W. BentzEMBA 8021 Agenda for October 27, 1999 Comments on Copeland Wellesley Paint Co. Case On measuring capacity Standards for Toledo Tool.

Slides:



Advertisements
Similar presentations
Quantitative Techniques An Introduction
Advertisements

Management: Analysis and Decision Making
Inventory Costing and Capacity Analysis
Standard Costing and Variance Analysis
Cost Accounting Horngreen, Datar, Foster Flexible Budgets, Variances, and Management Control: I Session 7.
Chapter 9 BUDGETING A budget is a formal written statement of management’s plans for a specified future time period, expressed in financial terms Control.
Overall Framework Decision Making (Unit 2) -CVP -Special Orders -Make or Buy -Capital Investments Cost Accumulation Systems (Unit 1) Corporate Strategy.
BUSINESS PLANS MARKETING YOURSELF. MARKETING Defines your product Defines your product Defines groups most likely to use product Defines groups most likely.
Managerial Accounting An Overview. Role in Decision-Making  Provides economic and financial information to management  Focus on resources, costs, profit.
The Islamic University –Gaza
Activity Based Costing By Jan Van Deusen Larry Inguagiato.
The Strategic Role of Information in Sales Management
Budgeting According to hotel management consultant Kirby Payne, ‘Managing expenses is among the most important things a manager does. (I never say it.
Introduction to Cost management
C H A P T E R 9 Evaluating Personnel and Divisions.
13 Management Control Systems, The Balanced Scorecard, and Responsibility Accounting.
Forecasting and Budgeting
1 PowerPointPresentation by PowerPoint Presentation by Gail B. Wright Professor Emeritus of Accounting Bryant University MANAGERIAL ACCOUNTING 10 TH EDITION.
Operations Planning Horizons
The Master Budget and Flexible Budgeting
MANUFACTURING COMPANY: COST-VOLUME-PROFIT PLANNING AND ANALYSIS
Chapter JOB-ORDER COSTING Chapter 4 Accounting Principles II AC Fall Semester, 1999.
Financial Assessment and
McGraw-Hill/Irwin Copyright 2006 by The McGraw-Hill Companies, Inc.
Full Costs and Their Uses
Introduction to Business 3e 9 Part III: Management Copyright © 2004 South-Western. All rights reserved. Improving Productivity and Quality.
1 The budgeting process The traditional goals of the planning and control process are: - to identify the economic goals and how to achieve them - to measure.
1 Profit and Cost Center Performance Evaluation CHAPTER 10 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in.
Chapter 23 Flexible Budgets and Standard Cost Systems
Managerial Accounting UMST-MBA-BATCH 8
Chapter 2 Introduction to Cost Management Systems.
So What? Operations Management EMBA Summer TARGET You are, aspire to be, or need to communicate with an executive that does not have direct responsibility.
Cost accounting concepts and objectives Usually there are three management levels The operating management The middle management The executive management.
Delmar Learning Copyright © 2003 Delmar Learning, a Thomson Learning company Nursing Leadership & Management Patricia Kelly-Heidenthal
1 Unit 1 Information for management. 2 Introduction Decision-making is the primary role of the management function. The manager’s decision will depend.
3.06 Manage financial resources to ensure solvency 3.00 Understand product/service management, emotional intelligence, financial analysis, selling and.
Principles of Cost Accounting 15 th edition Edward J. VanDerbeck © 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated,
C h a p t e r 20 GLOSSARYGLOSSARY EXIT Glossary Modern Management, 9 th edition Click on terms for definitions Break-even analysis Break-even point Budget.
Module 14 Cost Behavior, Activity Analysis, and Cost Estimation.
MSE608C – Engineering and Financial Cost Analysis Managerial Accounting.
W. BentzEMBA 8021 Agenda Today Points regarding the practice questions Update regarding the final input Quiz Overview of product control system variances.
Evaluating Ongoing Programs: A Chronological Perspective to Include Performance Measurement Summarized from Berk & Rossi’s Thinking About Program Evaluation,
Managerial Accounting: An Introduction To Concepts, Methods, And Uses
W. BentzEMBA 8021 Agenda Today Review some chapter 12 ideas Outline transfer pricing issues Go over EVA case Outsource, Inc.
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e Slides prepared by Kim Langfield-Smith.
CPS ® and CAP ® Examination Review MANAGEMENT, Fifth Edition By Haney and Mazzola ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River,
14-1 CHAPTER 14 McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved. Cost Analysis for Planning.
W. BentzA&MIS 5251 Agenda – Session19 Go over Devon Companies Outline transfer pricing issues Go over HFD C22 P20 Review Artic Delights and CDE Co.
A Guide for Management. Overview Benefits of entity-level controls Nature of entity-level controls Types of entity-level controls, control objectives,
FINANCE MODULE. The various subsystems Financial Accounting Investment management Controlling Treasury Enterprise controlling.
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e Slides prepared by Kim Langfield-Smith.
Needles Powers Crosson Principles of Accounting 12e The Budgeting Process 22 C H A P T E R ©human/iStockphoto.
Lesson 2 Functions of Business Unit 1. Although we come into contact with business regularly, we often do not think about what goes on behind the scenes.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Chapter 23 Flexible Budgets and Standard Cost Systems.
Folie 1 Sarajevo, October 2009 Stefan Friedrichs Managing Partner Public One // Governance Consulting Project Management in the Public Sector Monitoring.
Budgeting and financial management
Chapter 3: Cost Estimation Techniques
Chapter 3: Cost Estimation Techniques
Cost Accounting and Reporting Systems
MANAGEMENT AND COST ACCOUNTING
Master Budgeting.
Chapter 3: Cost Estimation Techniques
Dr.S.S.Jadhav Cost Accounting.
Chapter 3: Cost Estimation Techniques
The Master Budget and Flexible Budgeting
Cost-Volume-Profit Analysis
Chapter 6 The Master Budget and Responsibility accounting
Financial Management Budget = financial plan used to forecast needs, allocate resources, and track progress set goals and objectives record what is accomplished.
Chapter 3: Cost Estimation Techniques
Presentation transcript:

W. BentzEMBA 8021 Agenda for October 27, 1999 Comments on Copeland Wellesley Paint Co. Case On measuring capacity Standards for Toledo Tool

W. BentzEMBA 8022 Standard “That which is established by authority, custom, or general consent, as a model or example; criterion; test; in general, a definite level, degree, material, character, quality, or the like, viewed as that which is proper and adequate for a given purpose.”

W. BentzEMBA 8023 Standard “In business, a carefully thought-out method of performing a task, a carefully drawn specification covering material or equipment.” Webster’s New International Dictionary

W. BentzEMBA 8024 Relevance to Standard Costs These dictionary definitions are quite consistent with the salient features of a standard costing system. An important point is to remember that costing systems exist within a management structure, not as independent entities.

W. BentzEMBA 8025 Context Standard costs reflect a comprehensive plan of managing in which studies are used to predetermine the desired magnitude of every expense, performance is compared with these standards, and attention is focused on variances. For simplicity and clarity, performance is expressed in dollars.

W. BentzEMBA 8026 The management cycle Evaluate Plan By identifying important variances from plan--sliced & diced--one can zero in on significant variances. Plan OperateEvaluate

W. BentzEMBA 8027 Objective In developing standard cost systems, the objective is to determine what should be the material, labor and support activity costs of activities, operations, products, and services. The process begins with activity costs.

W. BentzEMBA 8028 Overview of Uses The major uses of standard costs include: –Information for decision-making –Control of costs –Performance measurement –Projection of financial consequences

W. BentzEMBA 8029 Info. for Decision-making C-V-P analysis Product-mix and special-order decisions Pricing and bidding are facilitated by the availability of a file of contemporary standards from which estimates can be developed Outsourcing decisions

W. BentzEMBA Cost Control Standard cost represent desired levels of cost per unit of activity, product or service at the level of operations. Standard costs communicate cost targets for people to use as reference points in their efforts to control costs.

