Murrieta Creek Flood Control, Environmental Restoration and Recreation Project.

Slides:



Advertisements
Similar presentations
Roger Williams Park Ponds Restoration Project. Project Update Concept Plans Developed for Structural and Non- Structural Best Management Practices Draft.
Advertisements

Essex Region Conservation Authority Brad Arsenault & Kaylyn Boyd.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Watershed Dams in Georgia 1. –357 Total –195 High Hazard (NRCS) –NRCS constructed – owned by local sponsors –Most built between 1950s-1970s for flood.
Don Edwards San Francisco Bay National Wildlife Refuge Where Wildlife Comes First!
2010 Squak Valley Park Restoration Project City of Issaquah.
Watershed Update, Kahler, ECF, 6/26/2014. The Kahler Challenge.
Federal Realty Investment Trust (FRIT) Eastgate Shopping Center Chapel Hill, NC September 9, 2008.
Clarence Cannon Dam and Mark Twain Lake Flood Control – damage reduction Navigation Hydropower Recreation Water supply Fish and Wildlife Conservation.
California Integrated Waste Management Board 1 Permitting and Compliance Committee Agenda Item F (Board Item 5) September 8, 2009 Permitting and Compliance.
NCTCOG Sustainable Development Call for Projects Interlocal Cooperative Agreement Reporting Form Reimbursement Phase 2 5/24/20151 This portion.
RECREATIONAL TRAILS PROGRAM MAUREEN NEIGHBORS, COMMUNITY SERVICES UNIT CHIEF CRYSTAL DAVIS, RECREATION AND CONSERVATION PROGRAMS MANAGER.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
County & Regional Context State Parks & Urban Open Space Federal and National Parks - city to wildland social issues of St. Edward park.
CITY COUNCIL WORKSHOP MULTIPLE SPECIES HABITAT CONSERVATION PLAN (MSHCP) DECEMBER 20, 2011.
Grand Canalscape Phase I: Phoenix Uptown and Gateway North Update Kerry Wilcoxon City of Phoenix Street Transportation Department Safety and Neighborhood.
Bureau of Recreation and Conservation The Community Conservation Partnerships Program Presented by: Don Gephart, Recreation and Park Advisor Southeast.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
Location: East of the Visitor Center and Scenic Loop on Calico Basin Length: ½ mile round trip Difficulty: Easy; wheelchair accessible Estimated Minimum.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Land Use Study for the Community of Winchester July 9, 2012.
Project Funding Workshop Lynn Boerman, IDNR June 22, 2011.
Sears Point ACEC: SEZ Regional Mitigation Site Thomas Jones Asst. Field Manager Bureau of Land Management Yuma Field Office November 14, 2014.
May 27 th, 2003FRCV Conservation Plan Summary and Status Rock Creek Valley Conservation Plan & Priorities Prepared by Friends of Rock Creek Valley with.
Preliminary Development Plan – Continuation of August 28, 2012 BoCC Hearing Board of County Commissioners September 18, 2012.
Planning and Design in Rockford: West State Street Corridor Overview 315 North Main Street · Rockford IL
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Tunnel Springs Rail Trail. Tunnel Springs Rail Trail is located in North Monroe County connecting Tunnel Springs to Beatrice, Alabama. The Trail is geographically.
Phase 2: 30% Design Plans September 4 th, 2012.
Riverside County Flood Control and Water Conservation District Murrieta Creek Flood Control, Environmental Restoration and Recreation Project June 2006.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Roseau River Flood Damage Reduction Project Roseau, Minnesota.
