Bridge Design Manual Whats New?. Waters of the United States Placement of fill material below Ordinary High Water Mark (OHWM) requires 401/404 permit.

Slides:



Advertisements
Similar presentations
RETAINED SOIL WALL SYSTEM™
Advertisements

Agenda – Day 1 8:00 am – 8:15 am Introductions and House Keeping
LOAD RATING TRAINING Hand Calculations Tim Keller, PE Amjad Waheed, PE
January 28, 2008 ODOT Central Office – Room 1C Post-Construction BMPs Update Meeting.
ODOT Structure Project Management Seminar Bridge Preliminary Design Report.
ODOT Structure Project Manager Seminar Specifications
Project Development Process (PDP) Structures. PDP – Three Project Levels Major Project ~ 14 Steps Major Project ~ 14 Steps Minor Project ~ 10 Steps Minor.
Overview of New Practices & Policy Deck Issues. Topics Stakeholder Responsibilities Stakeholder Responsibilities Deflection Control Measures Deflection.
John R. Kasich, GovernorJerry Wray, Director Ohio Department of Transportation 2011 Conaway Conference Structures Update.
Potential Solutions Goals for Design – What are we concerned about? –Primary Goal: Get the deck on successfully Stability during deck pour Stability during.
ODOT Structure Project Manager Training
Session 12 STEPS 3 AND 4. Stage 2 Detail Design Submission should include an updated cost estimate and the following: (Not every item listed will apply.
RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E.
BRIDGE CONSTRUCTION INSPECTOR Practice Questions Next.
July Training Outline Part 1 Cost-per –SF and Detailed Estimate Pay Item Detailed Estimate Segments Bridge Level Data Segment Level Data Supports.
2013 Northcentral Region Construction Conference
3D Analysis with AASHTOWare Bridge Design and Rating
Concrete Box Culverts (CBC)
Bridge Engineering (6) Superstructure – Concrete Bridges
VOBUG Conference August 3 rd, 2010 Nashville, Tennessee Robert LeFevre, P.E. Adam Price, P.E. Tennessee Department of Transportation Structures Division.
2013 C&MS Section 500- Structures Changes from 2010 to 2013 Construction and Materials Specifications in Structures Items.
Art Nowak February 2013 STRUCTURE DESIGN MANUAL 1.
SHRP2 Project R04 Bridge Designs for ABC
Waterway Permits Update questions to:
3 June Rapid Replacement of the Hood Canal Bridge Approach Spans Joseph Merth, P.E. Bridge Design Engineer 3 June 2008.
MAJOR REVISIONS TO THE POLICY FOR ACCOMMODATING UTILITIES ON HIGHWAY RIGHTS Presented By: Mark Attaway March 29, 2011.
Reconstruction of the Eads Bridge Highway Deck
2015 Winter School Structures Heidi A. Mertz, P.E. District 8-0 Structure Control Engineer.
Preparation before placing concrete Chapter 3. Chapter Topics Subgrade preparation Compaction around buried pipes and excavations Establishing grades.
Region One Bridge Design – Robert Jose Tovar “If I have seen further it is by standing upon the shoulders of giants” – Isaac Newton.
Crane Bridge Design STJ Engineering Matt Albert AJ Chandler Noah Fehrenbacher Jake Gennicks Jake Wilhoit Rose-Hulman Institute of Technology.
I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.
EXAMPLE 9.2 – Part I PCI Bridge Design Manual
ODOT Policy for Deck/Slab Closure Pours Sean Meddles, P.E. Assistant Administrator ODOT Office of Structural Engineering.
EXAMPLE 9.3 – Part III PCI Bridge Design Manual
Office of Traffic, Safety and Technology Chapter 7 Signing Plan Sets Traffic Signs 101 November 20, 2014.
RM Product Update October 2009 Alexander Mabrich, PE, Msc Senior Engineering Consultant.
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
Office of Traffic, Safety and Technology Module 6 Specifications and Special Provisions Traffic Control Plan Development Course.
EXAMPLE 9.2 – Part II PCI Bridge Design Manual
Jason Martin February 2013 Design Section Engineer’s Manual 1.
October 8, 2008 Spokane, WA Doug Walters, P.E. King County DOT
LRFD Now! Andy Zickler VDOT Structure and Bridge Division Central Office April 10, 2006
Bridge Standards & Practices Bridge Design & Drafting Manual (BDDM) Bridge Drawings Upcoming Bridge Training.
Bridge Design to AS 5100 Sydney May 25th 2005 Using High Strength Concrete with AS 5100 opportunities and restrictions.
C. C. Fu, Ph.D., P.E. The BEST Center
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specification-Show how project.
1 Virtis/Opis Technical Update Virtis Opis BRIDGEWare Users Group Meeting 2010 Nashville, Tennessee.
Overview of New Practices & Policy Skewed Bridges.
GEOTECHNICAL ENGINEERING ECG 503 LECTURE NOTE 10 TOPIC : 3
Text Information Manual of Steel Construction - $95 Make check to AISC Notes for CE482 by Dr. Hans Gesund - $10 Cash or check to University of Kentucky.
Lunch. Estimates Ballpark Accountant Typical Stages Conceptual (Alternatives) Schematic 30% Plans 60% Plans % Plans.
Bridge Deck Overlay Projects 101 Presentation by Central Office Bridge Rehabilitation Group.
Steel Fabrication & Erection of Belle Chasse Primary School ET-493 Final Proposal Spring 2015 Instructor: Chris Koutsougeras Advisor: Edward Rode’ Derek.
P3 (Preventive Pile Protection)
Concrete Box Culverts (CBC)
TOTAL BRIDGE REPLACEMENT OF M-13 OVER CHEBOYGANING CREEK
High Bridge Re-Deck Project
Advisor: Professor M. Kevin Parfitt
Acceptance Process for Manufactured Products by Certification:
By T.G.N.C.VAMSI KRISHNA. 171FB M.tech – Civil.
1C2 Conceptual Design of Buildings
ABCD What’s New In Bridges
Chapter 7 Signing Plan Sets
Navigating FDOT Specifications and Standards
GEOTECHNICAL ENGINEERING ECG 503 LECTURE NOTE 10 TOPIC : 3
American Concrete Pipe Association Short Course
General Tab Project, Cost Schedule, and Work Limits Roadway Character
What’s new in Bridges ABCD March 2019
Presentation transcript:

