DLS VERIFICATION TESTING FIELD TESTS TO CHECK DLS OPERATIONS.

Slides:



Advertisements
Similar presentations
SSPC PA-2 “Measurement of Dry Coating Thickness with magnetic Gages”
Advertisements

Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
Traffic Monitoring Guide Truck Weight Monitoring Section 5.
Section Cross Slope District 1 Your logo here.
Grade “A” Laboratory Evaluation Program Ronald G. Brown Dairy Product Specialist/Laboratory Evaluation Officer NYS Department of Agriculture and Markets.
PPAP Requirements Training
EQUIPMENT VALIDATION.
Mobileye Setup Wizard Version User manual
Engineer Training TN 59 Ink Management Solution TJ8300 / TJ8500 TN 59 Ink Management Solution Machine 75 and Above.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Selection of measuring instruments
Processing Integrity and Availability Controls
Mehnaaz Asad IB2-3. Data logging is the collection of data over a period of time, and is something often used in scientific experiments. Data logging.
Quality Assurance/Quality Control Policy
Classification of Instruments :
AccuMax Multi-Point Injection Mechanics
Unit 11: Calibrating Instruments
MoDOT’s Inventory Systems and Measures for Pavement Marking and Roadway Signing Jim Carney State Maintenance Engineer October 2004.
Acceptance Process for Manufactured Products by Certification: A users guide for implementation of Materials Bulletin No. MB 06-02, DCE Memorandum No.
Module 11: Use and Care of Equipment At the HIV Rapid Testing Site.
Water Supply.
Audit & Compliance Tips Jagan Mandavilli Senior Compliance Engineer.
Presented by: Mike Hamdan South Coast Air Quality Management District Diamond Bar, CA Presented at: The Tribal Air Monitoring Training, Pechanga Reservation,
ISAT 303-Lab3-1  Measurement of Condition: Lab #3 (2005):  List of parameters of condition: –Linear distance, angular displacement, vibration, displacement,
Packing and Shipping. COPYRIGHT ® 2012 OFFICE 1 SUPERSTORE Contents 1. Introduction 1. Introduction 2. Problems and.
Frank G. Jackson, Mayor Office of Equal Opportunity Monthly Report and Affidavit An Introduction.
OSHA Office of Training and Education 1 Hazard Communication.
Remarks will print on the completed form Generate Quantity Book Entry Generate Pay Quantity.
INTRODUCTION TO MEASUREMENT
Rich Quinley California Department of Transportation.
Receiving: The Process l Inspect delivery and check against P.O. »blind receiving »invoice receiving »electronic receiving l Check against the invoice.
PRESENTATION OF IRP BALLOTS 2008 IFTA / IRP Audit Workshop.
Mobile Audio/Video Recording Equipment Policy and Procedure Number PP
15 Water Supply. 2 Objectives Describe the sources of water for a municipal water supply system. Explain the purpose of a water treatment facility. Describe.
Karen Herter (HMG) Mike Langley (DGS) April 15, 2008 Portfolio Manager for California State Buildings Meeting the Requirements of Executive Order S
Imagine the result ARCADIS DOT Program 2011 Commercial Motor Vehicles Imagine the result.
Application – Identifying, Listing Equipment, and Documentation
1 IFTA / IRP 2010 Annual Audit Workshop Breakout Session # 1 – Part 3 Distance – It’s a Long, Long Road; Records ! What Records ? Distance – It’s a Long,
LEADS/EMS DATA VALIDATION IPS MeteoStar December 11, 2006 WHAT IS VALIDATION? From The Dictionary: 1a. To Make Legally Valid 1b. To Grant Official.
Getting The Most Out Of Release Detection Testing National Tanks Conference 2015 Phoenix, Arizona September 15,
Automotive Heating and Air Conditioning CHAPTER Automotive Heating and Air Conditioning, 7e James D. Halderman | Tom Birch SEVENTH EDITION Copyright ©
Sign Structures Updates: Helpful Tips for Inspectors
MET253 Measurements in Biomedical Instruments. MEASUREMENT  Defined as 1. The process of numerical evaluation of dimension. 2. The process of comparison.
Balances The balance is an instrument which measures the mass of a body or substance using the gravity force which acts on that body At present, there.
1 Chapter 01 Measurement And Error. 2 Summary Instrument – a device or mechanism used to determine the present value of a quantity Measurement – a process.
The Big Picture Things to think about What different ways are there to collect information automatically? What are the advantages and disadvantages of.
Automatic Data Capture  Process where many techniques are used to automatically collect data without need for manual entry. Manual entry has following.
National Highway Institute 5-1 REV-2, JAN 2006 EQUIPMENT FACTORS AFFECTING INERTIAL PROFILER MEASUREMENTS BLOCK 5.
Quantity Calculations Module 3. Quantity Calculations  Specifications  Post Bid Quantity Calculations  Production Quantity Calculations –Checking Yield.
Instrument Clusters Topics covered in this presentation:
Unit 11: Calibrating Instruments
Automotive Engines Theory and Servicing
INTERVET DISPATCH TRAINING T-1560
Measurements & Instrumentation – Module 3
Figure A Figure B 12/07/2006 Rev B
Data Logging & Control Systems
Acceptance Process for Manufactured Products by Certification:
Chapter 31 Battery Systems.
Determination of dart drop impact resistance for HDPE and LLDPE film grades SL -M 513 Presenter by: Asaf Orujov.
DHL Delivery Processes
C2.3 DEROGATION GUIDANCE C2 CALIBRATION
Auditing with GPS and on-board recording devices
INTERVET DISPATCH TRAINING T-1560
Data Tables and Arrays.
Basic Check Link Principles
Order procurement Input: customer need Sales: identifies customer need
Measurements & Error Analysis
Automotive Engines Theory and Servicing
Dash Warning Lights and Driver Information Systems
Fiber Reinforced Polymer Systems
Presentation transcript:

DLS VERIFICATION TESTING FIELD TESTS TO CHECK DLS OPERATIONS

DATA LOGGER SYSTEMS Data LOGGER SYSTEMS (DLS) ARE ELECTRONIC SYSTEMS USED TO: 1. MONITOR MATERIAL APPLICATION CONDITIONS i.e. ambient temperatures 2. PROVIDE REAL-TIME DATA OF ACTUAL APPLICATION PARAMETERS i.e. pounds of glass beads put down 3. ALLOWS STRIPERS TO MAINTAIN APPLICATION RATES

STRIPING TRUCK WITH DLS SYSTEM

ELECTRONIC CONTROL BOX

OHIO DOT DLS INFORMATION THE OHIO DOT DLS TECHNICAL GUIDE CAN BE FOUND AT: O:\TRAFFIC\Markings Summits\Markings Summit 2007\Markings Summit Districts THE OHIO DOT DLS TECHNICAL GUIDE CONTAINS INFORMATION THAT INCLUDES: 1. EXAMPLES OF DLS DATA REPORT FORMS 2. HOW DATA IS ENTERED INTO A DLS REPORT 3. HOW TO READ A DLS REPORT 4. DLS REPORT SECURITY

SENSORS SENSORS SUCH AS TEMPERATURE SENSORS, LOCATED AT APPROPRIATE LOCATIONS ON THE STRIPING TRUCK, PROVIDE TEMPERATURE DATA.

GAUGES GAUGES PROVIDE DATA AND HELP MONITOR THE TEMPERATURE OF STRIPING MATERIAL IN THE TANKS.

GLASS BEAD TANK LOAD CELLS GLASS BEAD TANKS ARE MOUNTED ON LOAD CELLS. LOAD CELLS ARE THE BASIS OF BEAD WEIGHT CALCULATIONS.

DLS ELECTRONIC DATA SHEET 1. DLS DATA IS AUTOMATICALLY RECORDED AND STORED ELECTRONICALLY 2. DLS DATA INCLUDES: *SENSOR DATA *DISTANCE DATA *AMBIENT CONDITIONS *MATERIAL QUANTITIES 3. VERIFICATION TEST RESULTS WILL BE COMPARED TO CONTRACTORS ELECTRONIC SHEET DATA

FIELD CHECKING A DLS SYSTEM Calibration Sticker Check 1. CHECK FOR THE PRESENCE OF: THE ANNUAL CALIBRATION STICKER

CALIBRATION STICKER EVIDENCE OF ANNUAL CALIBRATION SHALL BE A SIGNED AND AFFIXED TO THE INSIDE OF THE DRIVERS DOOR OF EACH STRIPING TRUCK.

