Butterfly Village (PLN080209) Monterey County RMA- Planning Director July 30, 2008.

Slides:



Advertisements
Similar presentations
Ninth Amendment to the Orange County / City of Maitland Joint Planning Area Agreement April 17, 2007 Ninth Amendment to the Orange County / City of Maitland.
Advertisements

City Council Hearing March 3, 2008 SIERRA POINT BIOTECH PROJECT.
Planning Commission, City of Brisbane Public Hearing for the Sierra Point Biotech Project November 29, 2007 SIERRA POINT BIOTECH PROJECT.
PARKS: Major Policy Topics  Park development guidelines  Joint use of park and recreation facilities  Park accessibility  Park acquisition priorities.
K INCORA V ILLAGE C ENTER ZMAP Board of Supervisors Committee of the Whole May 18, 2010.
Planning & Community Development Department Amendment to Fuller Master Plan 135 North Oakland Avenue Predevelopment Plan Review City Council Meeting June.
| perkinscoie.com Application by ConAm Properties, LLC for a Comprehensive Plan Map Amendment from “Commercial” to “Medium-High Density Residential” and.
PC Meeting July 1, 2015 CUP 15-02/DR 15-06/DR
Community Development Department PALM COAST PARK SECOND AMENDED AND RESTATED DEVELOPMENT OF REGIONAL IMPACT DEVELOPMENT ORDER Application #2167.
NORTH CENTRAL FLORIDA REGIONAL PLANNING COUNCIL REPORT AND RECOMMENDATION ALACHUA WEST DRI.
Community Development Department GRAND HAVEN DEVELOPMENT OF REGIONAL IMPACT City Council June 3, 2014.
Navigating SB 375: CEQA Streamlining and SB 743 Transportation Analysis 2014 San Joaquin Valley Fall Policy Conference.
BCC Public Hearing for consideration of an Agreement to Offer Donation of Real Property -and- a Solid Waste Management Permit Renewal APPLICANT: Hubbard.
North East Study Area Staff Recommendation Thursday, June 25, 2009.
Agricultural Preserves Program Uniform Rules Update Office of Long Range Planning Board of Supervisors Hearing September 25, 2007.
 Part 2: Community Design: Respect and Care for the Natural Environment Joe Duggan 1.
City of New Brighton Planning Commission Meeting October 18, 2005 Agenda Item: 6A (Public Hearing) Special Use Permit for Detached Garage Exceeding 624.
Planning Area Standards May 18, Outline of today’s meeting Introductions Recap of previous community meetings Planning Area Standards Discussion.
Board of County Commissioners PUBLIC HEARING Lake Avalon Rural Settlement Commercial Design Overlay District March 10, 2009 Board of County Commissioners.
Community Development Department FUTURE LAND USE MAP AMENDMENT SMALL-SCALE LU-MIN & ZONING MAP AMENDMENT RZ-OTH
Board of County Commissioners PUBLIC HEARING September 1, 2009.
WEST BERKELEY PROJECT Master Use Permits (MUP) May 15, 2012 Response to Concerns & Issues.
Community Development Department GRAND HAVEN DEVELOPMENT OF REGIONAL IMPACT Planning & Land Development Regulation Board May 21, 2014.
Community Development Department FUTURE LAND USE MAP AMENDMENT SMALL-SCALE LU-MIN & ZONING MAP AMENDMENT RZ-OTH
Board of County Commissioners PUBLIC HEARING June 9, 2009.
Planning & Community Development Department Conditional Use Permit #5029 and Other Land Use Entitlements: Final Environmental Impact Report and Statement.
Community Development Department APPLICATION #2457 GRAND HAVEN PUD AMENDMENT APPLICATION #2411 GRAND HAVEN NORTH: SMALL SCALE FLUM AMENDMENT APPLICATION.
November 11, 2008 BCC PUBLIC HEARING ON BZA #SE , September 4, 2008 APPLICANT/APPELLANT: Christian Haitian Church, Inc.
DECEMBER 12, 2012 NEWPORT BEACH COUNTRY CLUB Application No.: Item: W 11a.
Community Development Department COUNTRY CLUB HARBOR SINGLE FAMILY RESIDENTIAL-2 AND PARKS & GREENWAYS ZONING DISTRICTS REZONING APPLICATION #2511.
Board of County Commissioners Lake Avalon Rural Settlement Commercial Design Overlay District February 24, 2009 Board of County Commissioners Lake Avalon.
