P. Limon December 11, 2003 ICFA Vacuum Workshop 2003 Fermilab 1 Outline  A quick review of the VLHC oA short description oSome important technical points.

Slides:



Advertisements
Similar presentations
Beam-Beam Effects for FCC-ee at Different Energies: at Different Energies: Crab Waist vs. Head-on Dmitry Shatilov BINP, Novosibirsk FCC-ee/TLEP physics.
Advertisements

CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
1 Methods of Experimental Particle Physics Alexei Safonov Lecture #8.
A.KOVALENKO SUPERCONDUCTING MAGNETS for NICA BOOSTER & COLLIDER NICA ROUND TABLE DISCUSSION - 3 JINR, Dubna, November 05, 2008.
11 October 2006Basic Layout of LER G. de Rijk1 Basic Layout of LER  The basic idea  VLHC type magnets  LER in the LHC tunnel  Layout  LER experiment.
Quadrupole Magnetic Design for an Electron Ion Collider Paul Brindza May 19, 2008.
1 LHeC Considerations for a Lepton Hadron Collider Option for the LHC F. Willeke, BNL The 4th Electron Ion Collider Workshop Hampton University,
P. Limon HADRON COLLIDERS July 17, 2003 EPS 2003 Aachen 1 Outline  The Tevatron oWhat are the issues? oWhat is the plan for the immediate future?  The.
A. Bay Beijing October Accelerators We want to study submicroscopic structure of particles. Spatial resolution of a probe ~de Broglie wavelength.
Super-B Factory Workshop January 19-22, 2004 Accelerator Backgrounds M. Sullivan 1 Accelerator Generated Backgrounds for e  e  B-Factories M. Sullivan.
Luminosity Prospects of LHeC, a Lepton Proton Collider in the LHC Tunnel DESY Colloquium May F. Willeke, DESY.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
Beam Dynamics Tutorial, L. Rivkin, EPFL & PSI, Prague, September 2014 Synchrotron radiation in LHC: spectrum and dynamics The Large Hadron Collider (LHC)
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
Prospects of SC Quadrupole Production at IHEP-Protvino The 2nd Institutes Meeting on International Construction of the FAIR Accelerator Complex Protvino,
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
P. Limon January 7, 2001 VLHC Study SAG 1 First, a little recent history  After Snowmass-1996, we had the following plan oA VLHC of 100 TeV (center-of-mass)
1 M. Modena for the CLIC MDI magnet study Team (A. Aloev, P. Thonet, E. Solodko, A. Vorozhtsov) CLIC MDI Meeting,16 January 2015.
March 2011Particle and Nuclear Physics,1 Experimental tools accelerators particle interactions with matter detectors.
Concept of a hybrid (normal and superconducting) bending magnet based on iron magnetization for km lepton / hadron colliders Attilio Milanese, Lucio.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
1/18 The Distribution of Synchrotron Radiation Power in the IR C. H. Yu IR Overview SR Distribution in the IR The Protection of SR Power.
The FCC Magnet Program: Challenges and Opportunities for HTS
The ISIS strong focusing synchrotron also at the Rutherford Appleton Laboratory. Note that ISIS occupies the same hall as NIMROD used to and re- uses some.
Cryogenic Experts Meeting (19 ~ ) Cooling scheme discussion for 300 Tm High Energy Beam Transfer line (HEBT) with large inclination MT/FAIR –
Future Accelerators at the High Energy Frontier
Scaling of High-Energy e+e- Ring Colliders K. Yokoya Accelerator Seminar, KEK 2012/3/15 Accelerator Seminar Yokoya 1.
Permanent Magnet Quadrupoles for the CLIC Drive Beam Jim Clarke, Norbert Collomb, Neil Marks, James Richmond, and Ben Shepherd STFC Daresbury Laboratory,
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
