PROJECT SCHEDULING By Deepika chaudhary. Project Scheduling Scheduling means estimation of time and resources required to complete activities and organise.

Slides:



Advertisements
Similar presentations
WBS: Lowest level OBS: Lowest level
Advertisements

1 1 Slide © 2006 Thomson South-Western. All Rights Reserved. Slides prepared by JOHN LOUCKS St. Edwards University.
Chapter 13 Project Scheduling: PERT/CPM
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
Network Diagramming Network Analysis  The common term for network analysis is PERT  PERT stands for Program Evaluation and Review Technique  The word.
8-1 Scheduling Scheduling Defined Gantt Charts Network Techniques: PERT and CPM Determining Task Durations Probability and Simulation Some Examples.
Gantt Chart Graph or bar chart with a bar for each project activity that shows passage of time Provides visual display of project schedule Slack amount.
Project Scheduling Prof. Jiang Zhibin Dept. of IE, SJTU.
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
Project Management in Practice Fifth Edition Copyright © 2014 John Wiley & Sons, Inc. Chapter 5 Scheduling the Project.
Manjari Akella Pranava Nagpal B-Tech(CSE) 4 th Year.
MGMT 483 Week 8 Scheduling.
1 Operations Management Lesson 5 Project Management.
Projects: Critical Paths Dr. Ron Lembke Operations Management.
2 Project Management  Management of work to develop and implement an innovation or change in an existing organization Examples: –New buildings –Weapon.
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
Project Management. Maintenance and Reliability 14 Aug 2001.
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 6 Project Management.
Roberta Russell & Bernard W. Taylor, III
Gantt and PERT charts. Representing and Scheduling Project Plans Gantt Charts Useful for depicting simple projects or parts of large projects Show start.
Project Management © Wiley 2007.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
The Critical Path – Precedence diagram method Luise Lorenz Christina Mohr.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Lesson №2. is the unique activity that has a beginning and an end time, aimed at achieving a predetermined result/goal, the creation of a specific, unique.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Project Management Chapter Unique, one-time operations designed to accomplish a specific set of objectives in a limited time frame. Build A A.
Project Management: A Managerial Approach
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
Project Scheduling Project Management 517 Chapter 8 Prof. M. Anvari
A project can be considered as consisting of several phases: Client’s needs;Work breakdown Doing or delegating;Deliver; Objectives;SpecificationsMonitoring;Wrap.
Network Planning Techniques Program Evaluation & Review Technique (PERT): Developed to manage the Polaris missile project Many tasks pushed the boundaries.
Project Management (專案管理)
Project Management “Project Planning & Scheduling”
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
1 OMGT 3123 Project Management  Project Controlling  Project Management Techniques: PERT And CPM  The Framework Of PERT And CPM  Network Diagrams And.
PERT and CPM.
Richard Fisher 1 The University of Texas at Dallas Project Management Richard Fisher The University of Texas at Dallas.
Lecture 61 Project planning tool Lecture 62 Objectives Understand the reasons why projects sometimes fail Describe the different scheduling tools, including.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Operations Management Project Management
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
Software Project Scheduling By: Sohaib Ejaz Introduction A Gantt chart is a graphical representation of the duration of tasks against the progression.
Project Scheduling. Why Are Projects Late? an unrealistic deadline established by someone outside the software development group changing customer requirements.
Project Schedule & Gantt Chart Unit 4 – Virtual Project.
Project Management SAI’s Class. Project Management Task Cadets will create a project management plan and their project. a. Define the stages of project.
Survey Training Pack Session 17 – Budgeting and timelines for survey design and implementation.
Tools to Help  Product flow Dependencies and relationships of deliverables  Work breakdown structure The parts  PERT charts Program Evaluation and.
Project Management Project Controlling
PROJECT MANAGEMENT.
Project Management (專案管理)
Project Management: PERT/CPM
Project Management for Business
Unit 4 Project Design, implementation and evaluation
Projects: Critical Paths
Critical Path Method (CPM). Background & History Developed in the 1950s by the US Navy & Du Pont. Originally, the critical path method considered only.
PLANNING ENGINEERING AND PROJECT MANAGEMENT
PERT - The Program Evaluation and Review Technique
Chapter 16 – Project Management
Slides Prepared by JOHN LOUCKS
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
Exercise – A small building.
Project Management Project management is the discipline of organizing and managing resources in such a way that these resources deliver all the work required.
Presentation transcript:

PROJECT SCHEDULING By Deepika chaudhary

Project Scheduling Scheduling means estimation of time and resources required to complete activities and organise them. Scheduling means estimation of time and resources required to complete activities and organise them. The following tools can be used in project scheduling The following tools can be used in project scheduling

Tools Gantt chart Gantt chart Critical Path Method Critical Path Method PERT chart PERT chart

Gantt Chart A conceptually simple and effective technique in Gantt chart. A conceptually simple and effective technique in Gantt chart. A Gantt chart also known as timeline chart can be developed for entire project A Gantt chart also known as timeline chart can be developed for entire project Seperate chart can be developed for each project function Seperate chart can be developed for each project function

This calendar oriented chart represent each activity as a bar in calendar starting from the starting date and ending at ending date for that activity. This calendar oriented chart represent each activity as a bar in calendar starting from the starting date and ending at ending date for that activity.