Planning and Zoning Division Jefferson County RZREHARING To amend existing Planned Development zone district to allow for mini-warehouse storage.
“ Grand Landings North” Comprehensive Plan Amendment & Rezoning City Council Public Hearing March 3, 2015.
EASTSIDE ACTIVITY CENTER DRAFT MASTER PLAN Board of County Commissioners January 22, 2008.
Community Development Department FUTURE LAND USE MAP AMENDMENT LU-MIN & RZ-OTH
Planning and Zoning Division Jefferson County RZREHARING To amend existing Planned Development zone district to allow for mini-warehouse storage.
Lowe’s Parking Flexibility Application No. PK-FLX
City of Dunnellon Comprehensive Plan Amendment  Future Land Use Element  Conservation Element  Concurrency Management System.
Durham Villas Planned Unit Development TSM & REZ Morris Bud Keeney Butte County Board of Supervisors December 11, 2012.
Planning & Community Development Department Board of Zoning Appeals: Hillside Development Permit # Hillcrest Place City Council March 14, 2016.
APPEAL OF MCGUIRE RESIDENCES Tuesday, January28, 2014 City Council.
Prepared by: Alex Fisch Planning Services Division.
City and County of San Francisco Scoping Meeting Environmental Impact Report (EIR) PURPOSE To solicit participation in determining the scope.
“State Road 100 MPC Lots” Comprehensive Plan Amendment & Rezoning City Council Public Hearing November 17, 2015.
4650 Alhambra Circle Building Site Separation. Request: The applicant is requesting consideration of a building site separation in accordance with Section.
Community Development Department FUTURE LAND USE MAP AMENDMENT SMALL-SCALE LU-MIN-07-03a & ZONING MAP AMENDMENT RZ-OTH
Vista Verde Ranch Revised Draft Environmental Impact Report Vesting Tentative Tract & Oak Tree Permit Project Description :70 unit single.
ITEM 6.a AT GREEN BUILDING ORDINANCE City Council – August 25, 2009.
Small Town Service ~ Community Stewardship ~ Future Focus ALBRIGHT OFFICE PARK Planned Development PD Architecture and Site S Environmental.
Joint Public Hearing - Closed Redevelopment Agency & City Council Amended and Restated Redevelopment Plan for the North Stockton Redevelopment Project.
Environmental Scoping Meeting April 9, Meeting Outline Overview of the Proposed Project Purpose of the Scoping Meeting Environmental Review Process.
Planning Commission Meeting July 30, Presentation Outline  Project Purpose, Background and Schedule  Overview of Community Input  Overview of.
1 Gables Gateway. 2 1.Comprehensive Plan Text Amendment 2.Comprehensive Plan Map Amendment 3.Zoning Code Text Amendment 4.Change in Zoning 5.MXD3 Mixed.
1 Villa Laguna MXD3 Site Plan Review. 2 Request: The applicant is requesting site plan review of a proposed mixed-use project pursuant to the recently.
Washoe County Board of Adjustment
Scoping Meeting April 20th 6:00 pm
Robinson Park Recreation Center Renovation
Site Plan Control By-law
“Palm Coast 145, LLC” Comprehensive Plan Amendment & Rezoning Planning and Land Development Regulation Board December 21, 2016.
La Mesa Climate Action Plan Supplemental Environmental Impact Report Scoping Meeting May 31, 2017.
GRAND HAVEN DEVELOPMENT OF REGIONAL IMPACT – ESSENTIALLY BUILT OUT AGREEMENT City Council Workshop May 27, 2014.
Marina Del Palma Comprehensive Plan & Zoning Map Amendment
Palm Coast 145, LLC Comprehensive Plan Amendment & Rezoning City Council Public Hearing September 5, 2017.
Zoning Code Amendment - Emergency Shelters, Limited
LAFCO AND CEQA LAFCO Role as A Responsible Agency
WSUP The Club at ArrowCreek Grading
WSUP & WADMIN The Club at ArrowCreek
Washoe County Board of Adjustment
Board of County Commissioners
Camarillo Springs Project Draft EIR Scoping Meeting
Presentation transcript:

