs a hierarchy of cost reduction activities, expanding the potential trade space.  Improve processes and activities, eliminate non-value-added and deficient cost-to-benefit activities  Relax or remove requirements that do not contribute to the warfighter’s needs  Cost-performance trade-offs that reduce cost, but meet all operational requirements  Relax operational requirements’ threshold values 5.CAIV recognizes that carefully structured contracting incentives can offer great leverage in achieving CAIV objectives.  Award fee during design and development  Procurement price commitment curve for production  Profits above typical margins, if contract cost or schedule objectives are significantly improved The Seven Constituent Tenets of CAIV; Pay Particular Attention to #3 and #4.

10 2. Definitions: CAIV Policy Guidance The Seven Constituent Tenets of CAIV; Pay Particular Attention to #6. 6.CAIV requires risk management (due to aggressive, realistic cost objectives).  Careful risk analysis  Instituting and implementing a Risk Management Plan  Defining and measuring meaningful metrics  Establishing incentives 7.CAIV is a cradle to grave process.  Initiated during the requirements generation phase  Continuous throughout life cycle  Product and process improvement