A project can be considered as consisting of several phases: Client’s needs;Work breakdown Doing or delegating;Deliver; Objectives;SpecificationsMonitoring;Wrap.

Slides:



Advertisements
Similar presentations
Chapter 17 Project Management McGraw-Hill/Irwin
Advertisements

Project Management Information Systems and Management.
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
Gantt Chart Graph or bar chart with a bar for each project activity that shows passage of time Provides visual display of project schedule Slack amount.
PERT / CPM PERTProgram Evaluation & Review Technique CPMCritical Path Method.
Project Scheduling Prof. Jiang Zhibin Dept. of IE, SJTU.
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
Manjari Akella Pranava Nagpal B-Tech(CSE) 4 th Year.
1 Operations Management Lesson 5 Project Management.
Projects: Critical Paths Dr. Ron Lembke Operations Management.
Importance of Project Schedules
BA 333 Operations Management
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 6 Project Management.
Project Time Management
Project Management Ross L. Fink. Definition of Project  A project is a specific, finite task to be accomplished.
Prepared by: Michael Palazzo
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
ENGM91 ACTIVITY PLANNING Unit 2
1 Project Management Chapter Lecture outline Project planning Project scheduling Project control CPM/PERT Project crashing and time-cost trade-off.
Project Management: A Managerial Approach
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 7 Project Manager’s Toolkit for Time Management.
PROJECT SCHEDULING By Deepika chaudhary. Project Scheduling Scheduling means estimation of time and resources required to complete activities and organise.
Project Management (專案管理)
Project Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Richard Fisher 1 The University of Texas at Dallas Project Management Richard Fisher The University of Texas at Dallas.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
PROJECT MANAGEMENT Approaches
Richard Fisher 1 The University of Texas at Dallas Project Management Richard Fisher The University of Texas at Dallas.
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design.
Lecture 61 Project planning tool Lecture 62 Objectives Understand the reasons why projects sometimes fail Describe the different scheduling tools, including.
Chapter 3 Managing the Information Systems Project
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
Project Management Organization Scheduling 31 January.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
Software Project Scheduling By: Sohaib Ejaz Introduction A Gantt chart is a graphical representation of the duration of tasks against the progression.
Project Scheduling. Why Are Projects Late? an unrealistic deadline established by someone outside the software development group changing customer requirements.
Project Planning & Scheduling What is a “project”? Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time Networks.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Project Management Planning and Scheduling. “Failing to plan is planning to fail” by J. Hinze, Construction Planning and Scheduling Planning: “what” is.
Tools to Help  Product flow Dependencies and relationships of deliverables  Work breakdown structure The parts  PERT charts Program Evaluation and.
Managing the Information Systems Project Cont’d
Chapter 16 – Project Management
Project Management.
Project Management Project Controlling
PROJECT MANAGEMENT.
Project Management (專案管理)
Management should be based on effective and thorough planning
Chapter 17 Project Management McGraw-Hill/Irwin
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
REQUIREMENTS Project management tools
Project Planning & Scheduling
Projects: Critical Paths
Project Planning and Budgeting
Chapter 16 – Project Management
Slides Prepared by JOHN LOUCKS
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
Presentation transcript:

A project can be considered as consisting of several phases: Client’s needs;Work breakdown Doing or delegating;Deliver; Objectives;SpecificationsMonitoring;Wrap up; Strategy.ScheduleAdjusting.Evaluate; BudgetCelebrate. DEFININGPLANNINGIMPLEMENTINGCOMPLETING

Why is PP so important? With a good plan you can avoid most common reasons why projects collapse. Reasons like: Time Optimism Human resources arrangement No Full-Control

PROJECT PARAMETERS or TRIPLE CONSTRAINTS: -> QUALITY -> TIME -> COST One of these will be the driver, the most important. Another will be the secondary constraint; The third will be the weak constraint. The driver needs to be carefully determined by asking the client questions.

Project Planning STEPS: 1.Estimate the duration of each activity. 2. Determine the sequence of activities and assign them.

STEP ONE: Estimate the duration of each activity. WBS

The WBS was initially developed by the U.S. Defence estabilishment, and it is described in Military Standard (MIL-STD) 881B (25 Mar 93): "A work breakdown structure is a product- oriented family tree composed of hardware, software, services, data and facilities.... [it] displays and defines the product(s) to be developed and/or produced and relates the elements of work to be accomplished to each other and to the end product(s)."