YEARLY CALIBRATION 1. ACCORDING TO THE OHIO DOT CONSTRUCTION AND MATERIAL SPECIFICATION MANUAL, ITEM 641, SECTION , EACH DLS SHALL HAVE AN ANNUAL CALABRATION. 2. ITEMS TO BE CALIBRATED INCLUDE: -ALL MECHANICAL AND ELECTRICAL COMPONENTS -SOFTWARE -FUNCTION AND OUTPUT 3. CALIBRATION WILL BE CONFIRMED BY MANUFACTURER.

Field Checking a DLS System The Plate Test 1.Place an aluminum plate around 24 in. x 8 in. under the paint gun of the striping truck. Aluminum plates are supplied through the Office of Materials Management (OMM), Chemical Section. 2.Allow the striping truck to stripe over the plate in order to get a stripe of the desired thickness on the plate. 3.Send the striped plate to the OMM, Chemical Section for film thickness testing. 4.Send the contractors DLS average mils applied data as comparison for the film thickness testing results. Note: Be careful not to damage the paint stripe on the plate.

Field Checking a DLS System The Plate Test

Field Checking a DLS System The Bead Weight Test 1.Check and record the bead weight on the DLS electronic data sheet W1. 2. Obtain an object of known weight, minimum of twenty (20) pounds, i.e. a fifty pound bag of glass beads. 3. Place the weight on top of the bead tank. Keep the weight in position on top of the tank and check and record the new weight W2, on the DLS electronic data sheet. 4.Subtract W1 from W2 to get the known weight of the object used. W2 – W1 = weight of the object of known weight used. Correct test results confirms the proper operation of the bead tank load cells as well as the accuracy of the data on the spreadsheet.

Field Checking a DLS System The Bead Weight Test

Field Checking a DLS System The Infrared Thermometer Test 1.Use a hand-held Infrared Thermometer to measure road surface temperature, ambient temperature, and/or striping material temperature. 2.To operate the infrared thermometer, follow the manufacturers operating procedures. 3.Compare temperature readings to the data on the appropriate DLS electronic screen. 4.Temperature readings on the DLS screen should be within +/- 5% of the thermometer readings.

Field Checking a DLS System The Infrared Thermometer Test

Field Checking a DLS System The Humidity Test 1.Measure the ambient humidity with the use of a Sling Hydrometer. 2.To operate the sling hydrometer, follow the manufacturers operating procedures. 3.Compare humidity readings to the data on the appropriate DLS electronic screen. 4.Humidity readings on the DLS screen should be within +/- 5% of the hydrometer readings.

Field Checking a DLS System The Humidity Test

Field Checking a DLS System The Distance Traveled Test 1.Testing the Distance Traveled data on the DLS Electronic Data Screen can be done using a distance wheel like the one shown in the picture. 2.To operate the distance wheel, follow the manufacturers operating procedures. 3.Compare distance readings to the data on the appropriate DLS electronic screen. 4.Distance readings on the DLS screen should be within +/- 5% of the distance wheel readings. 5.DLS distance data can also be checked using mile markers and an odometer.

Field Checking a DLS System The Distance Traveled Test

SUMMARY THE SPECIFIED ANNUAL CALIBRATION OF DATA LOGGER SYSTEMS (DLS) IS THE PRIMARY CHECK OF THE OPERATION OF THE SYSTEMS. THE TESTS DESCRIBED IN THIS PRESENTATION ARE MEANT TO BE DONE IN A RANDOM FASHION TO: 1. VERIFY PROPER OPERATION AFTER CALIBRATION 2. DETERMINE IF THE SYSTEM IS THE CAUSE OF SUSPICIOUS DEVELOPMENTS IN THE FIELD APPLICATION OF STRIPING MATERIAL ONE OR ALL OF THE TESTS MAY BE USED TO CHECK DLS OPERATION THE DEVELOPMENT AND IMPLEMENTION OF THESE TESTS WILL BE DONE IN COOPERATION BETWEEN THE DISTRICTS AND THE OFFICE OF MATERIALS MANAGEMENT, CHEMICAL SECTION. CONTACT: MARIA KERESTLY/RANDY DAVIS