Butterfly Village (PLN080209) Monterey County RMA- Planning Director July 30, 2008

Existing Land Use

Current Application 1.A Determination of Conformance with the Rancho San Juan Specific Plan; and 2.An Administrative Project Amendment to the Combined Development Permit consisting of: a) Revised Vesting Tentative Subdivision Map; b) Amendments to the Use Permits for the wastewater treatment plant, development on 30% slopes and tree removals; and c) Rescission of the use permit for the golf course.

Review Process Conformance Determination - Section 8.13 of the Rancho San Juan Specific Plan establishes procedures to allow the County to determine whether a proposed development constitutes a minor variation from the Rancho San Juan Specific Plan provisions. Minor variations include interpretations to any provisions of the Specific Plan as well as additions, deletions and changes to the Specific Plan exhibits, appendices or text that substantially comply with the Specific Plan. Conformance Determination - Section 8.13 of the Rancho San Juan Specific Plan establishes procedures to allow the County to determine whether a proposed development constitutes a minor variation from the Rancho San Juan Specific Plan provisions. Minor variations include interpretations to any provisions of the Specific Plan as well as additions, deletions and changes to the Specific Plan exhibits, appendices or text that substantially comply with the Specific Plan. Administrative Project Amendment - Section of the Development Agreement between the County and HYH that establishes a procedure for an Administrative Project Amendment which may be approved by the RMA-Planning Director. Administrative Project Amendment - Section of the Development Agreement between the County and HYH that establishes a procedure for an Administrative Project Amendment which may be approved by the RMA-Planning Director.

Background September 27, 2002 – HYH filed CDP application for 1,147 units, 141 guest villas/timeshares, 45,000 sf commercial, 18-hole golf course, golf clubhouse, sewage treatment facility and 145 acres of parks and open space. September 27, 2002 – HYH filed CDP application for 1,147 units, 141 guest villas/timeshares, 45,000 sf commercial, 18-hole golf course, golf clubhouse, sewage treatment facility and 145 acres of parks and open space. December 14, 2004 – Board of Supervisors certified FEIR, adopted Rancho San Juan Specific Plan, and approved CDP and Development Agreement for Butterfly Village. December 14, 2004 – Board of Supervisors certified FEIR, adopted Rancho San Juan Specific Plan, and approved CDP and Development Agreement for Butterfly Village.

Background (con’t) November 7, 2005 – Board adopted Addendum #1, recinded Adopted Specific Plan and adopted Revised Specific Plan. November 7, 2005 – Board adopted Addendum #1, recinded Adopted Specific Plan and adopted Revised Specific Plan. April 8, 2008 – Board entered into “Settlement and Release Agreement” with HYH to settle litigation. April 8, 2008 – Board entered into “Settlement and Release Agreement” with HYH to settle litigation. May 2, HYH applied for an amendment to the Combined Development Permit. The amendment includes a revised Vesting Tentative Map; amendments to Use Permits for wastewater treatment facility, development on 30% slopes and tree removals; and rescission of the Use Permit for the golf course. May 2, HYH applied for an amendment to the Combined Development Permit. The amendment includes a revised Vesting Tentative Map; amendments to Use Permits for wastewater treatment facility, development on 30% slopes and tree removals; and rescission of the Use Permit for the golf course.