County & Regional Context State Parks & Urban Open Space Federal and National Parks - city to wildland social issues of St. Edward park.
1.Look at the pieces of the picture. 2.Can you guess what is in the picture?
WRAC Acme Basin B Discharge Project February 2, 2006.
Central & Southern Florida Project George Horne Deputy Executive Director Operations & Maintenance Resource Area.
Mason’s Stormwater Utility Program Kathleen Wade-Dorman, P.E. City of Mason.
Field Study: Cove Trail at the Home of Franklin D. Roosevelt, Hyde Park, NY Avery Cross Cove Trail is part of the Roosevelt Woods Trail (Hike F), which.
Pierce Butler Lexington Parkway Bicycle Connection Presented by: Mr. Michael Recycles Bicycles Sponsored by: Mr. Michael Recycles Bicycles District 11.
Murrieta Creek Flood Control, Environmental Restoration and Recreation Project 2006 Fall Project Tour with Congresswoman Mary Bono Group Photo – Left to.
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
Boise River Park, Greenbelt & Economic Impact of Parks Tom Governale, Superintendent of Parks.
COMMUNITY | PUBLIC SAFETY | RECREATION | EDUCATION | URBAN | LOCAL Jerry Michael, PE, LS Principal, RRM Design Group Thinking Outside the Pipe.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Land & Resource Management. Why do we have protected lands?
Office of Real Estate 2045 Morse Road E2 Columbus Ohio /9/2016.
Chatham County Parks and Recreation. Special Events Annual Easter Egg Hunt Annual Easter Egg Hunt Family Fun Day Family Fun Day Music in the Park Music.
May 18, 2004 City Bond Election. MAY 2004 BOND ELECTION General Election May 18, 2004 Elections City Mayoral Election City Council Election City Bond.
Chapel Hill Parks and Recreation. “Networks of natural spaces which provide corridors connecting areas such as neighborhoods, parks, and schools.
Introductions U.S. Army Corps of Engineers Metro Parks Mayor’s Office Metro Council District Representatives HDR, Inc.
Introduction U.S. Army Corps of Engineers Metro Parks Mayor’s Office Metro Council District Representatives HDR, Inc.
TIF 9 (Trinity River Vision) Expansion and Updated Project and Financing Plans Jay Chapa, Director Housing and Economic Development.
Lower Merion Township Parks & Recreation Plan Implementation Plan.
2035 General Plan Update Joint Study Session on Draft Conservation Element Planning Commission and Parks & Recreation Commission December 1, 2015.
Why the Need for Increased Stormwater Funding? Citizens expect a higher level of protection from flooding Increased development.
FY 2016 – 2017 BUDGET OVERVIEW Forest Preserve District of DuPage County.
1 TIF 9 (Trinity River Vision) Expanded and Updated Project and Financing Plans December 8, 2009 Presented to the City Council Jay Chapa Housing & Economic.
Village of Villa Park October 24, 2016 Washington Street Combined Sewer Separation Project.
WHAT ARE THEY AND WHY ARE THEY IMPORTANT?
Continuing Authorities Program
Sample Eastern Sustainable Development Project
Concept Plan for Proposed Park Near Hopewell School
Texas Department of Transportation
Transportation Alternatives (TA) Set-aside
Measure A Financial Oversight Committee August 7, 2013
Construction Management & Inspection
SANDY SPRINGS CITY COUNCIL MEETING
Creating and Managing Watershed Stewardship Programs Session 5
Federal-aid Highway Program
National Organization of Minority Engineers Leadership Summit
Presentation transcript:

