San Juan Greenway WJI PRODUCTIONS Cycling and Walking Centennial Trails Project
Overview Map of San Juan Greenway Arbutus Cove Blenkinsop Lake East Section
Overview ➲ Hiking, Cycling and Walking – and cars! ➲ Route Starts at Arbutus Cove in Saanich ➲ 3.5km Route Follows San Juan Avenue ➲ Route Ends at Glendenning Road
Needs More Painted Road Signs Currently, there are only 13 Painted Road signs All 13 paints are in the first one kilometre of the 3.5km greenway West of Tyndall Avenue, for 2.5km, there are no roadway paints
West of Tyndall Ave is a park
West of Tyndall Avenue
Long-term Goals ➲ The desired goal is Safety for Users ➲ Define Cycling Lanes ➲ Road Markings to Inform Drivers
Columbia Drive Access Trail VIEWED NORTH
Several North/South Roads to Cross Majestic Drive
The Present Situation ➲ “Greenway” is a misnomer ➲ The Route Simply Follows Roads ➲ This Route Needs Safety Improvements for Cyclists
Shelbourne Street Crossing This Major Intersection Needs a Crossing Light Note there are two lanes of traffic here: Both Northbound & Southbound Lanes
All The Cyclist Gets for Safety is a Few Roadside Signs “SHARE THE ROAD” This one Reads: Elnido Road
Cedar Hill Road Crossing
Harvest Lane Improvements Between Harvest Lane & Parkside Crescent
Winchester Between Parkside & Glendenning
Mt. Douglas Parking Lot Glendenning Trailhead to San Juan Greenway Glendenning Road Connects the San Juan Greenway to the Blenkinsop Greenway.... it too is a road with no provisions for cyclists
Map to Blenkinsop Greenway
Potential Alternatives ➲ Bicycle lanes should be added ➲ On-street parking should be curtailed ➲ Additional Painted Roadway Signs
Blenkinsop Greenway to Lochside The Lochside Trail connects to the Galloping Goose Trail in another 3km southbound
THE END ➲ Thank you for considering this matter