W. BentzEMBA Cost Control vs. Reduction Cost reduction arises from changes in the product, inputs, production processes, or support activities that lead to a reduction in the costs expected. A new cost level is achieved because the cost environment has improved.

W. BentzEMBA Cost Control Cost control, on the other hand, takes place within a production context as it now exists. The objective is to achieve the level of efficiency and cost that is inherent in current operations, inputs, etc. Control means achievement of plan.

W. BentzEMBA Performance Measurement Price and quantity standards represent plans concerning desired cost efficiency under specified conditions. As plans, standards define and communicate to associates the performance expected.

W. BentzEMBA Performance Measurement II Standards serve as benchmarks for use in evaluating relative performance in terms of both efficiency and productivity. Standards help decompose any differences between actual and standard cost by entity, product, activity, territory, market, or responsible party.

W. BentzEMBA Performance Measurement III Performance Measurement III Standard costs facilitate the decomposition of differences between actual and planned costs by nature of the effect: price, quantity, yield, or mix.

W. BentzEMBA Profit Planning The cost information reflected in standards is useful for –Pro-forma financial statements –Cost budgets –Cash budgets –Purchase budgets –Integrated profit plans

W. BentzEMBA Account Structure Integration Standard cost systems can be an integral component of the financial accounting structure, or they can be “off-line,” and independent of the formal account structure. Modern enterprise systems integrate costing systems to better facilitate the full range of benefits of having standards.

W. BentzEMBA Outline of an On-line System Predetermined standard costs are set for each item of expense for each activity Materials and labor are charged to production at standard cost Work-in-process and Finished Goods are priced at standard cost

W. BentzEMBA Outline of an On-line System Variances of actual cost from standard cost are recorded for each element of expense by activity Costs can be tracked by cost centers (responsibility centers) Costs can be monitored by expense category, i.e. direct labor Costs can be monitored by activity or activity type

W. BentzEMBA 80220

W. BentzEMBA One can compare expense categories across cost centers.

W. BentzEMBA Drill-down Sequences Company costs  factory costs  cost center costs  activity costs  activity cost elements  transactions Company variances  factory variances  cost center variances  activity variances  activity cost element variances

W. BentzEMBA Variances in Dollars Reporting variances in dollars is a way to determine the relative importance of diverse variances, and to combine the variances by activity, product, responsible manager, or performance entity. Adding the effects of physical measures would be nonsensical.

W. BentzEMBA What is normal costing? Normal costing refers to the allocation of support costs to production activities based on the level of driver activity volume that is forecast for one or more fiscal years.

W. BentzEMBA Why Normal Costing Represents an attempt to determine the basic cost of making products, excluding seasonal and other transitory effects on cost or volume.

W. BentzEMBA Why Normal Costing A key issue is to isolate the effect of volume changes on unit costs when costs are in line with budget, but volumes differ from projections. This discussion focuses on the volume issues, not cost issues.

W. BentzEMBA Normal Costing Normal activity cost rate = Cost of providing capacity A measure of activity level Issues to resolve: –What measure of capacity –The costs to be included in the “regular” cost of providing capacity.

W. BentzEMBA What Measure of Capacity The issues is to decide the desired level of capacity at which one would consider the level of capacity that must be provided for the production of goods and services with uncertain demand.

W. BentzEMBA What Utilization Rate? Even if the committed resources in the form of facilities and skilled personnel are known for the period, we still have some choices. We still must decide what level of facility utilization to use to calculate support activity rates.

W. BentzEMBA Causes of Unutilized Capacity Errors in predicting demand Long lead times that make forecasting difficult Regulation and capacity regulation (hospitals) Actions of competitors

W. BentzEMBA Break for it!