Murrieta Creek Flood Control, Environmental Restoration and Recreation Project

RIVERSIDE COUNTY FLOOD CONTROL & WATER CONSERVATION DISTRICT DUSTY WILLIAMS General Manager-Chief Engineer

Murrieta Creek Flood Control, Environmental Restoration and Recreation Project uProject Overview uFlooding History uProject Description uProject Cost

Project Overview uPublic Safety- 100-year flood protection for over 600 homes and commercial structures uEnvironmental Restoration- Includes a 163 acre restoration site within the detention basin. Establishment of a 7- mile permanent habitat corridor uRecreation- Regional Sports Park & trail system

Murrieta Creek Flood Control, Environmental Restoration and Recreation Project uProject Overview uLocation

Murrieta Creek Phase 1 at First St.

Murrieta Creek Phase 2

Phase 3: Detention Basin Site

Murrieta Creek: Elm to Tenaja- Phase 4

Murrieta Creek near Ivy St. (Phase 4)

zOverall map

Murrieta Creek Flood Control, Environmental Restoration and Recreation Project uProject Overview uFlooding History uMajor Events in 1938 and 1969 uPresidential Disaster Declarations in 1980, 1993, 1995 and 1998 u1993: $12 million damages in Temecula & Murrieta $88 million in damages to Camp Pendleton

Murrieta Creek Flood Control, Environmental Restoration and Recreation Project uProject Description uProject Overview uFlooding History

Murrieta Creek Flood Control, Environmental Restoration and Recreation Project uFlood Control uEnvironmental Restoration uRecreation uElements

Murrieta Creek Flood Control, Environmental Restoration and Recreation Project uElements uFlood Control

Flood Control Element uPublic Safety- 100-year flood protection for over 600 homes and commercial structures uPublic Health - Protection of regional waste water treatment plant. uNational Security - Reduction to potential flood damages to Camp Pendleton.

uChannel cross sections

Existing Condition and Proposed Design at “B” Street

Murrieta Creek Flood Control, Environmental Restoration and Recreation Project uEnvironmental Restoration uElements uFlood Control

Environmental Restoration Element  Environmental Restoration- Includes a 163 acre restoration site within the detention basin. z Establishment of a 7-mile permanent habitat corridor.

Phase 3: Detention Basin Site

zDetention Basin Site zRestoration Area Highlighted. Restoration Area Elm Street Cherry Street Jefferson Avenue Santa Gertrudis Creek Warm Springs Creek

Murrieta Creek Flood Control, Environmental Restoration and Recreation Project uRecreation uSports Park uElements uFlood Control uEnvironmental Restoration

zVertical Picture of Basin Site w/ Recreation Area Highlighted. Public Park Cherry Street Jefferson Avenue Santa Gertrudis Creek Warm Springs Creek

zBasin Site w/ Restoration and Recreation Areas Depicted. Public Park Restoration AreaSedimentation Basin Meandering Streams Pond Equestrian Trail Bicycle Trail Pedestrian - Bicycle Bridges Parking Lot

Recreation Element - Sports Park z50-Acre Regional Sports Park within 240-acre detention basin site at Jefferson & Cherry. zFour official soccer fields zA minimum of four baseball / softball fields. zA large tot lot. zGroup picnic facilities. zRestroom / snack bar facility. zParking for approximately 360 vehicles. zAmple trees and landscaping.

Murrieta Creek Flood Control, Environmental Restoration and Recreation Project uFlood Control uEnvironmental Restoration uRecreation uSports Park uElements  Trails Bicycle Equestrian/Hiking

Recreation Element - Trails u7+ mile long trail system for equestrians, bicycling and hiking will be built along the entire length of the project. uPocket parks / staging areas for trail users uDip crossings for trails at all bridges for user safety. uParks and trails will be operated with the cooperation of local citizen ‘sponsors’.

Murrieta Creek Flood Control, Environmental Restoration and Recreation Project uProject Cost uProject Overview uFlooding History uProject Description

Murrieta Creek Flood Control, Environmental Restoration and Recreation Project uTotal Cost - $90 million uCost Sharing Authorized by Congress u65% Federal Share ($60 million) u35% Local Share ($30 million) uProject Cost

Local Costs uReal Estate uDisposal of material uGuava Street Bridge uIvy Street Bridge uUtilities uRecreation uMain Street Bridge u5% Cash uTOTAL $12,298,000 $9,102,428 $5,431,034 $3,606,364 $2,916,958 $2,250,000 $2,566,648 $3,001,971 $41,173,403

Murrieta Creek Flood Control, Environmental Restoration and Recreation Project uProject Overview uBuilt from Shell Station to Tenaja uFour Phases uFlooding History u1980 and 1993 uProject Description uFlood Control uEnvironmental Restoration uRecreation uProject Cost uTotal Cost = $90 million uLocal Share = $41 million SUMMARY

Murrieta Creek Flood Control, Environmental Restoration and Recreation Project uWHEN? u Phase 1 Construction Start - September 2003 u Phase 2 - Fall 2004 u Phase u Phase

Thank You