THE ECONOMICS OF LOW IMPACT STORMWATER MANAGEMENT GLENCOURT PLACE Éva-Terézia Vesely Jan Heijs Chris Stumbles David Kettle.

Slides:



Advertisements
Similar presentations
Presentation by Tina1 INTERNATIONAL INVESTMENT ANALYSIS Presentation by Tina.
Advertisements

Joint Defra/EA FCERM R&D Programme: Strategy and Policy Development Theme overview.
AQUAREC Project Centre for Water Systems AQUAREC Project Centre for Water Systems D. Joksimovic.
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
DRAFT SUSTAINABLE COMMUNITIES CLIMATE ADAPTATION GUIDEBOOK Kate Marshall, SRA International, Inc. (703) ,
Residual Service Life Prediction for Building Infrastructure Principal Investigator: Ashish Shah This presentation will probably involve audience discussion,
UK WIR The UK Experience Christopher Royce Anglian Water Services.
Chapter 14 Assessing the Value of IT. Traditional Financial Approaches  ROI – Return on Investments Each area is considered an investment center ROI.
Chapter 3 Asset Management. 2 Asset management Asset management = infrastructure management Infrastructure management = Capital management = Asset management.
Cost Analysis of Military Training Marcel C. Smit SAS-095 workshop on Cost-Benefit Analysis of Military Training Amsterdam, The Netherlands 5-6 June 2012.
Sustainability and Total Cost of Ownership Strategies for Higher Education.
 To conserve our remaining natural resources for future generations  To protect a valuable economic revenue stream  To organize management efforts.
WASTEWATER – Exploring the options Module 5 of the SWITCH Training kit.
IWRM as a Tool for Adaptation to Climate Change
RTI,Chennai Learning Objective Given the concepts of Decision Analysis, Option Pricing and Investment Decisions, the trainee will be able to audit the.
PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova.
Integrating LID Into the Development Planning Process.
Managing Risks During Tendering and Contract Procurement Tanya Jackson, Principal Consultant.
Morphum Environmental Ltd Environmental Engineers and Consultants
Water Framework Directive – Coastal issues Will Akast Catchment Delivery Manager-Suffolk.
Confidencial © 2011 TECNALIA 1 TECNALIA. 2 Tecnalia R&I 1st. Research and Technology Organisation in Spain and 5th. in Europe.
Partnership for Urban South Hampshire Sustainable Growth.
Financial Sustainability of Water, Waste Water, and Watershed Management THE TOOLS OF THE TRADE.
Costing Low Impact Stormwater Devices Éva-Terézia Vesely Michael Krausse André Taylor Earl Shaver Institute for Sustainable Water Resources.
Interim Headwater Drainage Feature Guideline: Protecting HDFs through Urbanization Laura C.R. Del Giudice, B.Sc., M.F.C., Senior Planning Ecologist.
Overview of SUDS research at the Urban Pollution Research Centre and Flood Hazard Research Centre, Middlesex University DayWater: EU FP5; Sustainable stormwater.
Economic challenges of wastewater treatment and use in agriculture Javier Mateo-Sagasta, FAO Pay Drechsel, IWMI.
Sustainable Development and Local Government Ann Magee Chair LGNZ Sustainable Development Project Team 17 June 2005.
David Edgerton FCPA Director Quality + Expertise + Flexibility + Innovation = Confidence & Real Value Asset Managers Network Strategic Asset.
Agricultural water use in New Zealand: should more be done to balance private property rights with greater public interest in an increasingly scarce resource?
Stormwater Retrofitting: The Art of Opportunity Prepared by the Center for Watershed Protection.
DECISION-SUPPORT TOOLS – Choosing a sustainable path Module 6 of the SWITCH Training kit.