A Gantt chart is a popular type of bar chart that illustrates a project schedule. Gantt charts illustrate the start and finish dates of the terminal elements and summary elements of a project. Terminal elements and summary elements comprise the work breakdown structure of the project. Some Gantt charts also show the dependency (i.e., precedence network) relationships between activities. Gantt charts can be used to show current schedule status using percent-complete shadings and a vertical "TODAY" line (also called "TIME NOW" or "DATA DATE"), as shown here A Gantt chart is a popular type of bar chart that illustrates a project schedule. Gantt charts illustrate the start and finish dates of the terminal elements and summary elements of a project. Terminal elements and summary elements comprise the work breakdown structure of the project. Some Gantt charts also show the dependency (i.e., precedence network) relationships between activities. Gantt charts can be used to show current schedule status using percent-complete shadings and a vertical "TODAY" line (also called "TIME NOW" or "DATA DATE"), as shown herebar chartproject scheduleterminal elementssummary elementsproject work breakdown structuredependencybar chartproject scheduleterminal elementssummary elementsproject work breakdown structuredependency

Critical Path Method In 1957, Dupont developed a project management method designed to address the challenge of shutting down for maintenance and then restarting the plants once the maintenance has been completed. In 1957, Dupont developed a project management method designed to address the challenge of shutting down for maintenance and then restarting the plants once the maintenance has been completed.

Given the complexity of process they developed the critical path method for managing of projects. Given the complexity of process they developed the critical path method for managing of projects. CPM provides the following benefits CPM provides the following benefits Provide graphical view of project. Provide graphical view of project. Predicts the time required to view the project. Predicts the time required to view the project.

Shows which activities are critical to maintain the schedule and which are not. Shows which activities are critical to maintain the schedule and which are not. CPM models the activities and events of a project as a network. CPM models the activities and events of a project as a network. Activities are depicted as nodes on the network and events that signify the beginning and ending of activities are depicted as arcs or lines between the nodes. Activities are depicted as nodes on the network and events that signify the beginning and ending of activities are depicted as arcs or lines between the nodes.

Steps in CPM planning Make a list of all activities involved in the project. Make a list of all activities involved in the project. Determine the sequence of activities. Determine the sequence of activities. Draw the network Diagram Draw the network Diagram Estimate activity completion time. Estimate activity completion time. Identify the critical path ( The critical path is the longest duration path through the network.) Identify the critical path ( The critical path is the longest duration path through the network.)

The critical path can be determined through following four parameters. The critical path can be determined through following four parameters. ES – Earliest Start time ES – Earliest Start time EF – Earliest Finish Time EF – Earliest Finish Time LF - Latest Finish Time LF - Latest Finish Time LS – Latest Start Time LS – Latest Start Time

ES – The earliest time at which the activity can start given that its precedent activities must be completed first. ES – The earliest time at which the activity can start given that its precedent activities must be completed first. EF- Es + the time required to finish the activity. EF- Es + the time required to finish the activity. LF- the time at which the activity can be completed without delaying the project. LF- the time at which the activity can be completed without delaying the project. LS – Its equal to the latest finish time minus time required to finish the activity LS – Its equal to the latest finish time minus time required to finish the activity

Slack Time For an activity is the time between its earliest and latest start time or between its earliest and latest finish time. For an activity is the time between its earliest and latest start time or between its earliest and latest finish time. Slack is the amount of time that an activity can be delayed past its earliest start or earliest finish without delaying the project. Slack is the amount of time that an activity can be delayed past its earliest start or earliest finish without delaying the project.

A critical path is the path through the project network in which one for all activities in the path a delay in critical path delays the project. Similarly to accelerate the project it is necessary to reduce the total time required for the activities in critical path. A critical path is the path through the project network in which one for all activities in the path a delay in critical path delays the project. Similarly to accelerate the project it is necessary to reduce the total time required for the activities in critical path.

PERT CHART A PERT chart is a project management tool used to schedule organize and coordinate tasks within a project. A PERT chart is a project management tool used to schedule organize and coordinate tasks within a project. PERT stands for program evaluation and review technique a methodology developed by US navy in 1950 to manage the polaris submarine missile program. PERT stands for program evaluation and review technique a methodology developed by US navy in 1950 to manage the polaris submarine missile program.

The PERT chart is sometimes preferred over the Gantt chart, another popular project management charting method, because it clearly illustrates task dependencies. On the other hand, the PERT chart can be much more difficult to interpret, especially on complex projects. Frequently, project managers use both techniques. The PERT chart is sometimes preferred over the Gantt chart, another popular project management charting method, because it clearly illustrates task dependencies. On the other hand, the PERT chart can be much more difficult to interpret, especially on complex projects. Frequently, project managers use both techniques.Gantt chartGantt chart