1 Tunnel implementations (laser straight) Central Injector complex.
Current CLIC Energy Stages D. Schulte1. Main Beam Generation Complex Drive Beam Generation Complex Layout at 3 TeV D. Schulte2.
Partikeldagarna, Göteborg 21 September 2007 LHC: Status and Plans Lyn Evans.
4 th International Workshop on VHMP, Alushta 2 June 2003 Carmine Elvezio Pagliarone A j u m p i n t o t h e F u t u r e !
Large-circumference, Low-field Optimization of a Future Circular Collider 1 Michigan State Univ. 350 GeV e + e TeV pp 300 TeV pp Peter McIntyre,
General Considerations for the Upgrade of the LHC Insertion Magnets
S. Gourlay 7/19/01 T2 Working Group Summary T2 Working Group Summary Magnet Technology: Permanent Magnets, Superconducting Magnets, Power Supplies Conveners:
P. Limon October 16, 2003 Hadron Collider Workshop 2003 Fermilab 1 Outline  A quick review of the VLHC oA short description oSome important technical.
LARP Magnet Progress Michael Lamm For the LARP Collaboration bnl - fnal - lbnl - slac US LHC Accelerator Research Program All Experimenters’ Meeting Monday,
CLIC Energy Stages Meeting D. Schulte1 D. Schulte for the CLIC team.
Design and construction of Nuclotron-based Ion Collider fAcility (NICA) and Mixed Phase Detector (MPD) Design and construction of Nuclotron-based Ion Collider.
US LHC Accelerator Research Program (LARP) Background  Proposed in 2003 to coordinate efforts at US labs related to the LHC accelerator (as opposed to.
What I’ve been doing. My Problem: Conceptually LHeC: linear electron collider Basic Design: linac will be connected to a recirculation track (why?) Goal:
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
John Womersley 1/13 Fermilab’s Future John Womersley Fermilab May 2004.
Superconducting Technologies for the Next Generation of Accelerators CERN, Globe of Science and Innovation 4-5 December Superconducting Links for the Hi-Lumi.
F High Energy Colliders Vladimir Shiltsev Fermilab Steering Group.
HHH From Pipetron to LER: history of a brilliant idea and goal of this workshop Lucio Rossi CERN CARE-HHH workshop on LER CERN -11 October 2006.
BERKELEY LAB Future Hadron Colliders: The Farthest Energy Frontier William Barletta 42nd Eloisatron Workshop Erice, 29 September 2003 E. Fermi.
Magnet R&D for Large Volume Magnetization A.V. Zlobin Fermilab Fifth IDS-NF Plenary Meeting 8-10 April 2010 at Fermilab.
Future Colliders Gordon Watts University of Washington/Seattle APS NW Meeting May 12-14, 2016.
HISTORY OF SNS DESIGN AND TECHNOLOGY CHOICES PROJECT X WORKSHOP NOVEMBER 12-13, 2007 R. KUSTOM.
MCTF C. Johnstone MCD meeting 11 Nov New Ideas for Collider IR design: Flat Beams C. Johnstone and N. Mokhov, Fermilab MCD meeting November 11,
Layout and Arcs lattice design A. Chancé, B. Dalena, J. Payet, CEA R. Alemany, B. Holzer, D. Schulte CERN.
Lucio Rossi The High Luminosity LHC Project Distinguished Lecturer 2013.
contribution to the round table discussion
M Chorowski, H Correia Rodrigues, D Delikaris, P Duda, C Haberstroh,
Warm magnets for LHeC / Test Facility arcs
Joint Meeting SPS Upgrade Study Group and SPS Task Force
Future Collider Projects at CERN
Beam Pipe Meeting Introduction
The PEP-II Interaction e+e- Factories Workshop
Synchrotron Ring Schematic
Beam-Beam Effects in High-Energy Colliders:
Power Consideration of CEPC
Electron Collider Ring Magnets Preliminary Summary
MEIC Alternative Design Part V
Crab Crossing Named #1 common technical risk (p. 6 of the report)
Cryogenic management of the LHC Run 2 dynamic heat loads
Presentation transcript:

P. Limon December 11, 2003 ICFA Vacuum Workshop 2003 Fermilab 1 Outline  A quick review of the VLHC oA short description oSome important technical points  What are the limitations on performance due to synchrotron radiation?  Improving the performance?

P. Limon December 11, 2003 ICFA Vacuum Workshop 2003 Fermilab 2 Design Study for a Staged Very Large Hadron Collider Fermilab-TM-2149 June 11,

P. Limon December 11, 2003 ICFA Vacuum Workshop 2003 Fermilab 3 The Staged VLHC Concept  Take advantage of the space and excellent geology near Fermilab. oBuild a BIG tunnel. oFill it with a “cheap” 40 TeV collider. oLater, upgrade to a 200 TeV collider in the same tunnel.  Spreads the cost  Produces exciting energy-frontier physics sooner & cheaper  Allows time to develop cost-reducing technologies for Stage 2  Creates a high-energy full-circumference injector for Stage 2  A large-circumference tunnel is necessary for a synchrotron radiation-dominated collider.  This is a time-tested formula for success Main Ring  TevatronLEP  LHC

P. Limon December 11, 2003 ICFA Vacuum Workshop 2003 Fermilab 4 Conclusions (1)  A staged VLHC starting with 40 TeV and upgrading to 200 TeV in the same tunnel is, technically, completely feasible.  There are no serious technical obstacles to the Stage-1 VLHC at 40 TeV and luminosity. oThe existing Fermilab accelerator complex is an adequate injector for the Stage-1 VLHC, but lower emittance would be better. (We should take this into account if Fermilab builds a high-power injector. Low emittance is important!) oVLHC operating cost is moderate, using only 20 MW of refrigeration power, comparable to the Tevatron. oImprovements and cost savings can be gained through a vigorous R&D program in magnets and underground construction.

P. Limon December 11, 2003 ICFA Vacuum Workshop 2003 Fermilab 5 Conclusions (2)  The construction cost of the first stage of a VLHC is comparable to that of a linear electron collider, ~ $4 billion using “European” accounting. oFrom this and previous studies, we note that the cost of a collider of energy near 40 TeV is almost independent of magnetic field. oA total construction time of 10 years for Stage-1 is feasible, but the logistics will be complex. oMaking a large tunnel is possible in the Fermilab area. Managing such a large construction project will be a challenge. oBuilding the VLHC at an existing hadron accelerator lab saves significant money and time.

P. Limon December 11, 2003 ICFA Vacuum Workshop 2003 Fermilab 6 Conclusions (3)  The Stage 2 VLHC can reach 200 TeV and 2x10 34 or possibly significantly more in the 233 km tunnel. oA large-circumference ring is a great advantage for the high- energy Stage-2 collider. A small-circumference high-energy VLHC may not be realistic. oThere is the need for magnet and vacuum R&D to demonstrate feasibility and to reduce cost.  Result of work completed after the “Study.” oFor very high energy colliders, very high magnetic fields (B>12T) are not the best solution.

P. Limon December 11, 2003 ICFA Vacuum Workshop 2003 Fermilab 7 VLHC Parameters

P. Limon December 11, 2003 ICFA Vacuum Workshop 2003 Fermilab 8 Transmission Line Magnet  2-in-1 warm iron  Superferric: 2T bend field  100kA Transmission Line  alternating gradient (no quadrupoles needed)  65m Length  Self-contained including Cryogenic System and Electronics Cabling  Warm Vacuum System 30cm support tube/vacuum jacket cry pipes 100kA return bus vacuum chamber SC transmission line

P. Limon December 11, 2003 ICFA Vacuum Workshop 2003 Fermilab 9 The First Stage-1 Magnet Yokes

P. Limon December 11, 2003 ICFA Vacuum Workshop 2003 Fermilab 10 VLHC Tunnel Cross Section

P. Limon December 11, 2003 ICFA Vacuum Workshop 2003 Fermilab 11 Underground Construction  Three orientations chosen to get representative geological samples of sites near Fermilab. oSouth site samples many geologic strata and the Sandwich fault. oOne north site is flat and goes through many strata. oOther north site is tipped to stay entirely within the Galena- Platteville dolomite, and is very deep.  These are not selected sites – merely representative. oCost of other sites can be built from data gained in these sites.

P. Limon December 11, 2003 ICFA Vacuum Workshop 2003 Fermilab 12 Stage-2 Magnets  There are several magnet options for Stage 2. Presently Nb 3 Sn is the most promising superconducting material. Stage-2 Dipole Single-layer common coil Stage-2 Dipole Warm-iron Cosine 

P. Limon December 11, 2003 ICFA Vacuum Workshop 2003 Fermilab 13 Stage-2 Cost & Performance  What are the general design ideas that exist for magnets for the Stage 2 VLHC?  We did not make a cost estimate of the Stage 2 VLHC, but we tried to understand major cost sensitivities. oFor example, how does the cost vary as a function of magnetic field?  After the “Study,” we did some work to help understand the limitations of Stage 2 performance. oDoes synchrotron radiation put limits on performance, or does it influence the choice of magnetic field?  These questions were studied to help guide future R&D.