Bridge Design Manual Whats New?

Waters of the United States Placement of fill material below Ordinary High Water Mark (OHWM) requires 401/404 permit Preliminary Site Plan: Plan area of fill footprint Volume of fill below OHWM BDM Fig. 208 & 209

Prestressed Beam Camber Plans shall include: release: (B-C) erection: (1.8B-1.85C) Long term Camber: (2.45B-2.40C)

Load Rating Entire Section 900 Revised to address: Buried vs. Non-buried Bridges Major, Minor & Minimal PDP Design-Build Value Engineering Change Proposals Rating requirements: PC-Bars for standard bridge types Minimum Design Loading

Multi-Span Prestressed Beams Two Loading Conditions: Simple-span for non- composite loads and continuous for live load and composite dead load HS-25 FWS Simple-span for all loading conditions HS-25 No FWS

MSE Walls Plan Preparation Traditional Method eliminated Three-Line Diagram Method Special Provisions New pay items Square Ft. vs. Lump Sum Undercut & Backfill Concrete Coping

2005 C&MS Web version available Hard copies available at Office of Contracts in May 2005 Use for all projects filed April 4, 2005 and later Use for all projects sold August 10, 2005 and later

2005 C&MS Item 512 – Treating Concrete Concrete Sealing (SS 864) HMWM (SS846) SRS (SS 841) Gravity-Fed Resin (PN 515) Epoxy Injection (PN 522)

2005 C&MS Item – Approval of Construction Plans One P.E. Stamp for plans with railroad involvement Two P.E. Stamps for: Sheeting & Bracing Demolition over traffic Falsework Plans Erection Plans Jacking & temp. support Construction stresses Temporary Structures Affects Notes In BDM Section 603

Stage 2 Review Submission Requirements Bridge Plans Complete General Notes Details show dimensions, bar marks & spacings Retaining Wall Plans Noise Barrier Plans Special Provisions Load Rating Report Major & Minor PDP only

Stage 3 Review Submission Requirements Stage 2 Plans in compliance with review comments Estimated Quantities Reinforcing Schedule Estimated Quantity Calculations Load Rating Report Minimal PDP only

Coming Soon… Fatigue Policy Fatigue Analysis for welded cover plate retrofit: Less Subjective Other Fatigue Details included Truck Volume Retrofit?HighYes Medium Analysis Required LowNo

Coming Soon… Stay-in-place metal forms Limited use basis Project specific examples: Environmental or site restrictions Faster bridges

Coming Soon… Life Cycle Cost Analysis Additional guidance for: When to use Interest rates Life expectancy

Coming Soon… LD-4 Estimating Form Provide estimated quantities for MSE Walls: Wall incidentals (e.g. cast-in- place concrete, select granular fill, unclassified excavation, etc.) Concrete coping incidentals (e.g. concrete, reinforcing steel, sealer, etc.)

Coming Soon… LRFD Developing ODOT Commentary to LRFD Pilot Projects Training Courses & Seminars Concrete Superstructures Steel Superstructures Substructures July 1, 2007!!

Coming Soon… Bridge Information Requests Web based information request Includes: Specialized bearings Modular joints Alternate coating systems Retired Standard Drawings

Questions?