Revised Project 1) 1,147 residential units to be configured on not to exceed 780 single-family lots and not to exceed 20 multi-family residential lots on acres; 1) 1,147 residential units to be configured on not to exceed 780 single-family lots and not to exceed 20 multi-family residential lots on acres; 2) 71 hospitality units (visitor accommodation/ professional offices); 2) 71 hospitality units (visitor accommodation/ professional offices); 3) 20,000 square foot community health wellness center; 3) 20,000 square foot community health wellness center; 4) 90,000 square feet of commercial use, 4) 90,000 square feet of commercial use, 5) acres of dedicated parks and open space, including 11.8 acres of neighborhood parks, a acre Community Park, and a County Park of approximately 53.5 acres); 5) acres of dedicated parks and open space, including 11.8 acres of neighborhood parks, a acre Community Park, and a County Park of approximately 53.5 acres); 6) parking lot for park visitors; 6) parking lot for park visitors; 7) wastewater treatment facility (13.1 acres); 7) wastewater treatment facility (13.1 acres); 8) sheriff substation, park maintenance facility and 2,500 square foot library (7.3 acres); 8) sheriff substation, park maintenance facility and 2,500 square foot library (7.3 acres); 9) fire station (1.2 acres); 9) fire station (1.2 acres); 10) two water storage tanks (0.7 acre); and 10) two water storage tanks (0.7 acre); and 11) school site (10 acres). 11) school site (10 acres).

Comparison of Approved and Revised Project ApprovedRevised 1,147 homes (739 single-family units and 338 multi-family units) 1,147 homes (not to exceed 780 single- family lots and 20 multi-family lots) 338 affordable units (29% of 1,147 total) 367 affordable units (32%of 1,147 total) (65 Very low income, 71 Low income 93 Moderate income, 35 Workforce I and 103 Workforce II) 71 golf villas/timeshares71 hospitality units (visitor accommodation/professional offices) 18 hole golf course (201 acres)No golf course 11.8 acres of neighborhood parks acres of open space 153 acres of parks and open space 11.8 acres of neighborhood parks acre community park 53.5 acre County park * acres of parks and open space ** * Includes public hiking trails and recreation ** Includes acres of open space No parking lot for parksParking lot for County park (40 spaces)

Comparison of Approved and Revised Project (con’t) ApprovedRevised 20,000 sq. ft. golf clubhouse20,000 sq. ft. health, fitness and nutrition center 45,000 sq. ft. neighborhood commercial90,000 sq. ft. neighborhood commercial No school site10 acre school site acres (3.3% of property) of disturbed 30% slopes acres (2.2% of property) of disturbed 30% slopes (7.7 acres less) 4,900,000 cubic yards grading4,000,000 cubic yards grading 34 oak trees removed31 oak trees removed 488 AF/YR (435,388 gpd) - potable water demand 507 AF/YR (452,312 gpd) – potable water demand (16,924 net increase) 0.33 mgpd – wastewater treatment facility0.36 mgpd – wastewater treatment facility 272 jobs (presently 138 seasonal ag positions) 421 jobs

Conformance with Rancho San Juan Specific Plan The revised project is consistent with the provisions of the Rancho San Juan Specific Plan. The revised project is consistent with the provisions of the Rancho San Juan Specific Plan. Although there are variations from some of the provisions in the Specific Plan, the changes are minor in nature. Under the provisions of Section 8.13 of the Specific Plan, no amendments to the Specific Plan are required. Although there are variations from some of the provisions in the Specific Plan, the changes are minor in nature. Under the provisions of Section 8.13 of the Specific Plan, no amendments to the Specific Plan are required.

