1 L U N D S U N I V E R S I T E T P rojektledning och Projektmetodik.

Slides:



Advertisements
Similar presentations
Precedence Diagramming
Advertisements

CP Chapter 4 Schedule Planning.
Work Breakdown Structures
Advanced Project Management - CPH
CSSE 372 Week 6 Day 2 Constructing and Analyzing the Project Network Diagram  PERT Chart PERT was invented for the Nautilus submarine project. Ok, maybe.
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
Critical Path and Gantt
Creating the Project Plan
PREPARED BY : NOR AZAH BINTI AZIZ KOLEJ MATRIKULASI TEKNIKAL KEDAH PROJECT NETWORK DIAGRAM.
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
Project Time Management
Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Chapters 8, 9, and 10 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
BSBPMG503A Manage Project Time 6.5 Develop Schedule The process of analysing activity sequences, durations, resource requirements and schedule constraints.
Importance of Project Schedules
Project Time Management
Time Management Ahmed Awad, Ph.D., PMP. Time Management It includes the processes required to ensure timely completion of the project. b Activity Definition.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 6 Project Time Management.
Project Management Chapter 3 BUSI 2106 – Operations Management.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
Project Management Software Tools Cheryl A. Wilhelmsen Lee Ostrom.
Project Management Methodology Project monitoring and control.
HIT241 - TIME MANAGEMENT Introduction
Project Management Application in Health IT Farrokh Alemi, Ph.D. Geff Garnhart, PMP.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Scheduling Sequence & Time.
TIME MANAGEMENT Definition: Time management is a set of principles, practices, skills, tools, and systems that work together to help you get more value.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
POST GRADUATE PROGRAM OF INFORMATION TECHNOLOGY
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
Welcome to Session 4 – Project Management Process Overview (continued) Instructor:Phyllis Sweeney Instructor: Phyllis Sweeney Project Management Certificate.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
1 Project Management Chapter Lecture outline Project planning Project scheduling Project control CPM/PERT Project crashing and time-cost trade-off.
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
Lecture 7. Review of Lecture 6 Project Scheduling: The process of defining project activities, determining their sequence, estimating their duration Scheduling.
Managing Project Resources. Project Resources Human Resources Project stakeholders: – Customers – Project team members – Support staff Systems analyst.
Project Time Con trol. Control = Monitor + Compare + Analysis + Action  Definition: Controlling  Controlling involves making sure that the results achieved.
Lecture 6. Review of Lecture 5 Company strategic planning: mission and objective statements and competitive strategy. Planning Methods: Top-down, Bottom-up.
1IT Project Management, Third Edition Chapter 6 Chapter 6: Project Time Management.
Geog 469 GIS Workshop Project Management.
Advanced Project Management Project Time Management Ghazala Amin.
11/9/2015 9:42 AM 1 Project Time Control. 11/9/2015 9:42 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
Chapter 6: Project Time Management Information Technology Project Management, Fourth Edition Using Critical Chain Scheduling, PERT, and MS Project 2003.
Chapter 3 Managing the Information Systems Project
Chapter 6: Project Time Management Information Technology Project Management, Fourth Edition Using Critical Path and MS Project 2003 Tuesday, February.
1 EASTERN MEDITERRANEAN UNIVERSITY FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING CIVL 493 Construction Management Assoc. Prof. Dr. Ibrahim YITMEN.
Project Time Management Ashima Wadhwa. Schedule Development – Determining start and finish dates for project activities – Without realistic dates, project.
Advanced Project Management Tools and Techniques of Project Planning Ms. Ghazala Amin Slides Courtesy: Dr. A Z. Khan.
Project Time Management
Microsoft Project 2010 ® Tutorial 4: Assigning Resources and Costs.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
BSBPMG503A Manage Project Time Manage Project Time Project Time Processes Part 2 Diploma of Project Management Qualification Code BSB51507 Unit Code.
Project Time Management Based on PMBOK 5 th Edition Abdelrahman Sheta, PMP,ITIL 1PMP - Project Time Managementfacebook.com/Sheta.Page.
Introduction to Project Management Chapter 7 Managing Project Resources Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Time Management.
Chapter 6: Project Time Management
CHAPTER 6 PROJECT TIME MANAGEMENT
Project Time Management
Project Time Management
Project Time Management
Project Time Management
Project Time Management
Exercise – A small building.
Importance of Project Schedules
Project Time Management
CHAPTER 6 PROJECT TIME MANAGEMENT
Presentation transcript:

1 L U N D S U N I V E R S I T E T P rojektledning och Projektmetodik

2 L U N D S U N I V E R S I T E T Project Time Management Planning and Scheduling

3 L U N D S U N I V E R S I T E T Project Time Management. 6.1 Act. definition.1 Inputs.2 Tools and Techniques.3 Output 6.2 Act. Sequencing6.3 Act. Duration.1 Inputs.2 Tools and Techniques.3 Output.1 Inputs.2 Tools and Techniques.3 Output 6.4 Schedule dev..1 Inputs.2 Tools and Techniques.3 Output 6.5 Schedule Control.1 Inputs.2 Tools and Techniques.3 Output