Main idea is to divide the project into smaller, managable parts Many levels Division types examples: Lifecycles Work types Requirements What WBS really is? WORK BREAKDOWN STRUCTURE

Each part has to be: Manageable specific authority and responsibility assigned to each Independent minimum interfacing with and dependence on other tasks Integratable the total project is accounted for by the set of tasks Measurable results measured in terms of progress by completion of tasks.

Some simple math: To = an optimistic estimate of how long the task will take Tp = a pessimistic estimate of how long the task will take Tm = the most probably estimate of how long the task will take Then determine the expected time Te (time expected) by using the following formula Te = (To + 4 Tm + Tp ) / 6

Trap: Don’t get TOO excited! Why? Partitioning your into micro-parts may: Kill creativity Kill your(PM) free time When micro-planning is ok? Lack of motivation AI below avagare

What next? Pick One: Gantt chart PERT chart CPA

Gantt chart: The Gantt chart, developed by Charles Gantt in 1917, focuses on the sequence of tasks necessary for completion of the project at hand. Each task on a Gantt chart is represented as a single horizontal bar on an X-Y chart

TaskPossible startLengthTypeDependent on High level analysisweek 15 dayssequential 2. Selection of hardware platformweek 11 daysequential1 3. Installation and commissioning of hardwareweek 32 weeksparallel2 4. Detailed analysis of core modulesweek 12 weekssequential1 5. Detailed analysis of supporting utilitiesweek 12 weekssequential4 6. Programming of core modulesweek 43 weekssequential4 7. Programming of supporting modulesweek 43 weekssequential5 8. Quality assurance of core modulesweek 51 weeksequential6 9. Quality assurance of supporting modulesweek 51 weeksequential7 10.Core module trainingweek 71 dayparallel6 11.Development of accounting reportingweek 61 weekparallel5 12.Development of management reportingweek 61 weekparallel5 13.Development of management analysisweek 62 weekssequential5 14.Detailed trainingweek 71 weeksequential Documentationweek 42 weeksparallel13

What is CPA? In 1957, DuPont developed the Critical Path Method (CPM) for managing shutting down chemical plants. CPM provides the following benefits: Provides a graphical view of the project. Predicts the time required to complete the project. Shows which activities are critical to maintaining the schedule and which are not.

How to make CPA chart? 1. List all activities in the plan ->earliest start date, ->estimated length of time it will take, -> is it parallel or sequential. If tasks are sequential, show which stage they depend on.

TaskPossible startLengthTypeDependent on High level analysisweek 15 dayssequential 2. Selection of hardware platformweek 11 daysequential1 3. Installation and commissioning of hardwareweek 32 weeksparallel2 4. Detailed analysis of core modulesweek 12 weekssequential1 5. Detailed analysis of supporting utilitiesweek 12 weekssequential4 6. Programming of core modulesweek 43 weekssequential4 7. Programming of supporting modulesweek 43 weekssequential5 8. Quality assurance of core modulesweek 51 weeksequential6 9. Quality assurance of supporting modulesweek 51 weeksequential7 10.Core module trainingweek 71 dayparallel6 11.Development of accounting reportingweek 61 weekparallel5 12.Development of management reportingweek 61 weekparallel5 13.Development of management analysisweek 62 weekssequential5 14.Detailed trainingweek 71 weeksequential Documentationweek 42 weeksparallel13

2. Plot the activities as a circle and arrow diagram CPM models the activities and events of a project as a network. Activities  nodes Events  arcs or lines

Identify the Critical Path The critical path is the longest-duration path through the network. The critical path can be identified by determining the following four parameters for each activity: ES - earliest start time: EF - earliest finish time, LF - latest finish time: LS - latest start time,

The critical path is the path through the project network in which none of the activities have slack, that is, the path for which ES=LS and EF=LF for all activities in the path. A delay in the critical path delays the project.

The Program Evaluation and Review Technique (PERT) is a network model that allows for randomness in activity completion times. PERT was developed in the late 1950's for the U.S. Navy's Polaris project having thousands of contractors. It has the potential to reduce both the time and cost required to complete a project. What is PERT?

PERT is a variation on Critical Path Analysis that takes a slightly more skeptical view of time estimates made for each project stage. To use it, estimate the shortest possible time each activity will take, the most likely length of time, and the longest time that might be taken if the activity takes longer than expected.

Example of a PERT chart:

Gantt Reloaded Shows inter-relationships between activities Can show the results of work at given time Can assign roles to workers