Approved Land Use Plan

Open Space, Parks and Trail System

Looking West

Looking East

Looking North

Looking South

CEQA Findings for Addendum There have been no substantial changes to the project which will require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified effects; No substantial changes occured with respect to the circumstances under which the project is undertaken which require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; and The purpose of the EIR Addendum is to evaluate the effects of the changes to the adopted Specific Plan to determine if the CEQA Guidelines require preparation of a supplemental or subsequent EIR because any of the following conditions apply:

CEQA Findings (cont.) No new information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete, shows any of the following: No new information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete, shows any of the following: The project will have one or more significant effects not discussed in the previous EIR; The project will have one or more significant effects not discussed in the previous EIR; Significant effects previously examined will be substantially more severe than shown in the previous EIR; Significant effects previously examined will be substantially more severe than shown in the previous EIR; Mitigation measures or alternatives previously found not to be feasible would in fact be feasible, and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative; or Mitigation measures or alternatives previously found not to be feasible would in fact be feasible, and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative; or Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure or alternative. Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure or alternative.

ADDENDUM CONCLUSIONS RESOURCE IMPACTS NO INCREASE IN IMPACTS IDENTIFIED IN THE EIR OR ADDENDUM #1 ELIMINATION OF THE GOLF RESULTED IN NET BENEFITS WITH RESPECT TO : AMOUNT OF GRADING ( LANDFORM ALTERNATION) (AESTHETICS) REDUCTION IN ACREAGE OF WETLANDS AND OTHER HABITAT IMPACTS, NATURAL DRAINAGE COURSES REDUCTION IN NUMBER OF LANDMARK OAKS TO BE REMOVED REDUCTION IN THE USE OF PESTICIDES REDUCTION IN NOISE FROM COMMERCIAL INTERFACE WITH RESIDENTIAL USES ( NOISE) ( LIGHTING) REDUCTION IN AIR QUALITY IMPACTS DURING CONSTRUCTION 220 FEWER VEHICLE TRIPS PER DAY

MODIFICATIONS TO CONDITIONS/MITIGATION MEASURES PRIMARY CHANGES WERE TO CONDITIONS THAT REFERENCED THE GOLF COURSE. THESE WERE CHANGE TO ADDRESS THE PARKS AND PARK USES. SEE CONDITIONS 227, 227 a and b PRIMARY CHANGES WERE TO CONDITIONS THAT REFERENCED THE GOLF COURSE. THESE WERE CHANGE TO ADDRESS THE PARKS AND PARK USES. SEE CONDITIONS 227, 227 a and b ADDITIONAL CONDITIONS PERTAINING TO THE LIBRARY, SCHOOL SITE, CONFIGURATION OF LOTS, INCREASE IN AFFORDABLE HOUSING, ADDITIONAL COMMERCIAL ACREAGE ADDITIONAL CONDITIONS PERTAINING TO THE LIBRARY, SCHOOL SITE, CONFIGURATION OF LOTS, INCREASE IN AFFORDABLE HOUSING, ADDITIONAL COMMERCIAL ACREAGE REDUNDANT CONDITIONS REDUNDANT CONDITIONS

Recommended Actions 1. Adopt EIR Addendum #2 supplementing Addendum #1 and the Final Program Environmental Impact Report for the Rancho San Juan Specific Plan and the Butterfly Village Project; 2. Approve a Conformance Determination pursuant to Section 8.13 of the Revised Rancho San Juan Specific Plan; 3. Approve an Administrative Project Amendment to the Combined Development Permit consisting of: 1) Revised Vesting Tentative Map; 2) amendments to the Use Permits for the wastewater treatment plant, development on 30% slopes and tree removals; and 3) rescission of the use permit for the golf course; and 4. Adopt the Mitigation Monitoring and Reporting Plan.

Butterfly Village (PLN080209) Monterey County RMA- Planning Director July 30, 2008

ADDITIONAL MAPS

Revised Land Use Plan

Adopted Specific Plan