Agricultural Headwater Streams and Restoration Opportunities Bradley Wright Bradley Wright City of Ottawa City of Ottawa February 25, 2011.
1 The Use of Institutional Controls Under the RCRA Corrective Action Program.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Laguna Creek Watershed Council Development of the Laguna Creek Watershed Management Action Plan & It’s Relevance to the Elk Grove Drainage Master Planning.
Economic challenges of wastewater treatment and use in agriculture Javier Mateo-Sagasta, FAO Pay Drechsel, IWMI.
© Michel Roggo / WWF-Canon Danube Region Strategy Conference, 04 March 2011, Budapest Danube Region Strategy – nature conservation aspects Gábor Figeczky,
Life-cycle cost analysis (LCCA)
Rookery South Resource Recovery Facility (RRF) Evolving List of Documents being prepared for submission to the Infrastructure Planning Commission Administration.
The new EC impact assessment: what for? EUROPEAN TRADE UNION CONFEDERATION Sophie Dupressoir.
1 GEORGIAN EXPERIENCE – and Strategy for Future DAVID NAKANI Environmental Pollution Control Program DAREJAN KAPANADZE World Bank Office Tbilisi Georgia.
Watershed Stewardship Program Status of Marin County Public Works Watershed Program 11/7/08 11/7/08.
1 Program For Results Financing OP/BP 9.00 Agi Kiss WB Safeguards Training Workshop Almaty, December 2012.
STORMWATER – Exploring the options Module 4 of the SWITCH Training kit.
TRAP 5 th interregional meeting & Site Visits Limerick & Lough Derg, Ireland 9 th October 2013 CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional.
Energy System Investment and Risk Management Unit 2A: Energy Economics and Markets Paul Rowley 1, Simon Watson 1 and Andy Williams 2 1 CREST & 2 Wolfson.
Changing Contexts for Waste Water Treatment and Solid Waste Management.
Planning Riparian Buffer Practices in FY16 Rachel Maggi NRCS West Area Biologist.
Objectives..describe and explain hard and soft flood prevention strategies Page GCSE Geography AQA A.
Public Participation in the SEA of Master Plan of Yerevan City in Armenia Sona Ayvazyan, Team Leader UNDP Pilot SEA Project as the Capacity Building Tool.
Source: Stream Corridor Restoration Manual WATERSHED MANAGEMENT.
David Edgerton FCPA Director Quality + Expertise + Flexibility + Innovation = Confidence & Real Value Strategic Asset Management: Issues, Challenges.
Danube Water Conference 2017, Vienna
Chap 6 MAINTENANCE & LIFE CYCLE COST
Validating Integrated Assessment Framework
EWG Study Tour, Galway, 18/09/2006
Toronto Waterfront Scan and Environmental Improvement Strategy Project - Economic Opportunity in a Sustainable Waterfront Presentation to the Federation.
BUS662 SMALL BUSINESS CONCEPTUAL ISSUES. Learning Outcome: To conduct environmental analysis and thereby analyse requirements of a strategic Chapter 3:
Overcoming uncertainties and barriers to Blue-Green infrastructure
CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional Authority
Selecting the Level of Involvement
The economic costs and benefits of the pNRP stream piping provisions Before the Hearing Stream 5 Panel Dave Grimmond.
Assessing Vulnerability & Climate Change Impacts
River Basin Planning & Flood Risk Management in Scotland
Franchise Agreements: An Opportunity to Promote Clean Energy in Illinois Alexis Cain USEPA, Region 5.
Welcome to the Stormwater & Sustainability Branch
Event: Flood Community of Practice workshop - Brisbane
Scottish Government Responsible for environment & flooding issues
Changes and barriers on the path to water-sensitive cities in Israel
Presentation transcript:

THE ECONOMICS OF LOW IMPACT STORMWATER MANAGEMENT GLENCOURT PLACE Éva-Terézia Vesely Jan Heijs Chris Stumbles David Kettle

In this presentation … Context – Background information Methodology – LCC Results Discussion

Urban Stream Health Compromising factors: Modified flow Poor water quality Lack of physical habitat Lack of riparian vegetation Barriers to migration of fish and other biota Exotic plants and animals Channelisation, erosion and sedimentation

Framework for Stream Restoration Low impact urban design approaches that reduce drainage connection are the most effective management solution to the protection of stream biota in urban catchments. Christopher J. Walsh – Cooperative Research Centre for Freshwater Ecology, Monash University, AU:

Windows of Opportunity for Low Impact Design STORMWATER INFRASTRUCTURE Age Distribution Typical Lifetime REPLACEMENT infrastructure inertia lock in effects / path dependency windows of opportunity to explore alternative design

Background information Location: Windy Ridge, North Shore City Sub-catchment size: 2.6 ha Historical disposal: soakage (soakpits) The problem: serious overland flow problems

Two approaches … 1. The conventional approach reticulating the area with stormwater pipes and/or flowpaths 2. The low impact approach using an engineered system of gravel trenches, contoured flowpaths and minimal piping backed up with raintanks retrofitted to existing properties Photo by Nadine Wakim

Methodology Compare the Life Cycle Costs of the two approaches Reveal aspects that impose higher costs on the low impact approach Highlight changes and potential for future cost savings

Life Cycle Costing Australian and New Zealand Standard (AS/NZS 4536:1999) Life cycle costing is the process of assessing the cost of a product over its life cycle or portion thereof. Life cycle cost is the sum of acquisition and ownership costs of an asset over its life cycle from design stage through manufacturing, use, maintenance and disposal.

Life Cycle Costing

Assumptions for the LCC Timeframe: 50 to 100 years Type of cost: real costs with 2005 as base year Discount rates: 3.5% and 10% real discount rates Water savings: 125$/raintank/year

Acquisition Costs Conventional - based on the pipe layout used for the initial engineering costing - new costing data from recent contracts Low Impact - cost data from the construction contracts - NSCC accounting data - costs occurred before 2005  2% inflation factor

Renewal Costs Pumps replaced every 10 years at NZ$600 Raintanks replaced every 25 years at NZ$2350

Operation and Maintenance Costs Conventional - maintenance pipe: NZ$ 1/linear meter pipe Low Impact - maintenance pipe: NZ$ 1/linear meter pipe - operation of one pump: NZ$ 10/year - maintenance of one pump: NZ$ 20/year - maintenance of one raintank: NZ$ 80/year - raintank registry and inspection: NZ$ 10/raintank/year - maintenance gravel trench and channel: -

Not quantified Decomissioning costs Cost of land Risk costs Photo by Nadine Wakim

Results

Lessons LCC a useful analytical tool for: comparing different options potentially improve design highlight the importance of pre-acquisition costs budgeting cost sharing assess financial sustainability

Looking behind the numbers … In favour: - Staff interest / commitment - Lack of conventional infrastructure in place - Commitment to low impact at strategic level (NSCC Stormwater Strategy 2004) - Funding opportunities (Infrastructure Auckland funding)

Looking behind the numbers … Disadvantages / Changes: -Expertise and experience with the conventional approach - Lack of expertise and experience with the low impact approach  Experience building up (pilot projects) - Public perceptions  Experience building up with the consultation process - Technical uncertainties  Technical flexibility exposed

Looking behind the numbers … Disadvantages / Changes: -Standard restrictions  Restrictions removed - Lack of legal arrangements  Legal arrangements sorted - High perceived risk associated with assuring continuous operation and maintenance  Stormwater Policy: Responsibilities for Stormwater Infrastructure

Investment in eco-innovation The novelty of the project translated into higher costs for design, project management and consultation. These costs are expected to drop in the future. The externalities remained out of the scope of this analysis. Market distortions will impact such analysis.

Dynamic framework Increased data availability on cost elements Changing public attitudes Future water prices Criteria Performance against these criteria are changing. Performance against the COST MINIMISATION criterion

Acknowledgements The authors are grateful to Nadine Wakim, Barry Carter, Frank Tian, Viv Eyberg and Ban Aldin for insightful discussions.