P. Limon December 11, 2003 ICFA Vacuum Workshop 2003 Fermilab 14 VLHC Cost based on SSC cost distribution

P. Limon December 11, 2003 ICFA Vacuum Workshop 2003 Fermilab 15 Synchrotron radiation power per meter

P. Limon December 11, 2003 ICFA Vacuum Workshop 2003 Fermilab 16 VLHC Beam Screen

P. Limon December 11, 2003 ICFA Vacuum Workshop 2003 Fermilab 17 Beam Screen Heat Transfer

P. Limon December 11, 2003 ICFA Vacuum Workshop 2003 Fermilab 18 Optimum BS temperature & coolant flow

P. Limon December 11, 2003 ICFA Vacuum Workshop 2003 Fermilab 19 P SR 2 t sr Int/cross < 60 L units cm -2 s -1 VLHC Optimum Field

P. Limon December 11, 2003 ICFA Vacuum Workshop 2003 Fermilab 20 Photon Stops  Synchrotron radiation masks look promising. They decrease refrigerator power and permit higher energy and luminosity. They are practical only in a large-circumference tunnel.

P. Limon December 11, 2003 ICFA Vacuum Workshop 2003 Fermilab 21 Maximum magnet length vs. bend radius with photon stops

P. Limon December 11, 2003 ICFA Vacuum Workshop 2003 Fermilab 22 Magnet aperture required for beam screen and photon stops 200 TeV; 30 km bend radius 14 m magnet length Min. PS-beam clearance=4 mm Coil aperture increases due to increased coolant flow requirements

P. Limon December 11, 2003 ICFA Vacuum Workshop 2003 Fermilab 23 Wall power vs. synchrad power for various concepts

P. Limon December 11, 2003 ICFA Vacuum Workshop 2003 Fermilab 24 Photon Stops Test

P. Limon December 11, 2003 ICFA Vacuum Workshop 2003 Fermilab 25 Diagram of photon stop test

P. Limon December 11, 2003 ICFA Vacuum Workshop 2003 Fermilab 26 Photon Stop Test Results

P. Limon December 11, 2003 ICFA Vacuum Workshop 2003 Fermilab 27 Stage-2 VLHC Conclusions  The Stage 2 VLHC can reach 200 TeV and 2x10 34 or more in the 233 km tunnel. This corresponds to 5 W/m of synchrad power.  A large-circumference ring is a great advantage for the high-energy Stage-2 collider because it allows photon stops.  Photon stops may permit much greater synchrad power, and, hence, much greater luminosity.  A small-circumference (i.e. high field) high-energy VLHC may not be realistic. oThe optimum magnetic field for a TeV collider is less than the highest field strength attainable because of synchrotron radiation, total collider cost and technical risk.  The minimum aperture of the magnet is determined by beam stability and synchrotron radiation, not by field quality.  There is the need for magnet and vacuum R&D to demonstrate feasibility and to reduce cost. oThis R&D will not be easy, will not be quick, and will not be cheap.

P. Limon December 11, 2003 ICFA Vacuum Workshop 2003 Fermilab 28 A Word About R&D  If we ever want a VLHC, we have to keep at the R&D, particularly for high- and low-field magnets, tunneling and vacuum.  The machines we are talking about are very costly and very complex. oMistakes and delays are potentially very damaging financially, politically and scientifically. oIt takes longer than you think to develop the components of a cutting-edge collider.  The R&D investment for future HEP instruments will be much greater than we are accustomed to.

P. Limon December 11, 2003 ICFA Vacuum Workshop 2003 Fermilab 29 Additional Notes  The most important requirement for the survival of HEP is worldwide cooperation resulting in a global strategy based on a visionary science roadmap.  Sell the science, not the instruments oLearn from the NASA strategy, in which the goals are truly large and visionary, and the instruments are missions along the way.  The parameters and schedule for a VLHC will depend on the timing and location of all other large facilities. The global plan should recognize these couplings.  If we ever want to build a VLHC, or any other very large facility, we need to have a vigorous R&D program now. oThe R&D is very challenging, and the penalty for failure will be severe.

P. Limon December 11, 2003 ICFA Vacuum Workshop 2003 Fermilab 30 Last Slide