4 L U N D S U N I V E R S I T E T Project Process Groups

5 L U N D S U N I V E R S I T E T What is Project Time Management? Time Management: Includes the processes required to ensure timely completion Processes of Project Time Management: 1. Activity definition– identify the activities required 2. Activity Sequencing– identify interactivity dependencies 3. Activity Duration Estimating– estimate work periods 4. Schedule Development– analyze activity sequencing, durations, resource requirements to create schedule 5. Schedule Control– controlling changes to the project schedule

6 L U N D S U N I V E R S I T E T Tools and techniques Input: Work Breakdown Structure Scope Statement Historical Information Tools and Techniques: Arrow diagramming method Network templates Time and Resource Analysis Output: Project Schedule (Resource histogram) (Project Reports)

7 L U N D S U N I V E R S I T E T What is Planning? ”To forecast and describe future events”

8 L U N D S U N I V E R S I T E T What is Project Planning? Communication Basis for the Decision Process Schedule is a Project Map Identify Potential Problems

9 L U N D S U N I V E R S I T E T Basic Planning Terms TaskAssignment that consumes time and resources EventMomentarily. Consumes no time or resources LinkDescribes Relations Between Tasks (events) ResourcesAll Things Needed to Accomplish a Task

10 L U N D S U N I V E R S I T E T Task Duration and Work Duration: (days, weeks, month) The Time Span from Start to Finish Work: (man hours) The Amount of Time the Resource spends Working with the Task

11 L U N D S U N I V E R S I T E T Task “A” Duration 5 days add one Duration 2,5 days 1 Resource unit (100%) resource 2 Resource units (200%) Work 40 h unit Work 40 h Task - Effort Driven

12 L U N D S U N I V E R S I T E T Task - Not Effort Driven Task “B” Duration 5 days add one Duration 5 days 1 Resource unit (100%) resource 2 Resource units (200%) Work 40 h unit Work 80 h

13 L U N D S U N I V E R S I T E T Four Types of Links Finish to Start AB A B Start to Start A B Start to Finish A B Finish to Finish

14 L U N D S U N I V E R S I T E T Type of Networks "Activity on arrow"-method and "Activity on node"-method. Which of the methods is the best, is often discussed.

15 L U N D S U N I V E R S I T E T "Activity on arrow" is event oriented Network Items –Events –Tasks –Links Activity on arrow

16 L U N D S U N I V E R S I T E T Activity on Node “The Activity on node” is Task oriented Network Items  Tasks (Events)  Links 5 days A 8 days B 6 days C 11 days D 10 days E

17 L U N D S U N I V E R S I T E T Gantt Chart

18 L U N D S U N I V E R S I T E T Analysing Networks - Time Analysis 1.Identify the Tasks 2.Establish Network 3.Perform a Time Analysis Calculation of Early Dates Calculation of Late Dates Identification of Critical Path and Float

19 L U N D S U N I V E R S I T E T Analysing Networks - Time Analysis 5 weeks 05A0505A05 Early Start Early Finish Late Start Late Finish Duration

20 L U N D S U N I V E R S I T E T Analysing Networks - Time Analysis ”Forward” calculation - from left to right to calculate Early dates ”Backward” calculation- from right to left to calculate Late dates A BC E D

21 L U N D S U N I V E R S I T E T Critical Path The sequence of tasks, events and dependencies that determines the early finish date of a network. A delay of a task on the critical path will delay the whole network.

22 L U N D S U N I V E R S I T E T Total and Free Float Total Float:The time a task may be moved without delaying the network. Free Float:The time a task may be moved without delaying any other task.

23 L U N D S U N I V E R S I T E T Example: Total and Free Float Task Total Float Free Float Start0 Days0 Days Task A0 Days0 Days Task B0 Days0 Days Task C4 Days2 Days Task D2 Days2 Days Finish0 Days0 Days

24 L U N D S U N I V E R S I T E T Act. 1 (1 d) Act. 2 (3 d) Act. 3 (4 d) Act. 6 (2 d) Act. 5 (4 d) Act. 4 (6 d) Act. 7 (2 d) Act. 8 (4 d) Act. 9 (1 d) Time Analysis

25 L U N D S U N I V E R S I T E T Time Analysis in MS Project 98

26 L U N D S U N I V E R S I T E T Gantt Chart

27 L U N D S U N I V E R S I T E T Time and Resource Analysis Time analysis is automatically performed by MS Project - calculates project duration - identifies the critical path and task float - resource availability is not considered Resource Analysis is performed on command - based on time analysis - consider available resources - manage resource overallocation

28 L U N D S U N I V E R S I T E T Resource Analysis Resource Analysis - Time Critical Resource Analysis - Resource Critical Time CriticalResource Critical

29 L U N D S U N I V E R S I T E T

30 L U N D S U N I V E R S I T E T

31 L U N D S U N I V E R S I T E T Progress Control Why tracking project progress? Identify deviations from the baseline Updated on the project status Prognoses on actual duration and costs Correcting actions

32 L U N D S U N I V E R S I T E T What information are followed-up? Task:Resource: - actual start- actual work - Work complete (% of total)- remaining work - remaining duration- actual costs - actual finish- remaining costs